SCR -Training Information Management System Kaplan University System Analysis & Design Unit 10 Project Tanya Day, Stephanie Faison, Kevin M. Harris, Tammy Nikolova, Richard Rickard, Alma Williams

IT460_TeamD_Unit10_Final_1302728389

Embed Size (px)

DESCRIPTION

IT

Citation preview

  • SCR -Training Information Management

    System

    Kaplan University

    System Analysis & Design

    Unit 10 Project

    Tanya Day, Stephanie Faison, Kevin M. Harris,

    Tammy Nikolova, Richard Rickard, Alma Williams

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    2

    Abstract

    This document is a final assessment and recommendation for the SCR Training

    Information Management System. The main objective of this paper is to provide a detailed plan

    for the structure and implementation of the TIMS project. The information addressed will cover

    the systems architecture including network topology, Web-centricity, scalability, and security.

    The systems configuration will include a complete testing plan demonstrating support of its

    reliability. The capacity planning will complete the range of requirements of this comprehensive

    model supporting the SCR TIMS venture.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    3

    Part 1. System architecture recommendations:

    The best option for TIMS would be to implement client-server architecture because the

    system will be fast and flexible. The application development will be object oriented and will

    empower the user which in turn will improve productivity. The client-server architecture will

    provide flexible processing options and allow IT professionals to share and configure the system.

    Moreover, data can be distributed and placed closer to the user and that would be the best storage

    option. A very flexible, multivendor model can be used for hardware and software integration. A

    web server should be used for the system to allow Internet based communication between the

    server and the clients.

    To allow sharing of data and hardware resources, TIMS should join a WAN to connect

    LANs, because when a user has access to data on a LAN or WAN, they see data as if it were

    stored on their computer because the network is transparent. Distributed systems have great

    capabilities because they can connect more than one LAN or WAN. A file sharing architecture is

    recommended where the client handles:

    o The user interface

    o Sends data request to servers

    o Receives data files from the server

    o Runs application programs locally to process data

    o Sends data files back to the server

    The file server handles the following tasks:

    o Receives data requests from the client

    o Sends data files to the client

    o Stores data files

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    4

    o Manages multiuser access

    o Generates LAN traffic

    o Manages data backup

    A thin client design is recommended because most of the processing logic is located at the

    server. The advantages of using a thin client include:

    o Lower network traffic because most interaction between code and data takes place

    at the server.

    o Faster performance because less network traffic is required

    o Lower initial cost because workstation hardware requirements are not as stringent

    o Maintenance cost is lower because most program code resides on the central

    server

    The disadvantages of using a thin client design include:

    o More difficult development because developers must optimize the division of processing

    logic

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    5

    Client/Server Tiers:

    A three tier design is recommended because it will allow the user interface on the client and data

    can be stored on the server which can enhance overall performance by reducing the data server

    workload.

    LAN

    Printer

    Scanner

    File

    Server

    Client

    Client

    Client

    Data Application

    Logic User

    Interface

    Data

    Server

    Applica

    tion

    Server

    Client

    Part 2. Detailed description and recommendations for architecture:

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    6

    The Business Dictionary defines legacy as Information stored in an old or obsolete

    computer or format make it difficult to process or access. Legacy data is data that is difficult to

    access and transport to a client/server environment. With the changes in technology, companies

    need to keep up with competitors. If they are using software used when they initially started,

    viewers / clients may have difficulty viewing or using the application. Migration is needed at

    some point within an organization from older applications that follow open or standard

    programming interfaces.

    In order to get our legacy data to the new system we can perform data migration. Before

    doing this we need to ask ourselves a few questions first:

    Should we bring the data over to the new system?

    Should we bring all or part of the data if we decide to migrate?

    Which parts, if parts only?

    Should certain data be filter in or out?

    Is our data extractable?

    Do we have someone in-house who can write the script to migrate data?

    Will we hire someone if no one in-house can?

    Will the task be performed manually?

    When deciding on data migration, we need to take all factors into consideration before

    we decide on moving the data to the new system (Infotechnet, 2009).

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    7

    If a decision has been made to migrate data, before moving can begin the following

    analyses must be done:

    Analyze and define source structure. Examine the structure of data in existing

    system

    Analyze and define target structure. Examine the structure of data in new system.

    Perform field mapping. Mapping needs to be done between the existing and new

    system.

    Define the migration process. Will it be done manually or automate?

    Consider the list of the system requirements including the inputs, outputs,

    processes, performance and controls that SCR is looking in the new system.

    o Outputs

    TIMS must provide a master list of courses, students, and

    instructors

    TIMS should produce transcripts and verify records for former

    students

    TIMS could produce a class roster providing background

    information about students

    TIMS should generate registration and class roster printouts

    Produce schedule printouts of all courses available for the next 90

    days

    Generate report on courses conducted and a listing of instructor

    assignments

    Report for SCR's corporate clients on their students

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    8

    Generate signature ready certificates with new logo for

    successfully completing a course

    o Inputs

    TIMS must have future online form for students to input

    registration information

    Input screen should resemble systems used by other schools

    Input schedule report for future reference to see which classes are

    most popular

    Input links to SCR Services: Systems Support Group,

    Network/Web Group, Business Solutions Group, Project

    Management Group

    o Processes

    TIMS must interact with the accounting system of SCR Associates

    TIMS must have well organized Records

    Send questionnaire to former and prospective students

    System need to identify popular course offerings to estimate the

    number of expected students

    Accounting system should reconcile student accounts and bill

    corporate clients for balances

    Consolidate all SCR training in the new training group

    o Performance

    TIMS must be operational within six months

    TIMS must support future online registration

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    9

    TIMS must track registration up to the day course is in session

    TIMS must keep track of courses, instructors, scheduling,

    registration, students, and grades

    TIMS must track up-to-date industry certification requirements

    TIMS should track credits earned toward IT industry certification

    requirements

    o Controls

    Students must have pre-registered for course before joining a

    training session

    The system must have security for login screen

    TIMS must have a minimum and maximum number of students for

    courses open to the public

    Grades should not be altered by students

    Different levels of security should be provided to system

    administrators than the students

    SCR would like for the new TIMs (Training Information Management System)

    system to be able to interact with the accounting system that is in place now.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    10

    Centricity is defined as centering on or focusing on. It is usually used with another word.

    Web centricity is an example of this and it means focusing on the web. Shelly Cashman

    Rosenblatt defines web-centric as a strategy or approach that emphasizes a high degree of

    integration with other Web-based components. A Web-centric architecture follows Internet

    design protocols and allows a company to merge new applications into its e-commerce strategy

    (2008).

    SCR would like to offer online registration for courses that are available and keep track

    of earned credits toward IT industry certification.

    0

    1

    2

    3

    4

    5

    6

    Inputs Outputs Process Control

    TIMs

    Scheduling Registration Records

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    11

    Part 3. Detailed description and recommendations for architecture:

    The TIMS system requires architected Scalability, Security, and Batch processing.

    These elements will provide the flexibility of a well balanced system providing longevity to

    support the SCR-TIMS training objective for years to come.

    The SCR-TIMS System Analysis team is designing the hardware and software to

    accommodate scalability. Generally speaking this means that a system can be expanded,

    modified, or downsized easily to meet the rapidly changing needs of the business enterprise. This

    concept relative to the SCR-TIMS project is being looked at from more of a growth perspective

    for expansion. The systems educations structure will be created with accommodations for

    potential development opportunities in the areas of classes, staffing, and students. Our primary

    focus will be in the areas of increasing support of the student base by developing class

    opportunities to increased revenue.

    The new network hardware will be easily integrated to the IT infrastructure by

    connecting to an existing router attached to the legacy system. (See Figure below)

    Network Infrastructure

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    12

    The new SCR-TIMS hardware is a Star Wired Network with a centralized network server

    combined with a wireless router access point connected to a Web server. (See Figure below)

    This design was chosen for many reasons. The primary reason for this network control

    configuration was the ability to use multiple data storage locations and the unrestricted data flow

    during batch processing of the classroom data stores to the TIMS dB. The classroom servers are

    robust enough to handle multiple classrooms but for the sake of simplicity the diagram represents

    one per class.

    Figure of Integrated IT Star Network Structure

    Classroom

    Work Station 3

    Staff Laptops

    Remote Access

    TIMS Training Center Network Layout

    Legacy

    System

    Classroom

    Work Station 2

    Classroom

    Work Station 1

    Classroom

    Work Station etc...

    Web Server

    Student

    Remote Access

    Network Server

    Class Room Server 1 Class Room Server 3Class Room Server 2 Class Room Server 4

    Class Room Server etc...

    Wireless Router

    TIMS dB

    Router

    Course

    Data Store

    Network Printer

    Class Room Network

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    13

    The Wireless router and the Web server fit well with the need to be scalable in a volatile

    market. There purpose is to create an environment for mobility. The wireless allows easy access

    from anywhere on the facilities premises and the web server provides flexibility for remote

    access. Both of these features are required to be competitive in todays educational market.

    Batch processing is data collected in a location processed and transferred in groups to

    another location. In the TIMS case the data is stored on a class room dB until it is time to transfer

    the data. The course data storage process is to minimize data transfer during peak hours of the

    day. This is what was referred to in the prior paragraph as TIMS Batch processing. The

    course/student information is saved on a local database during the day. The transfer is directed

    by the classroom server at a set point in time when network traffic is minimal through the

    network server to the primary TIMS database. (See Figure below) There is a level of control that

    will be implemented during batch processing. To promote data accuracy and quality during this

    process a log file will be produced to capture all elements that have been transferred to TIMS.

    This also reduces direct access to TIMS eliminating security exposures.

    Classroom

    Workststion

    Course

    Student

    Information

    TIMS Batch Processing Flow

    Information

    Collect Program

    Daily

    Info-Collection

    Program

    Reports

    Certificates

    Generated

    Course Student

    Information file

    TIMS Course

    Student

    Information

    Figure of Batch Processing Flowchart

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    14

    SCR-TIMS IT security management is universally an issue that will be addressed in hardware,

    software, and procedural controls to safeguard and protect this system and its data from internal

    and external threats. All of the growth requirements have been carefully planned with security

    measures present. Our design will provide measures to detect intrusions and provide stringent

    rules for passwords and user identification. The TIMS system will be integrated with the legacy

    security features of the existing system.

    Hardware Physical Security Management: This function entails the physical security

    of assets protecting them from being stolen or tampered with.

    All the servers will be housed in Computer rooms with secure card reader with

    personal identification access points. Emergency access will be alarmed to maintain the

    integrity of each computer room.

    The Network Backbone infrastructure will be secured with physical separation in

    IT closet located in each servers computer room.

    The desktop computers will be physically secured to each classroom desk to

    prohibit the units being stolen.

    Notebook computers will primarily be used by staff and this is our most

    vulnerable asset to manage. While being used on site staff will be responsible to cable

    lock each unit to a secure point in their office or cubical.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    15

    Network Security Management: This is the fundamental premise for the SCR-TIMWS

    system. Devices connected together transmitting and receiving data between each other.

    Network security issues stem from the need to protect personal information from

    deviant individuals. Information transmitted without the proper protection remains

    vulnerable to unwarranted attacks.

    SCRs reasoning for Encrypting network traffic is to reduce the exposure for

    intercepted transmissions. An intercepted transmission if encryption is implemented

    causes the contents to be masked versus plain text which can be easily read and stolen.

    We have potential for sensitive personal information being transmitted including

    passwords.

    We will be using Public key encryption on our wired network which will provide

    the masked protection required if someone has the luck to infiltrate our system network.

    This is a bit more secure than our wireless network because it resides behind the systems

    firewalls.

    TIMS wireless network will be using the highest level of Wi-Fi Protected Access

    (WPA2) available. This Temporal Key Integrity Protocol (TKIP) uses a stronger

    encryption. This is done by creating a new encryption key for each session creating

    variability the standard. This minimizes anyone being able to crack the encryption

    methodology being used.

    SCR will not incorporate a private network due to the cost associated with the

    hardware contingency of a private network line. We will be tunneling by use of a virtual

    private network using the encryption techniques available.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    16

    SCR will have a unique port assigned to connect its services. This port will be

    undetectable with SCRs use of routers in series to the external network providing a

    hardware firewall. The routers provide network protection by using network address

    translation (NAT) this works in conjunction with the Ethernet protocol TCP/IP. The

    transmissions originating from the SCR-TIMS systems TCP/IP address will be

    translated by the router into requests from its single IP address on the WAN or Internet

    side of the router. (See Figure below)

    Internet

    Web Server

    Router

    IP 28.2.324.4

    IP 12.0.0.4

    IP 12.0.0.3

    Classroom

    Work Station 2

    Classroom

    Work Station 1

    Figure illustrating simplified concept of network Router Firewall protection

    Software Application Security Management: These will be handled by the user group

    access levels.

    Application security will be handled by the system analyst related to

    configuration and functions. Understanding these services will help identify security

    concerns.

    Services are a necessary part of network communication. These can be breached

    if not monitored and controlled. This will be handled by user rights associated with their

    account access level.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    17

    Input validation will be handled at the user interface designed in to the database

    system. These data controls will be done to promote and ensure integrity of the data as it

    is input into the system. This is to accommodate fast changing processes, personnel

    turnover and new incoming students. This will also reduce security exposures. Therefore

    system managers have to take ownership of making the system 'Idiot-resistant', if not

    'Idiot-proof'.

    Patches and updates to each work station will be downloaded and require user

    intervention to install and activate.

    Database File Security Management:

    There will be Backup and recovery policies and procedures to protect data stored

    in TIMS protect this information from damage or loss. If by remote chance something

    happens and the integrity has been compromised we will have the ability to restore and

    recover lost or damaged data.

    File Security is defined by personal or sensitive data that is stored in files on the

    server or database. It is a vital part of every data storage system. SCR will handle this for

    the TIMS project by defining user groups and assigning permissions. This is a

    requirement of the system because the clients/staff will be using/sharing applications and

    files.

    The User groups will be defined and consist of system administrators, managers,

    and clients. Basically three levels of access. These levels will allow certain privileges and

    be controlled by the rank in group permissions.

    Permissions will stem between read, write, and execute broken down into access

    and ability to perform file/application manipulation. The categories are as follows.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    18

    Read a file read file contents only

    Write a file store files change file contents

    Execute a file run available programs

    Read a directory view contents of directories

    Write a directory add/remove contents of directories

    User Access Security Management: User security issues will be handled with

    procedural controls managed by the site system administrators with respect to user

    facility access levels based on their requirements.

    Site Identity management will be handled by displaying ID cards on each person

    from students and staff. A color coded stripe will be located on each ID designating the

    hierarchy for ease of identification.

    Password protection will be maintained at various levels. All systems from

    servers, classroom PC to notebooks will be required to maintain hard drive or bios level

    password protection and system user password protection all being monitored and

    reported daily by SCRs work station security tools. These passwords will require 8

    digits, 8 rotational password changes, and not repeatable character password changes.

    This process minimizes the ability for deviant to breach access to the system.

    Social engineering is a deviant attempt gain system access. These attempts would

    be through various means of social interaction friendship and misrepresentation of their

    affiliation. This will be handling by SCR as an introductory administrative educational

    package that all clients and staff will have to take prior to any level of system access. The

    staff will be on a yearly review process to eliminate exposures due to complacency.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    19

    The executive level at SCR may provide the highest level of user resistance adhering to

    security guidelines related to system passwords and various other security measures. In order to

    be connected all system users will be required to use the Workstation security application. As

    stated before this tool will monitor and report any violations to the system administrator.

    Part 4. Design specification:

    The system design specification will contain a full system design. It will also include a

    detailed plan for the actual implementation of the system. A document with the systems design

    specification will include detailed costs, staffing, and scheduling for the implementation will also

    be contained herein, with supporting charts and diagrams.

    This specification will be what the operational system is measured against. This

    document is designed for programmers who will be creating the actual system itself. Approval

    of the system will need to come from throughout the design process, and it will come from those

    within the I.T. department and other stakeholders for this project. They will approve the design

    and functionality of the areas of the system that directly affect them.

    At the end of the system design phase, multiple presentations will be made to explain the

    system and answer any questions. Comments made during these sessions will be considered, and

    final approval will be sought for the system, with the final presentation being with management.

    If approved, the implementation of the system will proceed. The following can be included in a

    complete Table of Contents for this system design specification: Cover Page, Executive

    Summary, System Components, System Environment, Implementation Requirements, Time and

    Cost Estimates, Appendices and Index.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    20

    Part 5. Design specification (Please double click the Table of Contents to launch document:

    System Design Specifications for SCR-TIMS

    Table of Contents

    1. Executive Summary ................................................................................................................................ 2

    2. System Components ............................................................................................................................... 3

    2.1 User Interface ................................................................................................................................ 3

    2.2 System Requirements .................................................................................................................. 11

    3. System Environment ............................................................................................................................ 14

    3.1 Architecture ................................................................................................................................. 14

    2.1 Hardware ..................................................................................................................................... 16

    2.2 System Software ......................................................................................................................... 21

    4. Implementation Requirements .............................................................................................................. 24

    3.1 Capacity ...................................................................................................................................... 24

    3.2 User Training Requirements ....................................................................................................... 25

    3.3 Test Plans .................................................................................................................................... 25

    3.3.1 Types of Testing ...................................................................................................................... 25

    3.3.2 Roles and Responsibilities ...................................................................................................... 28

    3.3.3 Assumptions for Test Execution ............................................................................................. 29

    3.3.4 Constraints for Test Execution ................................................................................................ 30

    5. Cost Estimates ...................................................................................................................................... 30

    6. INDEX .................................................................................................................................................. 33

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    21

    Part 6. Testing plan:

    Your new system will be thoroughly tested. For the majority of testing, there will be a

    small test bed consisting of 7 machines. Of these 7 machines, there will be one machine to

    represent the Executive, Systems, Project Management, Business Solutions, Network/Web,

    Business Solutions, and Administrative groups. There will also be one machine that will reflect

    those of the Training center. Each machine is connected to the server and have the settings,

    permissions and programs specific to that group and is tested for compatibility. Prior to testing, a

    test plan is created and all test cases are documented. Documentation for users, managers and IT

    are created before testing and edited during testing. There are 4 major testing methods that will

    be used.

    Unit Testing:

    Unit testing is a software development process in which the smallest testable parts of an

    application or network, called units, are individually and independently examined for correct

    function. The purpose of the Unit Test is to recognize and eliminate execution that could have

    been missed during desk checking.

    For this section of testing, we will use test data that will include correct data and

    erroneous data. Testing with the correct data is called positive testing and testing with the

    negative data is called negative testing. Both methods are equally as important to make sure that

    the program functions properly when it is used correctly and incorrectly.

    Here each part of the network will be tested separately. First we will test the server. The

    operating system and all of the individual software pieces will be checked to make sure that they

    are compatible. This will be done by verifying all of the functionality of the services, the

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    22

    operating system and any other program that is housed on the server. The disk array and router

    will then be checked for functionality.

    We will then set up each of the 7 computers for the test bed. Each of these computers

    will be tested to verify that the software on the machine works while the machine is used as a

    standalone machine. The server, the printer, the hardware of tier 2 and tier 3 are tested

    separately to make sure that all parts work. Its then demonstrated that all the legacy data can be

    imported into the new programs and that those programs work effectively.

    Integration Testing:

    Testing two or more programs that depend on each other is called integration testing.

    (Rosenblatt 2008). In Integration Testing components of the system are combined and tested in

    different ways. When you have programs and components of the network that depend on each

    other to perform a function then it is imperative to make sure that they work together correctly.

    Again in this phase of testing we will use both positive testing that simulates your actual

    conditions and negative testing that simulates incorrect conditions. There are 2 types of

    integration testing methods: bottom-up and top-down. Bottom-up begins with the simplest parts

    of the network and then moves up to the server. Top down testing is just the opposite. We are

    using a top down method since we are starting with the server.

    During the integration testing phase we will verify that all of the hardware functions

    together. This is the time that computers will be connected to network. We will verify that there

    isnt any issue sending updates between the server and the client machines. We will verify that

    the client machines can connect to the server. It is also verified during this time that the

    permissions for each of the user groups are functioning as they should. It is verified that all

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    23

    computers can print to the printers on the network and the other devices on the network such as

    scanners communicate with the computers on the network and vice versa.

    During the integration testing phase we will ensure that programs that work together

    without issue. We will verify that things like your anti-virus and firewall arent causing conflict

    with any of the programs on the client machine.

    System Testing:

    System testing is where the entire system will be tested for functionality. This is a final

    testing of all programs and the network. In this final testing we will make sure that they system

    can handle the predicted volumes of data quickly and efficiently. We will make sure at this time

    all of your IT staff is trained on the new system and prepared for your Go-Live. All

    documentation for the users, managers and IT staff is finalized to include changes found during

    testing, and dispersed this time. Since we have been working with a test bed up until this point,

    we will now get a small group of 7 beta users set up on the new network. The beta group will be

    1 person from each of the 7 groups. They will be given the machines used in the testing phase.

    They will use the system as they normally would in their daily roles. This way we can get actual

    daily activity on the system to test everything. It is in this phase that any scenarios that werent

    caught in the earlier phases testing will be caught and we can ensure that any possible problems

    are corrected prior to your go-live. The beta team will perform the acceptance test.

    Acceptance Testing:

    Acceptance Testing is the final phase of testing. Acceptance testing completes the formal

    testing process and is the only test that is the responsibility of the customer. (TechRepublic 2009)

    In this step a group representing a cross section of end users tests the application. In your case it

    would be the beta group that we established during system testing. The user acceptance testing

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    24

    is done using real world scenarios and perceptions relevant to the end users. Acceptance testing

    is where users test the system before accepting it. The user will execute the test cases that

    they have prepared and use the system in their day to day routine.

    Upon successful completion of the User Acceptance Testing and resolution of the issues

    the team generally indicates the acceptance of the system. If it isnt accepted, we will work with

    the users to get the system to their liking so that everything is happy and a sign-off can occur.

    After the system has been accepted, it will be rolled out to all of the other users. (Exforsys 2009)

    Part 7. Testing plan:

    This is the Master Test Plan for the SCR-TIMS project. This plan will address only those

    items and elements that are related to the SCR-TIMS network, both directly and indirectly

    affected elements will be addressed. This test plan will define testing strategies for each area

    and sub-area to include all the functional and quality requirements. The design specifications

    will be divided into testable areas. The plan will also define bug-tracking procedures. Risk will

    be identified in detail. This test plan will identify required resources and provide a testing

    schedule.

    The project will have 4 levels of testing: Unit, Integration, System and Acceptance. The

    details for each level are addressed in the approach section.

    TEST ITEMS

    The following is a list of the items to be tested:

    Server machine

    Disk Arrays

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    25

    Network Communication

    Client machines. This includes all software on the machine. This will be done by

    groups.

    Executive

    Systems

    Project Management

    Business Solutions Network/Web

    Business Solutions

    Administrative

    Printers

    Faxes

    Scanners

    Firewall

    RISK ISSUES

    Server updates and access.

    The operating system updates. We have no way of testing to see if future updates

    will cause issues with the system.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    26

    Backup and Recovery and local databases must be carefully checked to make sure

    there isnt any conflict.

    Legacy data could be corrupt or may not import properly.

    Network security must be defined and verified. Since there will be much

    communication between components on the network we must make sure that

    everything has access.

    APPROACH

    Unit Testing

    Technical design has been completed and approved

    Test data

    Extensive testing on clients machines

    Verify all Legacy data can be imported

    Test Hardware

    Servers

    Printers

    Routers

    Integration Testing

    Test Program or Programs

    Testing Schedule

    Test scripts

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    27

    Issues and defects documented

    Network Communication (client can communicate with server and also that server

    can communicate with the client)

    Verify Printers

    Send Faxes

    Updates from server

    System Testing

    Unit testing of each module.

    Schedule is made and in place for System Testing

    Tracking plan has been approved

    Testing environment established

    Acceptance Testing

    Test functionality and usability

    Design user acceptance case tests

    Execute test environment

    Document defects found

    Resolve issues

    User sign off

    Meetings

    The test team will meet once every two weeks to evaluate progress to date and to identify

    error trends and problems as early as possible. The test team leader will meet with the project

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    28

    manager once every two weeks as well. These two meetings will be scheduled on different

    weeks. Additional meetings can be called as required for emergency situations.

    Measures and Metrics

    The following information will be collected by the QA team during the Unit testing

    process. This information will be provided to network admin as well as provided to the project

    team on a biweekly basis:

    Defects by area and severity.

    Defect Origin

    Time spent on defect resolution by defect, for Critical & Major only. All Minor

    defects can be totaled together.

    TEST DELIVERABLES

    Acceptance test plan

    System/Integration test plan

    Unit test plans/turnover documentation

    Screen prototypes

    Report mock-ups

    Defect/Incident reports and summaries

    Test logs and turnover reports

    (Toolbox.com, 1998-2009)

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    29

    REMAINING TEST TASKS

    TASK Assigned To Status

    Create

    Acceptance Test

    Plan

    TM, PM, Client

    Create

    System/Integration

    Test Plan

    TM, PM, Dev.

    Define Unit

    Test rules and

    Procedures

    TM, PM, Dev.

    Define

    Turnover

    procedures for each

    level

    TM, Dev

    Verify

    prototypes of

    Screens

    Dev, Client, TM

    Verify

    prototypes of

    Reports

    Dev, Client, TM

    (Toolbox.com, 1998-2009)

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    30

    ENVIRONMENTAL NEEDS

    The following elements are required to support the overall testing effort at all levels

    within the TIMs project:

    TIMs System Group

    A SCR staff member will participate in the software or solution development activities.

    Responsibilities:

    Develop the system/application

    Develop cases and requirements in collaboration with TIMs Adopters

    Conduct Unit, System, and Integration testing

    Support user acceptance testing

    TIMs Adopter

    This will include an SCR project manager and a member of the TIMs System Group to

    forego formal adoption, testing, validation, and application of products or solutions developed by

    Workspace Developers. Responsibilities:

    Contribute to Use case, requirement development through review

    Contribute to develop and execution of the development test scripts through review

    Conduct Full User Acceptance, regression, and end-to-end testing; this will include

    identifying testing scenarios, building the test scripts, executing scripts and reporting

    test results

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    31

    TIMs Testing Process Management Team

    This group will include SCR Leads that are allocated to the TIMs system. The Group

    responsible to manage the entire testing process, workflow and quality management with

    activities and responsibilities to:

    Monitor and manage testing integrity

    Support testing activities

    Coordinate activities

    Assumptions for Test Execution

    For User Acceptance testing, the TIMs System Group has completed unit,

    system and integration testing and met all the Requirements (including

    quality requirements) based on Requirement Traceability Matrix.

    User Acceptance testing will be conducted by End-users

    Test results will be reported on daily. Failed scripts and defect list will be sent

    directly to developers.

    Constraints for Test Execution

    TIMs Adopters should clearly understand test procedures and record a defect

    or enhancement. Testing Process Team will schedule a meeting with TIM

    System Group and TIMs Adopters to address any testing related issues.

    TIMs System Group will receive a list of request for the test environment set

    up, user accounts set up, data set, and defects list.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    32

    TIMs System Group will support ongoing testing activities based on priorities

    Enhancement can be added as new requirement after the appropriate Change Management

    process. Documentation for all steps in the testing needs to be completed:

    To all IT stall,

    Please remember to complete documentation. It is important to document all the steps during

    testing.

    Team D

    Part 8. Capacity planning:

    Whenever you develop a new program or system, one of the most important things to

    consider is future growth. If youre application can only support 30 users at a time, what will

    happen when your user base is 120? While it cannot complete eliminate future capacity issues,

    capacity planning is a vital element in the systems development process.

    Capacity planning is simply estimating the amount of technology resources, whether

    hardware, software, or infrastructure, that will be needed over a certain period of time. This

    information is vital as it can help a company plan for future technology purchases in their

    budgets. The key to good capacity planning is to have new resources available for use as soon as

    they are needed, as opposed to sitting idle for long period s of time.

    There are certainly benefits and drawbacks to doing capacity planning. The benefits are

    that you plan ahead for future growth and rarely are caught off guard and have to make rush

    purchases for new equipment. It also allows you to plot out upgrades, again to avoid rushes that

    cause system outages during heavy volume hours. The downside is that if the growth is not

    there, purchased resources lay idle wasting money and space.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    33

    As it relates to the TIMS project, I think capacity planning is absolutely vital to the

    ongoing success of this system. I would certainly recommend using an open source planning

    tool, such as Hyperic HQ, to accomplish this task. I would also recommend that the systems

    analyst spearhead this effort, with input from those who played a significant role in the

    development of TIMS.

    Conclusion

    The final recommendation for the SCR Training Information Management

    System designs, architecture and scalability should embrace future growth. A detailed plan for

    the structure and implementation of the TIMS project has been presented covering network

    topology, Web-centricity, testing and security.

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    34

    References

    Bentley, J. E. (n.d.). Planning, Development and Support: Software Testing Fundamentals

    Concepts, Roles, and Terminology. Retrieved December 17, 2009, from S.A.S:

    http://www2.sas.com/proceedings/sugi30/141-30.pdf

    Borysowich, C. (2005, February 24). Testing: A Sample Test Plan . Retrieved December 17,

    2009, from Toolbox for IT: http://it.toolbox.com/blogs/enterprise-solutions/testing-a-

    sample-test-plan-3283

    BusinessDictionary.com. (2009). Legacy Data. Retrieved December 17, 2009, from Business

    Dictionary: http://www.businessdictionary.com/definition/legacy-data.html

    caBIG. (2008, September). Test Plan Template Baseline. Retrieved December 17, 2009, from

    cancer Biomedical Informatics Grid: cabig.nci.nih.gov/.../Test Plan

    Template_Baseline.doc

    Capacity Planning. (2009). Hyper HQ official website. Retrieved December 17, 2009 from

    http://www.hyperic.com/products/capacity-planning.html

    Capacity Planning. (2009). Tech Target. Retrieved December 17, 2009 from

    http://searchenterprisewan.techtarget.com/sDefinition/0,,sid200_gci1082579,00.html

    Cashman, T.J., Rosenblatt, H.K., Shelly, G.B. (2008). Systems Analysis and Design (Seventh

    Ed.). Boston, Massachusetts: Course Technology, Cengage Learning

    Computerworld Inc. (2006, August 24). How to Set Up WPA2 on Your Wireless Network .

    Retrieved December 17, 2009, from Computerworld:

    http://www.computerworld.com/s/article/9002706/Tutorial_How_to_set_up_WPA2_on_

    your_wireless_network_

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    35

    Course Technology, CENGAGE Learning (2008). Network+ Guide to Networks (4th ed.).

    Boston, Massachusetts: Course Technology, CENGAGE Learning.

    Exforsys.com. (2000 - 2009). What is User Acceptance Testing? Retrieved December 17, 2009,

    from Exforsys Execution for Systems: http://www.exforsys.com/tutorials/testing/what-is-

    user-acceptance-testing.html

    Gerrard Consulting. (2009). TEST PLAN OUTLINE. Retrieved December 17, 2009, from

    Gerrard Consulting :

    http://www.gerrardconsulting.com/tkb/guidelines/ieee829/example.html

    InfoTechNet. (n.p.). DATA MIGRATION. Retrieved December 17, 2009, from Infotechnet:

    http://www.infotechnet.org/ntca/DataMigration.htm

    Japenga, R. (2008). How to Write a Great Software Test Plan. Retrieved December 17, 2009,

    from Microtoolsinc: http://www.microtoolsinc.com/howstp.php

    Johnson, R. (2008). Performance Monitoring and Capacity Planning. IT World. Retrieved

    December 17, 2009 from http://www.itworld.com/swol-1195-unix?page=0%2C0

    Microsoft Corporation. (2009). Chapter 16 - MS Network Client Version 3.0 for MS-DOS.

    Retrieved 2009 17, December, from Microsoft:

    http://www.microsoft.com/resources/documentation/windowsnt/4/server/reskit/en-

    us/net/net4dos.mspx?mfr=true

    Migration Solutions Ltd. (n.p.). Data Centre & Computer Room Security. Retrieved December

    17, 2009, from Migration Solutions: Migration Solutions:

    http://www.migrationsolutions.com/computerroomsecurity

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    36

    Mochal, T. (2001, October 22). Acceptance testing: The customer is the ultimate judge.

    Retrieved December 17, 2009, from Techrepublic:

    http://articles.techrepublic.com.com/5100-10878_11-1044625.html

    National Center for Biotechnology Information. (2003, revised August 21). National Center for

    Biotechnology. Retrieved December 17, 2009, from Network Client/Server Applications:

    http://www.ncbi.nlm.nih.gov/Web/Search/client.html

    Series, S. C. (2008). A JAD Session Example. Retrieved from SCR Associates:

    http://oc.course.com/sc/sad7e/scr/intranet/jadsession.cfm

    TechTarget . (n.p.). Plotting and Presenting. Retrieved December 17, 2009, from Tech Target

    Events:

    http://media.techtarget.com/searchSoftwareQuality/downloads/Mging_the_Testing_Proce

    ssCh2.pdf

    TechTarget. (2006 - 2009). Bottom Up Approach to Network Troubleshooting. Retrieved

    December 17, 2009, from TechTarget Events:

    http://searchnetworking.techtarget.com/tip/1,289483,sid7_gci950291,00.html#

    TechTarget. (2006 - 2009). Integration Testing. Retrieved December 17, 2009, from TechTarget

    Events:

    http://searchsoftwarequality.techtarget.com/sDefinition/0,,sid92_gci1243430,00.html

    TechTarget. (2006 - 2009). Unit Testing. Retrieved December 17, 2009, from TechTarget

    Events:

    http://searchsoftwarequality.techtarget.com/sDefinition/0,,sid92_gci1243425,00.html

    Wikimedia Foundation, Inc. (2009, modified December 6). Client-server. Retrieved December

    17, 2009, from Wikipedia: http://en.wikipedia.org/wiki/Client-server

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    37

    INDEX

    Bugs Any error or defect that causes the software, application or hardware

    to malfunction.

    Enhancements Any alteration or modification to the existing system for better

    workflow and process.

    2) An error or defect that can cause the software, application or

    hardware to malfunction.

    Where 1) and 2) is NOT included in the requirements can be

    categorized as an enhancement. Pg 32

    .

  • IT460-01AU

    Unit 10: Systems Analysis and Design

    38

    Project Responsibilities:

    Tammy Nikolova (1), Tanya Day (2, 7), Kevin Harris (3),

    Richard Rickard (4, 8), Stephanie Faison (5+ main doc), Alma Williams (6),