20
Item No.10.0 STRENGTHENING OF POLLUTION CONTROL BOARDS AND COMMITTEES

Item No.10.0 STRENGTHENING OF POLLUTION CONTROL BOARDS AND COMMITTEES

Embed Size (px)

Citation preview

Item No.10.0

STRENGTHENING OF POLLUTION CONTROL BOARDS

AND COMMITTEES

Decisions of the 55th Meeting with PCBs/PCCs( 17.8.2009)

Consolidated requirements on;

(a) Laboratories

(b) Computerisation

(c) Staffing

(d) Infrastructure

(e) Common Waste Management facilities (CETPS, TSDF, CBMWTF)

SUMMARY/ ABSTRACT

TOTAL REQUIREMENT

Rs.1059.3955 crores

COMPONENTS

1 Laboratories : Rs.384.7327 crores

2 Computerisation : Rs.46.9957 crores

3 Infrastructure : Rs.627.6654 crores

Total : Rs.1059.3956 crores

STAFFING NEEDS(ADDITIONAL REQUIREMENTS)

1 Additional requirement

scientific/ Technical / Computer

: 9384

4610

2 Existing staff

Scientific/ Technical

: 6055

1315 + 28791564

COMMON WASTE MANAGEMENT FACILITIES

Facilities Requirements Existing

CETPs 129 147

TSDF 36 27

CBMWTF 86 177

ANALYSIS OF REQUIREMENTS (Rs. in crores){LABORATORY}

<1.0 1-5 5-10 >10Andaman Arunachal Assam Andhra Pradesh

Lakshadweep Bihar Delhi Chhatisgarh

Chandigarh Goa Gujarat

Daman Diu Karnataka Haryana

Himachal Kerala Jammu & Kashmir

Manipur Punjab Jharkhand

Meghalaya Uttrakhand Madhya Pradesh

Mizoram Maharashtra

Nagaland Orissa

Pudducherry Rajasthan

Sikkim Tamil Nadu

Tripura Uttar Pradesh

West Bengal

Groupings of Total Requirement (Rs. in crores)

<1.0 1-10 10-50 >50

Andaman Arunachal Andhra Haryana

Chandigarh Assam Jharkhand

Daman Diu Bihar Madhya Pradesh

Lakshadweep Chhattisgarh Rajasthan

Manipur Goa Tamil Nadu

Meghalaya Delhi Uttar Pradesh

Mizoram Gujarat

Nagaland Himachal

Pudduchery J&K

Sikkim Karnataka

Tripura Kerala

Maharashtra

Orissa

Punjab

Uttrakhand

West Bengal

BLUE PRINTS ON STRENGTHENING

1 Madhya Pradesh 2 Assam

3 Lakshadweep 4 Uttar Pradesh

5 Mizoram 6 Tripura

7 Nagaland 8 Himachal Pradesh

9 Goa 10 Manipur

11 Tamil Nadu

CONTENTS OF BLUE PRINT

1. Introduction

2. Need of the Document

3. Present status of Pollution Control

4. Mandates & Activities

5. Present set-up of Board

6. Goals for Pollution Control

7. Proposal for strengthening

8. Co-ordination with State agencies

9. SPCB and Public involvement

10. Conclusion

BASIS OF ESTIMATESLaboratories : Gradation/ Locational needs

: • Central A• Zonal / Regional B• Need based C

Compliance Monitoring

• Parameters prescribed: source/ Ambient

• Performance of ETP, CETP, APCD, TSDF.

Special Tasks : • Hazard Assessment• Accident management• Ambient monitoring• State-specific R&D

CAPABILITIES OF LABORATORIES

Parameters A – Grade B –Grade C -Grade

Physical 15 14 13

Inorganic General & Non metals 21 18 13

Organic 13 9 4

Trace metals 28 18 9

Microbiological 7 5 2

Bio-assay 5 3 2

Bio-monitoring 8 6 1

Hazardous Waste 6 0 0

Soil, Sludge, Sediment 37 31 15

Ambient Air 15 10 5

Source Emission 18 18 6

Noise + + +

Vehicular emission 4 3 3

COSTING OF LABsIn Crores

A B C

6.45 1.34 0.4590

Instruments Parameters

Water waste water

55148

Hazardous waste

07

Air/ Emission 30 40

BASIS OF ESTIMATESComputerisation 1. Linkages RO HO

CPCB2. Data Management & Reports

Infrastructure : • No rented Premises for Lab•Monitoring vehicles for timely transportation of samples; and enhancing monitoring frequency.• Un-interrupted lab functioning- Power back-up

STAFFING NEEDS

Project Fellows : Analytical support on job training (PG/PhD)

Regular Scientist/ Engineer

: Concentrate on specific jobs, R&D to keep scientific tempo.

Administration & Finance

: Optimal requirement

TOTAL REQUIREMENT

Rs.1059.3955 crores

CURTAILING REQUIREMENTS

OPTIONS

OUT-SOURCING

( may be not possible, Need money again)

DRAFT PROPOSAL(Funding Formula)

• Central Government

• State Government

• Own Resources of SPCB/PCC

• Bilateral programme

Time Frame

THANKS TO ALL

i. MEF and MoEF for support & looking for further Directions

ii. 28 SPCBs and 6 PCCs for support and co-operation.

iii. Chairman CPCB for hammering