IT3853-EN Design , Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April 2013 Magali Mendez/ EN-CV. IT3853-EN Bidders Conference – 29.04.2013. Building 192. Summary of estimated flows . - PowerPoint PPT Presentation
Citation preview
Engineering DepartmentEN
1
IT3853-EN
Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192
Bidder’s conference – 29th April 2013
Magali Mendez/ EN-CV
IT3853-EN Bidders Conference – 29.04.2013
Engineering DepartmentEN
Building 192
Engineering DepartmentEN
Engineering DepartmentEN
Summary of estimated flows
Basement
Forced air m³/h Smoke extraction m³/h Fresh air (for smoke extraction system) m³/h Return air m³/h
zones: OP/CF/CO Zone: BT zones:
OP/CF/CO Zone: BT zones: OP/CF/CO Zone: BT Stairs zones:
OP/CF/CO Zone: BT
12 000 4 000 14 000 5 000 8 400 3 000 1 800 12 000 4 000
Ground floor
Forced air m³/h Smoke extraction m³/h Fresh air m³/h Return air m³/h
zone: HT Zone: OP zone: HT Zone: OP zone: HT Zone: OP zone: HT Zone: OP
3 000 6 200 0 0 3 500 0 3 000 6 200
Engineering DepartmentEN
AHUs to be supplied and installed by the contractor
Identification
Function location Flow rate[m3/h]
Fresh air intake [m3/h]
UACV1-00258
Modified Basement 192-001 16'000 1'500
UACV1-00259
NewR-Zone OPR-Zone HT
192-001 9'200 1'700
Engineering DepartmentEN
Exhausts fans for smoke extraction to be supplied and
installed by the contractorIdentification Function location Flow rate
[m3/h]
UUV1-00532 Fresh air for smoke extraction – Basement Roof 192 11'400
UUV1-00533 Fresh air for smoke extraction – stairs Roof 192 1'800
UUV1-00534 Fresh air for smoke extraction –Ground floor Zone HT Roof 192 3’500
UAT2-00028 Smoke extraction – Basement Roof 192 19'000
Chapter 7.2.4 of the rule EN 13501-4
Engineering DepartmentEN
The Supply
• Design • Dismantling of the existing installation• Design and studies of Smoke extraction and
HVAC systems• Packing• Shipping to Bldg.192• Installation• Tests• Commissioning• Documentation
Engineering DepartmentEN
The HVAC and smoke extraction systems (summary)
• Ducts for ventilation system• Exhaust fans, fresh air fans, ducts • Dampers, fire dampers• Stainless steel pipework, supporting, metal
structures,• Instrumentation, controls cubicle, cabling.
Engineering DepartmentEN
Specification of the Supply: Electricity
Engineering DepartmentEN
Specification of the Supply: Electricity
Included in the supply
Erratum: limit of the supply includes the
power cubicle, revised version of this
document to be provided by CERN
Erratum: limit of the supply includes the
power cubicle, revised version of this
document to be provided by CERN
Engineering DepartmentEN
Specification of the Supply: Controls
Engineering DepartmentEN
Specification of the Supply: Controls
Clarification on the information required for CERN to prepare the PLC control system software
The contractor shall allow in the schedule a minimum four weeks for the programming of the PLCs by CERN. In order to start the programming of the control system, CERN requires the following four documents to be finalised - submitted and approved:1. P&IDs - with the correct GMAO and tag references.2. Electrical Schematics3. I/O List4. Functional DescriptionIt is therefore essential that the above documentation and drawings are submitted, revised as required and finalised in accordance with the schedule, such that the preparation of the controls does not impact the scheduled testing and commissioning period.
Engineering DepartmentEN
Building 192
Technical RoomSpace
constraints
Engineering DepartmentEN
Roof installations
Fresh air for smoke
extraction- Ground floor
HT zone
Fresh air for smoke
extraction- Stairs
Air conditioning
Smoke extraction- Basement
Fresh air for smoke
extraction-Basement
Engineering DepartmentEN
Ground floor
Engineering DepartmentEN
Basement
Engineering DepartmentEN
Specification of the Supply
Engineering DepartmentEN
Schedule
Engineering DepartmentEN
Thanks for your attention!
Questions?