1UCSB Isolated Bad CAC Bonding Bonding Meeting-21/10/03
Isolated Bad-CAC Strip at UCSB• For first 57 modules
produced at UCSB, there was a slight misunderstanding of bonding rules Bonded isolated Bad CAC
channel that were not also marked as a bad IDIEL channel
• 23 of 57 modules had at least one such channel 42 channels total
• Plucking channels would result in a few more Grade B modules Not a large concern
0
5
10
15
20
25
30
35
40
0 1 2 3 4 5
Number of Faults
Num
ber o
f Mod
ules
2UCSB Isolated Bad CAC Bonding Bonding Meeting-21/10/03
Testing Results on Isolated Bad CAC Strips
• All modules have been fully tested with ARCS and LT system Both pulsed and
continuous LED tests taken
• ALL of the 42 strips had regular test results (passed) No problem seen with
these channels
CAC@ 100 Hz measured (in pF) at QTC
0
1
2
3
4
5
6
7
8
9
-50 50 15
0250
350
450
550
650
800
900
1000
1100
CAC@ 100 Hz