What is Integrated Safety Management?
Its a Framework to integrate safety and work It helps in protecting the Worker, Public, and
Environment
It is a common sense approach to Doing WorkSafely.
7/30/2019 ISM General Awareness Final
3/17
Brookhaven Science AssociatesU.S. Department of Energy3
What is Integrated Safety Management?
Five ISM Core Functions1. Define the scope of work
2. Identify and analyze the hazards
3. Develop and implement hazard controls
4. Perform work safely within controls
5. Feedback and improvement
1.
DefineWork
2.
IdentifyHazards
3.
DevelopControls
4
.Perform work
within
Authorizations
5
.
Feedbackand
Improvement
7/30/2019 ISM General Awareness Final
4/17
Brookhaven Science AssociatesU.S. Department of Energy4
Integrated Safety Management Applicability
When is ISM Applicable?Always -- To All Work
Throughout the life cycle of research, design, construction,operations and maintenance
The ISM bottom line: All Work PlannedPre-Work Screening
Plan of the Day Meetings
Pre-Job BriefingsJob Site Walkthroughs
Experimental Safety Reviews (ESRs) / Work Permits
7/30/2019 ISM General Awareness Final
5/17
Brookhaven Science AssociatesU.S. Department of Energy5
How is ISM Implemented?Through the application of:
Worker Safety and Health Program
Environmental Management System (EMS)
The 5 Core Functions (Institutional, Facility,
Activity Levels)Institutional Level WorkPlanning and establishing BNL
goals, objectives and operating/performance expectations
Facility Level WorkFacilities/Buildings operational boundary
activities (e.g. Facility Use Agreement, Safety Assessment Document)Activity Level WorkScience and technology machine
operations, basic and applied research and operations, maintenance,construction and Skill of the Worker activities
7/30/2019 ISM General Awareness Final
6/17
Brookhaven Science AssociatesU.S. Department of Energy6
Skill of the Worker (SOW)
1. Work scope is prescreened bySupervisor/Manager.
2. Hazards are pre-identified. Workers are trained toidentify hazards. Boundaries are set for SOW
3. Hazard controls are pre-identified. Controls are inplace and/or implemented by qualified workers.
4. Work is authorized and supervisedbySupervisor/Manager. Interrupt/stop work if
conditions extend beyond training andexperience.
5. Verbal feedback, occasional written feedback.
7/30/2019 ISM General Awareness Final
7/17
Brookhaven Science AssociatesU.S. Department of Energy7
ISM Awareness/Expectations1. What kind of work do you perform? Small Science & Technology (i.e. basic and applied research) Operations, maintenance, construction & Support (i.e. electrical,
carpentry, mechanical, grounds, operator, etc.) Large Science &Technology Machines (i.e. NSLS electrician,
RHIC operator, etc.)
Skill of the Worker Activities2. How do you define the scope of work? Job site walk downs, Pre-job briefings Work Plans, Technical Work Documents, Work Permits,
Radiological Work Permits, Experimental Safety Reviews
Work screening to determine if the activity falls within the Skill ofthe Worker
Plan of the Day meetings activity discussions and assignment ofwork activities
Standard Operating Procedures (SOPs) for operations
7/30/2019 ISM General Awareness Final
8/17
Brookhaven Science AssociatesU.S. Department of Energy8
ISM Awareness/Expectations3. How do you identify hazards associated with your
work? Pre-job planning meetings, pre-job walkthroughs, review of
procedure precautions
Experimental Safety Reviews (ESRs), Work permit, Standard
Operating Procedure (SOP) Training, Pre-Job Screening
Job risk assessment (JRA) / Facility Risk Assessments (FRA),Environmental Process Assessments, Job Specific WorkPermit reviews
Industrial Hygiene and Radiological Control surveys Facility Use Agreements (FUAs) operating boundary and
facility hazards
Job Hazard Analysis, Radiological Work Permits (RWPs)
7/30/2019 ISM General Awareness Final
9/17
7/30/2019 ISM General Awareness Final
10/17
Brookhaven Science AssociatesU.S. Department of Energy10
ISM Awareness/Expectations6. How are you monitored for exposure to hazards? Facility Support Representatives, Radiological Control Technicians
(RCTs) and Safety & Health Service Representatives performmonitoring
Occupational Medicine Clinic (OMC) provides Medical Surveillance(e.g. lead, noise, blood borne pathogens, etc.)
TLDs, whole body counts, bioassay, etc7. What and/or who authorized you to perform this work? Manager/Supervisor verification that adequate preparations have been
completed so that work can be performed safely
Work Authorization by Supervisors and Managers approval by issuance
of ESRs, Work Permits, SOPs & RWPs Daily job assignments and pre-job briefings by supervisors/managers
Work screening to determine if the activity falls within the Skill of theWorker
7/30/2019 ISM General Awareness Final
11/17
Brookhaven Science AssociatesU.S. Department of Energy11
ISM Awareness/Expectations8. How do you know you are trained and qualified to perform
this work? Assigned job training assessment (JTA) define technicalqualifications required
Receive notifications well in advance of qualifications expiring(Brookhaven Training Management System [BTMS])
Meeting the training requirements documented on ESRs, Work
permits, SOPs and RWPs. Supervisors, facility support and work control coordinators verify
qualifications before work is authorized to start9. How do you know what personal protective equipment (PPE)
is required to do your work? What types of PPE do you use? Standard Operating Procedure (SOP), ESR, Work Permit, Work Plan,
RWP, Material Safety Data Sheets (MSDS), & through Training Safety glasses, safety shoes, double set of anti-contamination
clothing (Tyvek), hard hat, ear protection, etc. By speaking to your ES&H Coordinator, Industrial Hygiene Group or
your Facility Support Representative
7/30/2019 ISM General Awareness Final
12/17
Brookhaven Science AssociatesU.S. Department of Energy12
ISM Awareness/Expectations10. Under what conditions are you authorized to stop
work? Radiological work that does not meet Laboratory
requirements or creates a threat of unplannedradiological exposures or releases
Imminent danger exists when you or a co-worker areexposed to a hazard that could result in injury, death, orwhen there is a significant risk of environmental orequipment damage, and when immediate action isrequired
Radiological Stop Work and Stop Work subject areas To issue a stop work order you must have been trained in stop
work procedures
7/30/2019 ISM General Awareness Final
13/17
Brookhaven Science AssociatesU.S. Department of Energy13
ISM Awareness/Expectations11. When you are performing the job, what happens if
additional/new hazards are identified or the workscope changes? If imminent danger exist, issue stop work order
Inform supervisor of changes in work conditions or of new
hazards Consult with ES&H coordinator, Facility Support, Work ControlCoordinator/Manager and/or Subject Matter Expert to developand implement hazard controls (engineering, administrative,pre-work survey or screening)
Have an authorized person amend the work plan, permit, SOP,RWP, ESR etc.
Conduct pre-job briefing to inform personnel of new hazards,controls and/or training requirements
Signoff on and issue revised work authorization documents
7/30/2019 ISM General Awareness Final
14/17
Brookhaven Science AssociatesU.S. Department of Energy14
ISM Awareness/Expectations12. What is your responsibility regarding personal and co-worker
safety, and where is it documented? Follow prescribed rules and procedures within your authority Implement Stop Work Order, if you are trained in Stop Work
Procedures R2A2, Performance Appraisal Job Training Assessments (JTAs)
13. How do you provide feedback about work performed, and towhom? (Give examples) Feedback is provided through post job reviews Documented on work permits Communicate improvements to processes to Principal Investigators,
Supervisors and managers SOPs, RWPs, work permits,experimental safety reviews (ESRs), and/or Technical WorkDocuments are revised/changed to reflect improved processes
Lessons Learned (LL) communications are developed and submittedto the BNL LL Coordinator
Verbal communications with Supervisors & Managers
7/30/2019 ISM General Awareness Final
15/17
Brookhaven Science AssociatesU.S. Department of Energy 15
ISM Responsibilities1. Know and support the message that All work is planned
2. Know how work is planned and controlled in your everyday workactivities
3. Be actively involved in identification, planning and improvementof work and work practices
4. Be familiar with your facility documentation and work
authorizations, including facility operating boundaries [FacilityUse Agreements (FUAs)], Job Risk Assessments (JRAs) andFacility Risk Assessments (FRAs) [i.e. how they are integrated inwork planning & control]
5. Display individual Attitude and Responsibility for Safetyi. Accept responsibility for safe performance
ii. Have a questioning attitude by challenging assumptionsiii. Consider potential adverse consequences of planned actionsiv. Assist each other in preventing unsafe acts or behaviors
7/30/2019 ISM General Awareness Final
16/17
Brookhaven Science AssociatesU.S. Department of Energy 16
ISM Responsibilities6. Even though an activity may seem safe, review a new task to
identify if activities go beyond the scope of work authorized, andthus require additional controls and authorizationsi. Take two minutes to verify that current activities have not crept
beyond the scope of work authorizedii. Always perform work within established controls and
authorizations
7. Stop and seek input from supervisors, managers, ES&HCoordinators, Building Managers or Facility SupportRepresentatives if conditions change and/or work extends beyondauthorizations
8. Consider the influence of human factors can have on yourdecision making
i. Am I cutting corners by rushing to meet a deadline?ii. Am I taking hazards/controls for granted because Ive done this
many times before?iii. Is my desire to succeed technically compromising sound
Environment, Safety and Health (ES&H) judgment?
7/30/2019 ISM General Awareness Final
17/17
Brookhaven Science AssociatesU.S. Department of Energy 17
Have any questions?
Contact any of the following: Your Supervisor ES&H Coordinator
Facility Support Representative
S&HS IH Representative
ISM SME Steve Coleman