ISO Steel Drill Pipe

  • Published on
    16-Dec-2015

  • View
    21

  • Download
    8

Embed Size (px)

DESCRIPTION

drill pipes

Transcript

  • ISO 2003 All rights reserved

    Document type: International Standard Document subtype: Document stage: (30) Committee Document language: E C:\01-TC67\0-sc5\wg1\11961\1-To SC 5 for vote CD 11961\ISO 11961(E).doc STD Version 2.1

    ISO TC 67/SC 5 N 311 Date: 2004-03-10

    ISO/CD 11961

    ISO TC 67/SC 5

    Secretariat: JISC

    Petroleum and natural gas industries Steel drill pipe Specification Industries du ptrole et du gaz naturel Tige de forage en acier Spcification

  • ISO/CD 11961

    ii ISO 2003 All rights reserved

    Copyright notice

    This ISO document is a working draft or committee draft and is copyright-protected by ISO. While the reproduction of working drafts or committee drafts in any form for use by participants in the ISO standards development process is permitted without prior permission from ISO, neither this document nor any extract from it may be reproduced, stored or transmitted in any form for any other purpose without prior written permission from ISO.

    Requests for permission to reproduce this document for the purpose of selling it should be addressed as shown below or to ISOs member body in the country of the requester:

    [Indicate : the full address telephone number fax number telex number and electronic mail address

    as appropriate, of the Copyright Manager of the ISO member body responsible for the secretariat of the TC or SC within the framework of which the draft has been prepared]

    Reproduction for sales purposes may be subject to royalty payments or a licensing agreement.

    Violators may be prosecuted.

  • ISO/CD 11961

    ISO 2003 All rights reserved iii

    Contents Page

    Foreword .............................................................................................................................................................v

    Introduction........................................................................................................................................................vi

    1 Scope ......................................................................................................................................................1

    2 Conformance .........................................................................................................................................1 2.1 Normative references............................................................................................................................1 2.2 Units of measurement...........................................................................................................................2

    3 Normative references............................................................................................................................2

    4 Terms, definitions, symbols and abbreviated terms .........................................................................3 4.1 Terms and definitions ...........................................................................................................................3 4.2 Symbols..................................................................................................................................................7 4.3 Abbreviated terms .................................................................................................................................8

    5 Information to be supplied when placing orders ...............................................................................8

    6 Requirements for drill pipe...................................................................................................................9 6.1 General ...................................................................................................................................................9 6.2 Dimensions, masses and connections ...............................................................................................9 6.3 Material requirements .........................................................................................................................11 6.4 Process of manufacture for drill pipe................................................................................................12 6.5 Traceability...........................................................................................................................................12 6.6 Inspection and testing - general ........................................................................................................13 6.7 Testing of welds ..................................................................................................................................14 6.8 Tensile test ...........................................................................................................................................14 6.9 Hardness test .......................................................................................................................................15 6.10 Charpy V-notch impact test................................................................................................................15 6.11 Transverse side bend test ..................................................................................................................16 6.12 Product performance testing .............................................................................................................16 6.13 Imperfections and defects in drill pipe..............................................................................................16 6.14 Visual inspection of drill pipe the weld zone....................................................................................17 6.15 Non-destructive examination of the weld zone................................................................................17 6.16 Marking of drill pipe ............................................................................................................................18 6.17 Minimum facility requirements for drill pipe manufacturers ..........................................................19 6.18 Documentation requirements of drill pipe ........................................................................................19

    7 Requirements for drill pipe body .......................................................................................................20 7.1 Dimensional and mass requirements................................................................................................20 7.2 Material requirements .........................................................................................................................21 7.3 Process of manufacture......................................................................................................................22 7.4 Traceability...........................................................................................................................................23 7.5 Testing general .................................................................................................................................23 7.6 Testing of chemical composition ......................................................................................................23 7.7 Tensile tests.........................................................................................................................................24 7.8 Charpy V-notch impact tests..............................................................................................................25 7.9 Pipe body wall thickness....................................................................................................................26 7.10 Internal upset .......................................................................................................................................26 7.11 Internal profile......................................................................................................................................26 7.12 Straightness.........................................................................................................................................26 7.13 Upset alignment...................................................................................................................................27 7.14 Mass determination.............................................................................................................................27 7.15 Imperfections and defects of drill pipe body....................................................................................27 7.16 Visual inspection of drill pipe body...................................................................................................27

  • ISO/CD 11961

    iv ISO 2003 All rights reserved

    7.17 Non-destructive examination .............................................................................................................28 7.18 Marking .................................................................................................................................................30 7.19 Minimum facility requirements for drill pipe body manufacturer ...................................................31 7.20 Documentation requirements.............................................................................................................31

    8 Requirements for tool joints...............................................................................................................32 8.1 Dimensional requirements..................................................................................................................32 8.2 Material requirements .........................................................................................................................33 8.3 Process of manufacture......................................................................................................................33 8.4 Testing general .................................................................................................................................34 8.5 Testing of chemical composition.......................................................................................................35 8.6 Tensile tests .........................................................................................................................................35 8.7 Hardness tests .....................................................................................................................................36 8.8 Charpy V-notch impact tests ..............................................................................................................36 8.9 Product performance testing..............................................................................................................37 8.10 Imperfections and defects ..................................................................................................................37 8.11 Non-destructive examination .............................................................................................................38 8.12 Marking .................................................................................................................................................38 8.13 Minimum facility requirements for tool joint manufacturers ..........................................................39 8.14 Documentation requirements for tool joints.....................................................................................39

    Annex A (normative) Tables in SI units ..........................................................................................................41

    Annex B (normative) Figures in SI (USC) units ............................................................................................62

    Annex C (normative) Tables in USC units ......................................................................................................77

    Annex D (normative) Purchaser inspection................................................................................................101 D.1 Inspection notice ...............................................................................................................................101 D.2 Plant access .......................................................................................................................................101 D.3 Compliance.........................................................................................................................................101 D.4 Rejection.............................................................................................................................................101

    Annex E (normative) Supplementary requirements ....................................................................................102 E.1 SR2 Drill pipe body: defects, imperfections and NDE for Grades E, X and G.............................102 E.2 SR15 Drill pipe: test certificates.......................................................................................................102 E.3 SR19 Pipe body: Charpy V-notch impact toughness testing of Grade E ....................................102 E.4 SR20 Alternative low temperature Charpy V-notch impact requirements...................................103 E.5 SR23 Weld zone: lot size...................................................................................................................103 E.6 SR25 Weld zone: minimum requirements for Charpy V-notch impact toughness testing ........103

    Annex F (informative) Procedures used to convert from USC units to SI units .......................................104 F.1 Background ........................................................................................................................................104 F.2 General................................................................................................................................................104 F.3 Pipe dimensions ................................................................................................................................105 F.4 Plain-end linear mass........................................................................................................................106 F.5 Tensile tests .......................................................................................................................................106 F.6 Charpy impact energy .......................................................................................................................107 F.7 Temperature .......................................................................................................................................107

  • ISO/CD 11961

    ISO 2003 All rights reserved v

    Foreword

    ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies...

Recommended

View more >