IT Planning and IT Planning and ManagmentManagment
Lecture 6: Information System
for a Volunteer Center:System Design for Not-For-Profit
Organizations with Limited ResourcesPart 2: SETTING THE STAGE
Collage of Information
Technology University of Palestine, Gaza
Prepared by:Prepared by:
Mahmoud Rafeek AlfarraMahmoud Rafeek Alfarra
قالوا
قال أفالطون: التي التكلفه شيئا فسوف يضطرالنصيحةمن يأبى اليوم قبول
بأغلى سعراألسففي الغد إلى شراء
Outlines
Project Team
Project Initiation
The system request
Feasibility Study
Open discussion
Project TeamProject Team
Graduate student in Computer Information Systems.
Senior students of Management Information Systems.
Analyst.A director’s assistant. Just as in any project team, different
members of the IS team have have different abilitiesdifferent abilities and personalities
Project TeamProject Team
In terms of capabilities, JeffJeff is skilled in project management, system
analysis, system design, database development, and client-server programming.
LyndsayLyndsay is skilled in project management, system analysis, and systems documentation.
JudyJudy has no prior IS project experience, and requires an extensive amount of coaching on how to accomplish tasks in an IS project.
And so on …
Project Initiation
Early in the project cycle, Jeff and his project team met with Marilynn and others from VCR to initiate the project.
The VCR team was not familiar with the system development life cycle (SDLC) for constructing information systems.
Jeff and the project team explained the concepts behind SDLC and helped Marilynn create a system request.
The system The system requestrequest
Feasibility StudyFeasibility Study
After the system request was developed, Lyndsay and Jeff conducted a feasibilityconducted a feasibility study.
The feasibility study focused on economic, technical, and organizational feasibility.
Lyndsay and Jeff created extensive documentation to support the summary conclusions indicated.
Economic feasibilityEconomic feasibility
Based on the current available financial resources from the Volunteer Center, it has been determined that the proposed solution must be relatively inexpensiverelatively inexpensive.
Even with this budgetary constraint, the project team believed a solution can be obtained.
Technical feasibilityTechnical feasibility With the young technical skills of the
project team consisting of senior MIS students, a certain degree of risk appears certain degree of risk appears to be evidentto be evident.
The faculty resources will guide the student project team in all aspects of the project.
Organizational feasibilityOrganizational feasibilityAn analysis of VCR staff indicates:
All end users are proficient with PCsThe VCR staff appears to be very open to
accepting a new completely electronic system, as the current processes are highly inefficient.
Meets the criteriaMeets the criteria Based on the above analysis, the project team concluded that the project meets the the project meets the criteriacriteria for economic, technical, and organizational feasibility.
Open discussionOpen discussion