Item ____IPP08 _______ - REPORTS -_______06/07/2016 ________ N O R T H S Y D N E Y C O U N C I L R E P O R T S NSIPP MEETING HELD ON 6/07/2016 Attachments: 1. Site Plan 2. Architectural plans 3. Landscape plan ADDRESS/WARD: 21 McDougall Street, Kirribilli (V) APPLICATION No: DA11/16 PROPOSAL: Alterations and additions to the existing semi detached dwelling including a rear ground floor addition PLANS REF: Drawing No. Revision Title Drawn by Dated 1 of 8 - Site Analysis Plan Architronics Building Design 20/06/16 2 of 8 - Site cover, landscape and un-built upon area calculations Architronics Building Design 11/06/16 3 of 8 - Roof joining analysis Architronics Building Design 2/05/16 4 of 8 - Windows schedule, BASIX Commitments Architronics Building Design 30/05/16 5 of 8 - Plan, SW elevation Architronics Building Design 20/06/16 6 of 8 - SE and NW elevations, section Architronics Building Design 20/06/16 OWNER: C.A Williams and G.D Wadley APPLICANT: Urbanesque Planning, AUTHOR: Luke Donovan, Senior Assessment Officer DATE OF REPORT: 24 June 2016 DATE LODGED: 21 January 2016 AMENDED: 22 February 2016, 12 May 2016 and 3 June 2016 RECOMMENDATION: Approval

Item - REPORTS...8 Ba y1 0 Bay 3 19 849663 Bay 4 Ba y5 1 8 7 5 6 4B y (L e a s e - 9 f o r V a l u a ti o n 4 p u r p s s o n l y) Ba y7 Ba 8 S P 5 3 8 Ba y 26 4963 ins traum) S P

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • Item ____IPP08_______ - REPORTS -_______06/07/2016________

    N O R T H S Y D N E Y C O U N C I L R E P O R T S

    NSIPP MEETING HELD ON 6/07/2016

    Attachments:

    1. Site Plan

    2. Architectural plans

    3. Landscape plan

    ADDRESS/WARD: 21 McDougall Street, Kirribilli (V)

    APPLICATION No: DA11/16

    PROPOSAL: Alterations and additions to the existing semi detached dwelling

    including a rear ground floor addition

    PLANS REF:

    Drawing No. Revision Title Drawn by Dated

    1 of 8 - Site Analysis Plan Architronics Building

    Design

    20/06/16

    2 of 8 - Site cover, landscape and un-built

    upon area calculations

    Architronics Building

    Design

    11/06/16

    3 of 8 - Roof joining analysis Architronics Building

    Design

    2/05/16

    4 of 8 - Windows schedule, BASIX

    Commitments

    Architronics Building

    Design

    30/05/16

    5 of 8 - Plan, SW elevation Architronics Building

    Design

    20/06/16

    6 of 8 - SE and NW elevations, section Architronics Building

    Design

    20/06/16

    OWNER: C.A Williams and G.D Wadley

    APPLICANT: Urbanesque Planning,

    AUTHOR: Luke Donovan, Senior Assessment Officer

    DATE OF REPORT: 24 June 2016

    DATE LODGED: 21 January 2016

    AMENDED: 22 February 2016, 12 May 2016 and 3 June 2016

    RECOMMENDATION: Approval

  • Report of Luke Donovan, Senior Assessment Officer Page 2

    Re: 21 McDougall Street, Kirribilli

    EXECUTIVE SUMMARY

    This development application seeks consent from NSIPP for alterations and additions to an

    existing terrace including a rear ground floor addition on land at No.21 McDougall Street,

    Kirribilli. This property is identified as a Contributory item within the Careening Cove

    Conservation Area.

    This development application is referred to the North Sydney Independent Planning Panel

    for determination at the request of Councillors Baker and Reymond.

    Council’s notification of the original proposal attracted five (5) submissions against the

    application whilst the amended proposal attracted three (3) submissions. The matters raised in the

    submissions include excessive excavation, adverse amenity impacts to adjoining properties

    including loss of privacy and solar access, stormwater impacts, non-compliant side setbacks and

    inconsistencies between drawings.

    The proposed addition is single storey in scale, located at the rear of the dwelling, and not visible

    from the public domain so there will be no adverse impact on the character of the Careening

    Cove Conservation Area. The addition is significantly setback from the rear boundary of the site

    to allow for improved soft landscaping to assist in maintaining the landscape character of the

    locality.

    The proposed addition complies with the building height control in NSDCP 2013 and the site

    coverage and landscaped area controls in NSDCP 2013.

    Appropriate conditions of consent are recommended to minimise any adverse impacts to

    structures and vegetation on adjoining properties.

    The proposal has been assessed having regard to Section 79(C) of the Environmental Planning

    and Assessment Act 1979 (as amended) and found to be satisfactory. Accordingly, the proposal is

    recommended for approval subject to appropriate standard and site specific conditions.

  • LOCATION MAP

    MILSO

    NS POINT STATIO

    NSTREET

    ALFRED

    ENNIS ROAD

    CLIFF

    STREET

    McDOUGALL

    ENNIS

    (Pathw

    ay) LANE

    EXPRESSW

    AY

    HIGH STREET RESERVE

    GREENWAY DRIVE

    (Private Road)

    HIGH

    BRO

    UGH

    TON

    STR

    EET

    WILLOUGHBY

    HUMPHREY P LACE

    PILE

    CLAR

    K

    WIN

    SLO

    W

    STREET

    CRESCENT

    STRE

    ETW

    INSL

    OW S

    TREE

    T

    ROAD

    CLO

    SURE

    HIPW

    OOD

    WINSLOW LANE

    STREET

    MIL

    SON

    PARK

    BRADLY AVENUE

    WINSLO W LANEROAD CLOSURE

    STRE

    ET

    HIGH

    KIARA

    CLOSE

    (Private R

    oad)

    ADDERSTONE

    MISS GLADYS CAREY RESERVE

    STREET

    WRIXTON PARK

    AVENUE

    STANNARDS

    PLACE

    5-9

    1

    64

    61

    (3)

    66

    30

    22

    ( 20)

    1

    10-1

    8

    8

    11

    8

    6

    11

    0-1

    16

    102

    30

    100

    (98)

    94-9

    6

    88

    44

    28

    22

    (20A

    )1

    8-2

    0(1

    2C

    )16

    14

    12A

    12

    12B

    (10A

    )

    10B

    10

    (4A

    )8

    64

    53-5

    557

    59

    51

    61

    63

    65- 6

    76

    97

    17

    375

    77

    102

    104

    106

    108

    7

    110

    9

    5

    3

    11

    1

    20

    27A

    18

    13

    16

    14

    22

    15

    12

    27

    10

    24

    8

    6

    25

    26

    40

    2

    2321

    37

    35

    33

    31

    27

    19

    25

    23

    27-2

    9

    21

    31

    33

    19

    30

    2

    35-3

    7

    17

    4

    17

    15

    6

    103

    8

    105

    44107

    101

    99

    10

    9

    97

    40

    95

    45

    40A

    28

    93

    91

    89

    87

    85

    83

    81

    26

    79

    7(66-72)

    (58-64)5

    (50-56)

    3(44-70)

    (42-48)

    (40)

    (34)

    (32)

    2

    4

    6

    50

    48

    55

    46

    49-51

    4442

    52

    4038

    36

    4

    3230

    14

    16

    28

    12

    26

    10

    8

    1

    54

    39

    10

    100

    98

    12

    96

    29

    94

    44

    92

    14

    41

    4

    90

    16

    43

    31

    43A

    18

    88

    1

    33

    45

    85

    149

    68

    35

    50

    147

    47

    37

    (18A

    )

    145

    70A

    3-5

    143

    39

    52

    70B

    49

    141

    139

    70C

    4

    137

    41

    51

    54

    72

    135

    43

    53

    6

    105

    56

    41

    30

    43

    45

    135A 32

    47

    34

    55

    5351

    4947

    4562

    60

    58

    56A

    (80)

    78

    76

    57

    74

    55

    2

    1

    141

    139

    137

    135

    133

    131

    14129

    8

    10

    12

    1423

    3 16

    5 18

    7

    34

    20

    (9) 22

    36

    21

    9 22A243

    2

    19

    (9A)

    38

    (9B)28

    (9C)

    26

    15 (9D)

    24

    1

    11

    2

    96

    22

    98A

    98

    9

    107

    20

    94100

    107A(106)

    115 110

    112119

    114121 114A

    1161238

    10

    92

    125127

    12

    SP 63731

    SP 82295

    SP 84573

    SP 86518

    SP

    64

    607

    793622

    100

    14

    54205

    SP 19172

    2

    SP

    366

    23

    SP

    397

    90

    SP

    32515

    SP

    85813

    SP 74614

    SP 53457

    SP 58137

    SP 58138

    160899

    6

    SP

    86325

    1

    1208604

    SP 50227

    SP 51026

    SP 52612

    12

    995

    8

    11

    1 SP

    79578

    10

    CSP 83595306357B1777592

    SP 82396SP 84104

    549159

    2

    5

    431

    983

    19368

    2

    SP

    70

    601

    4

    19368 SP

    524

    28 Ba

    y 10

    Bay

    3

    19849663

    Bay

    4

    Bay

    5

    1

    87564

    Bay

    6

    (Lease - for Valuation purposes only)

    Bay

    7

    Bay

    8

    SP

    53

    8

    Bay

    9

    26

    849663(in stratum)

    SP

    52

    429

    Pt 1

    743859

    (Lease - f

    or Valuat

    ion purpos

    es only)

    Bay 29

    (Lea

    se - fo

    r Valu

    at ion

    purp

    ose

    s o

    nly

    )

    (Lea

    se - fo

    r Valu

    at io

    n p

    urp

    ose

    s o

    nly

    )

    Bay 2

    8

    Bay 27

    Bay 26

    1103130

    (split for Valuat

    ion purposes only

    )

    Sec A

    1

    630528

    9650

    41337392 4453

    7984

    63 211

    1

    1 Sec A

    (i n st ra

    tum

    )

    1

    10

    31

    72

    1

    2

    SP

    66

    045

    184453

    7069

    1433618915 202

    1

    2

    4413

    39

    1

    939194

    8

    7

    6

    Pt 13

    9958

    5

    4

    3

    2

    1

    3313

    1

    2

    1218

    80

    8

    2361831

    189

    161

    26

    849663(in stratum)

    Pt 3

    9

    904848

    2

    560565

    SP

    5937

    SP 60522

    73

    746

    1

    Bay 4

    4(L

    ea

    se - fo

    r Valu

    atio

    n p

    urp

    ose

    s o

    nly

    )

    Bay 4

    3

    1

    743857

    SP

    5577

    Bay 4

    2B

    ay 4

    1B

    ay 4

    0B

    ay 3

    9(L

    ea

    se

    - for V

    alu

    atio

    n p

    urp

    oses o

    nly

    )

    SP

    20468

    Bay 3

    8B

    ay 3

    7B

    ay 3

    6B

    ay 3

    5

    SP

    14507

    828060

    Bay 3

    4(L

    ea

    se - fo

    r Valu

    ation

    purp

    ose

    s o

    nly

    )

    Bay 3

    3

    40

    Bay 32

    Bay 31

    218808

    Bay 30

    SP

    6319

    4

    6

    Gre

    enw

    ay F

    lats

    17717

    1

    SP

    11293

    8

    2

    14

    SP

    14360

    12

    SP

    301

    05

    11

    12

    11

    17717

    A

    11

    102

    CT 11

    101

    975358

    21

    95

    25

    87

    1

    (split fo r Valuation purposes only)

    B

    1

    1

    3968

    13

    3968

    13D

    621580E

    236361

    Sec AB

    10388

    33

    1

    ASec A

    65021

    31

    24561

    09

    4453

    96

    4453

    654

    2

    1

    1B900702

    1 A

    1 9

    60518932077 456105

    10 340197

    1

    12

    9306111 2

    901143

    128575Z 1650675

    444441

    106334

    X

    7882

    551

    3538

    20 2

    2

    589806

    21

    15

    SP 4

    2169

    9250233050

    6

    816214

    9250

    4

    53538

    Sec 6975358

    3

    2291

    2218

    22

    575174

    21

    SP 1

    121211

    224859

    23

    80363

    656461

    820308

    A2 1161

    536161 2308

    30731423

    1019

    378

    8401

    9710 3

    4404

    44 52

    159

    4966

    2

    1

    5949

    66

    135

    7068

    474

    0787

    SP 11220

    3133

    401

    SP 8461

    SP 55509

    740787

    1042

    49

    4

    5740787

    2

    6

    1

    32

    SP 4

    1992

    6081

    1311

    5

    1195

    0

    1136755

    1995361012779

    SP 10193

    448013

    4

    1

    1

    134170

    1

    1

    SP 9917

    SP 83648

    1218

    2

    10

    154

    0282

    230982

    SP

    43032

    Pt 1

    4

    B

    11

    A

    SP

    23130

    Sec

    7

    1183046

    1

    1923

    524258

    2

    121

    523096 A2

    1

    A

    C

    600

    33

    3

    2159

    42

    D

    1076

    69

    1003533

    1

    1440

    743

    107

    669

    7241

    831

    12

    A151E

    621582

    12 14

    2321

    45

    1516

    17

    1

    1078553

    7350

    80

    4

    2

    21

    6564

    6281

    5341

    3

    456106

    329

    2

    456106

    1 213

    1

    SP

    22183

    6564

    63

    535912

    14

    91

    289

    9

    4561

    07

    2

    218

    1

    1167890

    1

    SP 3

    011

    101

    1

    933183

    SP 2

    1803

    6215

    82

    1

    1

    201

    1

    914073

    SP 3

    1951

    102613

    1

    1341

    19

    SP 42744SP 68129

    1993

    99

    70

    1

    733

    1

    1083

    419

    5

    SP

    3148

    4

    9968

    87

    SP 47972

    16

    931061

    1106

    349

    1158

    203

    31

    3538

    798117

    7070

    96

    4

    SP

    9991

    948337

    2

    744842

    198296

    32

    1

    1

    SP 10911

    3538

    115096

    C

    1

    3

    1

    SP 3013SP 12251

    SP 45103SP 45443

    14085

    1932

    71

    15

    SP 6

    21

    2

    1408

    5

    2

    SP

    1062

    7

    344173

    604816

    SP 9293

    5

    3

    2

    1

    1

    3

    SP 9

    890

    773343

    559003

    SP

    207

    88

    1

    11

    795137

    591045

    SP 1

    1585

    12

    22

    1CONC

    RET

    E ST

    ORM

    WA

    TER

    CH

    ANN

    EL

    12

    SP 8711

    9090

    65

    82

    7332

    1133455

    11

    21

    SP 57

    236

    1158203

    872160

    1

    11

    9090

    65

    7890

    30

    1

    SP 82801

    326759

    (Lease

    - for V

    aluation

    purpos

    es only)

    2

    20

    14085

    1

    SP 1

    1477

    3267

    60

    CT 2

    8

    1

    SP

    149

    63

    3

    Pt 5

    104676

    1

    2

    1095443

    10

    1076

    6

    956

    043

    19

    101

    1

    1

    CLO

    SED

    RO

    AD

    572899

    1198053

    (Lease -

    for Valu

    ation

    purpose

    s only)

    1

    CT 1

    0

    2

    1047

    216

    1

    9483

    23

    18

    102

    1408

    5

    Pt 5

    1

    9483

    24

    871565

    7

    1

    2

    3

    1

    1091583

    2

    2

    3679

    10

    2

    A

    572899

    2

    1

    45610

    3

    SP 36253

    2

    743

    085

    939

    193

    3

    (Lea

    se -

    for V

    a luati o

    n

    purpos

    es on

    ly)

    865007

    15

    9358

    11

    1

    14085

    (Le

    ase

    - for

    Valu a

    tion

    purp

    oses

    only)

    935

    810

    1

    SP 5186

    1

    4416

    (Lea

    s e -

    for V

    alua

    t ion

    p urp

    ose

    s on

    ly)

    (Lea

    se - f

    or V

    aluati

    on p

    urpos

    es on

    ly)

    5

    18

    4416

    808

    334

    1

    (Le a

    se -

    for V

    alu a

    t ion

    purp

    ose

    s on

    ly)

    106731

    19

    10

    966

    429

    3065

    25

    Re: Page 3

    Property/Applicant Submittors - Properties Notified

    21 McDougall Street, Kirribilli - DA 11/16

  • Report of Luke Donovan, Senior Assessment Officer Page 4

    Re: 21 McDougall Street, Kirribilli

    DESCRIPTION OF PROPOSAL

    The applicant is seeking approval from NSIPP for alterations and additions to the existing semi

    detached dwelling including a rear ground floor addition on land at No.21 McDougall Street,

    Kirribilli. The proposed works can be summarised as follows:

    Minor alterations to the rear of existing dining room and WC, including the demolition of

    an internal wall. The existing skillion roof over the rear of the dwelling is proposed to be

    replaced with a gable roof that has a 10 degree roof pitch

    A new single storey addition at the rear of the existing dwelling with a new bathroom.

    A new covered patio on the southern side of the addition

    New retaining walls and landscaping at the rear of the site

    The demolition of the existing timber shed adjacent to the rear (south western) boundary.

    The demolition of the existing toilet structure adjacent to the rear (south eastern)

    boundary.

    The existing party walls are proposed to be retained with a new shed to be built on the

    enlarged plinth.

    STATUTORY CONTROLS

    North Sydney LEP 2013

    Zoning – R2 (Low Density Residential) Zone

    Item of Heritage – No

    In Vicinity of Item of Heritage – No

    Conservation Area – Yes (Contributory Item within the Careening Cove Conservation

    Area)

    FSBL – No

    Environmental Planning & Assessment Act 1979

    SREP (Sydney Harbour Catchment) 2005

    SEPP No. 55 – Remediation of Land

    SEPP (Building Sustainability Index – BASIX) 2004

    Local Development

    POLICY CONTROLS

    NSDCP 2013

    DESCRIPTION OF LOCALITY

    The subject site is identified as Lot A in Deposited Plan 107669 and is known as 21 McDougall

    Street Kirribilli. The subject site is irregular in shape and is located on the south eastern side of

    McDougall Street.

  • Report of Luke Donovan, Senior Assessment Officer Page 5

    Re: 21 McDougall Street, Kirribilli

    Figure 1 – Aerial photograph of subject site and surrounding development

    The existing two storey terrace has been constructed of brick and tile. A brick WC has a shared

    party wall with No.23 McDougall Street is located in the rear part of the site. The site has the

    benefit of a right of footway running along the northern side of the boundary which provides

    access to the rear of the dwelling and also to the rear of No. 19 McDougall Street. The site has a

    total area of 224.6m². The site has a frontage to McDougall Street of 7.33m including the width

    of the right of footway.

    Figure 2 – Rear elevation of subject dwelling

  • Report of Luke Donovan, Senior Assessment Officer Page 6

    Re: 21 McDougall Street, Kirribilli

    Figure 3 – Rear garden of the subject site

    Surrounding development is predominantly two storey terrace housing which also form part of

    the Careening Cove Conservation Area. The subject site is diagonally opposite the heritage listed

    Milson Park.

    RELEVANT HISTORY

    Previous applications

    Development Application No. DA175/13 proposing alterations to the existing dwelling

    including new rear sliding door and skylights was approved by Council on 5 August 2013.

    Development Application No. DA168/15 proposing a rear extension and a studio addition was

    rejected by Council on 28 May 2015. The application was re-lodged with Council on 26 June

    2015 as Development Application No.222/15. This application was withdrawn by the applicant

    on 19 August 2015.

    Development Application DA371/15 proposing a rear ground floor pavilion addition and

    breezeway was rejected by Council on 15 October 2015.

    Current application

    A brief history of the subject application is summarised in the table below:

    21 January 2016 The subject development application was lodged with Council.

    3 February 2016 A letter was sent to the applicant requesting the following information:

    Site coverage, landscaped and un-built upon area compliance

    plan.

    Revised shadow diagrams

    More detailed architectural plans

    Adjoining owners consent

  • Report of Luke Donovan, Senior Assessment Officer Page 7

    Re: 21 McDougall Street, Kirribilli

    5 February to 19

    February 2016

    The subject application was notified to adjoining property owners and

    the Milson Precinct. Five (5) submissions were received against the

    application.

    4 March 2016 Council’s Assessment Officer had an on-site meeting with the owner and

    the applicant. Concerns were raised at the meeting regarding the

    excessive length of the rear pavilion addition (site coverage) and the

    inconsistencies between the drawings.

    12 May 2016 The applicant submitted amended plans in response to the issues raised at

    the site meeting. The main amendments to the plans include a reduction

    in the length of the rear pavilion addition and an increase in soft

    landscaping at the rear of the site.

    20 May to 3 June

    2016

    The amended application was notified to adjoining property owners and

    the Milson Precinct. Three (3) submissions were received against the

    application.

    3 June, 14 June

    and 23 June 2016

    The applicant submitted further amended plans correcting some minor

    inconsistencies in the drawings.

    REFERRALS

    Building

    The application has not been assessed in respect of the Building Code of Australia however a

    condition requiring compliance with the BCA was originally recommended for imposition and

    remains on the consent. Furthermore, should significant changes be necessary to facilitate the

    release of a Construction Certificate for the works included in this application, an additional

    Section 96 application may be necessary.

    Heritage

    The application was referred to Council’s Conservation Planner whose comments are

    summarised below:

    “The subject property is identified as a Contributory item and is located within the

    Careening Cove Conservation Area. The dwelling is one of three pairs of almost identical

    Victorian Regency style semi-detached dwellings located at No’s 17 to 27 McDougall

    Street. The dwelling has an intact primary form and front façade. There is a

    contemporary narrow skillion-roofed addition at the rear.

    The proposal is considered to satisfy Clause 5.10 of NSLEP 2013 in that the significance

    of the primary form and front façade are to be retained. The proposed works will not be

    visible from the public domain, so the character of the conservation area will be retained.

    The application has been considered below against the relevant heritage controls in Part

    B, Section 13 of NSDCP 2013 –

    13.4 Development in Vicinity of Heritage Items – There will be no impact to the heritage

    listed Milson Park located opposite the site.

  • Report of Luke Donovan, Senior Assessment Officer Page 8

    Re: 21 McDougall Street, Kirribilli

    13.6.1 General Objectives – The proposal is compliant in that the proposed works are

    located at the rear and will not be visible from the public domain.

    13.6.2 Form, Massing, Scale – The proposed new pavilion style addition will have a

    contemporary character which is considered to be compliant in that it will not have a

    negative impact upon the characteristic built form of the area. The primary form of the

    original dwelling will remain intact and clearly legible.

    No objection is raised to the nil setback to the boundary of No.23 McDougall Street, as a

    nil setback is not uncommon in the conservation area. The proposed rear setback is

    considered to be acceptable as there is not a clearly established rear setback along the

    southern side of McDougall Street due to the unusual shape of these lots. A number of the

    properties along the southern side of McDougall Street have out buildings in the rear

    garden.

    The proportions of the proposed horizontal windows to the new pavilion addition are not

    characteristic to the conservation area; however, no objection is raised as it will not be

    visible from the public domain.

    13.6.3 Roofs – No objection is raised to the proposed new roof for the pavilion addition.

    Although uncharacteristically pitched at 10 degrees, the lower ridge height (RL11.34)

    reduces the bulk and height of the addition, allowing the primary form to be visually

    dominant and limiting the visibility of the addition from neighbouring properties.

    13.9.1 Skylights – No objection is raised to the re-use of the skylights on the new rear

    addition.

    13.9.4 Materials and Colours – No objection is raised to the use of corrugated roof

    sheeting and weatherboard cladding. A condition is recommended that the new windows

    and doors to the pavilion addition are to have aluminium or steel framing sections of a

    width 45mm or wider, or are to be timber-framed to ensure consistency with the

    materials used in the conservation area (refer to Condition C3).

    Engineering

    The application was referred to Council’s Development Engineer who raised no objection to the

    proposal on engineering grounds subject to standard conditions of consent (refer to Condition

    C14)

    SUBMISSIONS

    Original application

    The original application was notified to the Milson Precinct and adjoining properties between 5

    February and 19 February 2016. Five (5) submissions were received against the application. The

    issues raised in this submission are summarised below and addressed later in this report:

  • Report of Luke Donovan, Senior Assessment Officer Page 9

    Re: 21 McDougall Street, Kirribilli

    Basis of Submissions

    Extent of excavation

    Noise impact

    Loss of solar access

    Loss of outlook

    Uncharacteristic built form

    Stormwater impacts

    Adverse impacts to the common party wall

    Non-compliance with the site coverage control

    Lack of detail on the plans.

    Unsympathetic rear addition.

    Non compliance with the site coverage control.

    Noise impact

    Non-compliant side setback.

    Inconsistent rear setback

    Adverse stormwater impact

    Unsympathetic rear addition.

    Inaccuracies between the plans

    Amended application

    The amended application was notified to the Milson Precinct and adjoining properties between

    20 May and 3 June 2016. Three (3) submissions were received in response to Council’s amended

    notification. The submissions raised no new issues.

    CONSIDERATION

    The relevant matters for consideration under Section 79C of the Environmental Planning and

    Assessment Act 1979, are assessed under the following headings:

    SREP (Sydney Harbour Catchment) 2005

    Having regard to the SREP (Sydney Harbour Catchment) 2005 (gazetted on 28 September

    2005), the proposed development is not considered to be detrimental to the Harbour and will

    not unduly impose upon the character of the foreshore given there are no primary views to the

    site from the harbour. As such, the development satisfies the provisions contained within the

    above mentioned SREP.

    SEPP 55 (Remediation of Land)

    The provisions of SEPP 55 require Council to consider the likelihood of land contamination

    and any remediation necessary to rehabilitate the site. Council’s records indicate that the site

    has previously been used for residential development and as such is unlikely to contain any

    contamination. The requirements of SEPP 55 have therefore been satisfactorily addressed.

    SEPP (Building Sustainability Index – BASIX) 2004

    A suitable BASIX Certificate has been submitted with the application. A condition of consent

    is recommended requiring compliance with the commitments contained in the certificate

    (refer to Condition C18 and G6).

  • Report of Luke Donovan, Senior Assessment Officer Page 10

    Re: 21 McDougall Street, Kirribilli

    NORTH SYDNEY LEP 2013

    Permissibility within the zone:

    The site is zoned R2 (Low Density Residential) under the provisions of the North Sydney Local

    Environmental Plan 2013. The application proposes alterations and additions to an existing semi-

    detached dwelling which is a permissible form of development in the R2 Low Density

    Residential zone with development consent from Council.

    R2 (Low Density Residential) Zone Objectives

    The proposed development is considered to generally satisfy the objectives of the zone as the

    proposal will maintain the low density residential character of the neighbourhood while providing

    improved residential amenity for the occupants of the dwelling without adversely impacting the

    residential amenity of neighbouring properties in terms of solar access or privacy.

    Building Heights

    Under the provisions of Clause 4.3(2B), the maximum height of a building permitted on the

    subject site is 5.5m being a small lot (

  • Report of Luke Donovan, Senior Assessment Officer Page 11

    Re: 21 McDougall Street, Kirribilli

    Through the recommended conditions of consent the proposal is considered satisfactory

    having regard to Clause 6.10 in NSLEP 2013.

    DCP 2013 Compliance Table

    DEVELOPMENT CONTROL PLAN 2013 – Part B Section 1- Residential Development

    complies Comments

    1.2 Social Amenity

    Population Mix

    Yes

    Residential accommodation within the locality would be maintained.

    The proposal would have no impact in terms of maintaining affordable

    housing or population mix within Kirribilli Maintaining Residential

    Accommodation

    Affordable Housing

    1.3 Environmental Criteria

    Topography Yes (via

    conditions)

    The proposal will generally maintain the natural topography of the

    site. The application proposes excavation to a maximum depth of

    approximately 900mm to accommodate the rear pavilion. Whilst

    excavation is proposed adjacent to both the south eastern and north

    western boundaries, appropriate conditions of consent are

    recommended to minimise any adverse impacts to structures and

    vegetation on adjoining properties (refer to Conditions C5 and

    C9).

    Views Yes The proposed single storey rear pavilion will not impact on any

    significant views for adjoining properties given that it will be single

    storey. The proposal will generally maintain the existing outlook at

    the rear for the adjoining properties as the new works are

    predominantly below the existing boundary fence line.

    Solar Access Yes The proposal will result in some minor overshadowing to the rear

    garden of No.23 McDougall Street between 2pm and 3pm during the

    winter solstice. The level of impact is considered reasonable as the

    height of the addition (3.4m) is significantly below the maximum

    control (5.5m). The rear garden will receive solar access between

    10am and 2pm during the winter solstice and is therefore compliant

    with the minimum solar access requirements in P1 in Part B, Section

    1.3.7 in NSDCP 2013.

    Acoustic Privacy Yes The proposed single storey rear addition is unlikely to result in

    adverse acoustic impacts to neighbouring properties given the

    residential nature of the development. The proposal incorporates a

    covered vergola over the rear patio and the additional boundary

    screen planting will further assist in minimizing any noise nuisance

    for adjoining properties.

    Visual Privacy Yes The proposed windows and openings within the addition are unlikely

    to adversely affect visual privacy with adjoining properties for the

    following reasons:

    The proposed sliding doors and windows on the northwest

    (side) elevation would be located below the boundary fence

    line.

    No new openings are proposed along the southeast (side)

    elevation.

    The proposed sliding doors and side window on the

    southwest (rear) elevation would have an outlook into the

    rear yard of the subject site, not the adjoining properties.

    Furthermore, the addition is setback a minimum of 11.065m

    from the rear boundary.

    Significant screen planting is proposed along the southern

    and western boundaries to further assist in maintaining

    privacy with adjoining properties.

  • Report of Luke Donovan, Senior Assessment Officer Page 12

    Re: 21 McDougall Street, Kirribilli

    The proposal is considered acceptable having regard to Part B,

    Section 1.3.10 in NSDCP 2013.

    1.4 Quality built form

    Context YES The proposal generally responds to the existing characteristics and

    constraints of the site. The proposed rear addition is considered to be

    generally characteristic of other properties along McDougall Street

    with similar rear additions (No’s 31 and 33 McDougall Street).

    Figure 4 – Aerial photograph of subject site and surrounding

    developments

    Streetscape Yes The proposed single storey addition located at the rear of the

    existing two storey semi detached dwelling would not be visible

    from the public domain and therefore not impact the streetscape.

    Council’s Development Engineer has recommended appropriate

    conditions of consent to ensure the protection of Council’s

    infrastructure.

    Siting Yes The proposal will maintain the existent building orientation and

    siting. The location of the single storey rear addition is considered to

    be appropriate given the irregular shape and narrowness of the site

    Setback – Side Yes

    No

    North western side boundary

    The proposed addition has a 1.2m setback (minimum) to the north

    western boundary and compliant with the minimum side setback

    (900mm) specified in P2 in Part B, Section 1.4.6 in NSDCP 2013.

    Boundary Proposed Control Complies

    North western 1200mm 900mm Yes

    South eastern side boundary

    The proposed addition has a nil setback to the south eastern boundary

    of the site. Pursuant to P3 in Part B, Section 1.4.6 in NSDCP 2013,

    Council must not grant consent to a development with a nil setback to a

    side boundary unless the applicant has satisfactorily addressed the

    questions identified in the Land and Environment Court Planning

    Principle “Building to the side boundary in residential areas”

    established in Galea v Marrickville Council [2003] NSWLEC 113. The

    application has been considered having regard to the matters in the

    above planning principle.

    No. 31 McDougall

    Street

    No. 33 McDougall

    Street (rear

    addition

    approved under

    DA11/15)

    Subject site

  • Report of Luke Donovan, Senior Assessment Officer Page 13

    Re: 21 McDougall Street, Kirribilli

    These are summarised below:-

    (a) Is the street characterised by terrace housing?

    The southern side of McDougall Street is characterised by semi-

    detached dwellings.

    (b) What is the height and length of the wall on the boundary?

    The proposed single storey rear addition has a length of 8.735m and a

    height of 2.75m.

    (c) Has the applicant control over the adjoining site(s) or the agreement of their owners?

    A condition is recommended that the works are constructed wholly with

    the subject site. The application does not propose any works to the

    party wall along the south eastern boundary of the site.

    (d) What are the impacts on the amenity and/or development potential of adjoining sites?

    The proposed single storey rear addition would not cause any adverse

    amenity impacts to adjoining properties with regards to privacy, solar

    access and view loss for reasons discussed throughout this report.

    (e) Are there arrangement in place for the maintenance of the wall or gutters?

    The box gutter along the south eastern boundary can be maintained

    from the roof of the addition. Given the south eastern wall is proposed

    to be constructed of concrete blocks it is unlikely to much on-going

    maintenance will be required to this wall.

    The proposed nil setback is considered appropriate and consistent with

    other developments in Kirribilli.

    Setback - Rear Yes The rear building line of the addition is setback between 11.065m and

    12.7m from the rear boundary of the site by virtue of its irregular and

    splayed nature. The proposed rear patio is setback between 7.3m and

    9.2m from the rear boundary. The proposed rear addition is considered

    acceptable for the following reasons:

    The proposed rear addition is compliant with the 8m rear

    setback specified the relevant Character Statement (Careening

    Cove Conservation Area)

    The proposal provides for a significantly improved soft

    landscaped rear garden

    The demolition of the rear shed allows for the planting of a

    Frangipani Tree adjacent to the rear boundary of the site.

    The rear setback is not uncharacteristic of surrounding

    developments at No’s 31 and 33 McDougall Street.

    The proposed site coverage (52%) is significantly below the

    maximum site coverage control (60%) in NSDCP 2013.

    Form Massing Scale

    Built Form Character

    Yes The proposed addition is located at the rear and submissive in scale to

    the front part of the dwelling. The proposal will therefore not affect the

    character of the Careening Cove Conservation Area. The height of the

    proposed addition (3.4m) is significantly below the maximum building

    height control (5.5m) in NSLEP 2013. The floor to ceiling height of the

    addition is 2.75m and compliant with the minimum height specified in

    the Building Code of Australia

  • Report of Luke Donovan, Senior Assessment Officer Page 14

    Re: 21 McDougall Street, Kirribilli

    Dwelling Entry YES The proposal does not seek a change to the existing dwelling entry.

    Roofs YES The proposed rear addition has a hipped roof form with a shallow pitch

    of 100. The pitch of the roof form will assist in minimizing its visual

    impact upon surrounding properties.

    Materials Yes (via

    condition)

    The materials for the proposed addition include weatherboard cladding,

    concrete blocks and corrugated iron roofing. These materials are

    considered acceptable and consistent with the character of the

    conservation area.

    Council’s Conservation Planner has recommended a condition of

    consent that requires the new windows and doors within the addition to

    be either aluminium or steel framing sections of a width 45mm or

    wider, or preferably timber-framed to ensure consistency with the

    materials used in the conservation area (refer to Condition C3)

    Front Fences Yes The application does not propose any works to the existing front fence.

    1.5 Quality Urban Environment

    Safety and Security Yes The proposal is considered to maintain a high level of safety and

    security for the occupants and visitors of the dwelling. The existing

    gate at the top of right of way (north western side of dwelling) ensures

    secure access is maintained to the rear of the site.

    Vehicle Access and Parking Yes There is no carparking currently provided on the site. It is unreasonable

    in the site circumstances to require the provision of carparking given

    the constraints of the site and the fact that it is a Contributory Item

    within the Careening Cove Conservation Area.

    Site Coverage Yes The proposed site coverage is 52% which is compliant with the

    maximum site coverage requirement (60%) in P1, Section 1.5.5 in

    NSDCP 2013.

    Proposed Control Complies

    52% 60% Yes

    Landscaped and Un-built

    Upon Areas

    Yes

    Yes

    The proposed landscaped area is 28% which complies with the

    minimum landscaped area (20%) in P1, Section 1.5.6 in NSDCP 2013.

    Proposed Control Complies

    28% 20% Yes

    The proposed un-built upon area is 20% which also complies with the

    maximum un-built upon area (20%) in P1, Section 1.5.6 in NSDCP

    2013.

    Proposed Control Complies

    20% 20% Yes

    Excavation Yes (via

    conditions)

    The application proposes excavation to a maximum depth of

    approximately 900mm to accommodate the rear pavilion addition.

    Whilst excavation is proposed adjacent to both the south eastern and

    north western boundaries, appropriate conditions of consent are

    recommended to minimise any adverse impacts to structures and

    vegetation on adjoining properties.

    Landscaping Yes The proposal provides improved soft landscaping at the rear of the site,

    including the planting of a Frangipani tree to assist in maintaining the

    landscape character of the locality.

    Front Gardens Yes The application does not propose any works to the existing front garden

    on the subject site

    Private and Communal

    Open Space

    Yes The proposal provides more useable private open space at the rear of

    the site.

    1.6 Efficient Use of Resources

    Energy Efficiency Yes (via

    conditions)

    A valid BASIX Certificate was submitted with the application

    demonstrating compliance with the relevant commitments (refer to

    Condition C18 and G6).

  • Report of Luke Donovan, Senior Assessment Officer Page 15

    Re: 21 McDougall Street, Kirribilli

    Stormwater Management Yes Council’s Development Engineer has recommended a further condition

    of consent requiring an amended stormwater plan detailing the

    requirement for sub soil drainage to be conveyed to Council’s kerb in

    McDougall Street.

    Kirribilli Planning Area (Careening Cove Conservation Area)

    The application has been assessed against the relevant controls in Part B in NSDCP 2013 and

    found to be generally satisfactory as discussed in the table above. Consideration has also been

    given to Part C of NSDCP 2013 and in particular Section 8 of the Character Statement for the

    Kirribilli Planning Area and Section 8.3 for the Careening Cove Conservation Area where the

    proposal is considered to be consistent with the characteristic built elements for the following

    reasons:

    The building setbacks to the side (nil-1m) and rear boundaries (8m) comply with the

    characteristic setbacks

    The addition is located at the rear that is single storey and modest in bulk and scale.

    Low pitched (10 degree) corrugated roof to the rear addition

    A condition is recommended requiring the door and window frames to the rear addition

    be either timber or steel framed with sections of a width of 45mm or wider, consistent

    with the Careening Cove Conservation Area.

    The proposal provides a landscaped garden at the rear of the site.

    SITE SUITABILITY

    The proposal is considered to be suitable for the subject site as discussed throughout this report.

    ALL LIKELY IMPACTS OF THE DEVELOPMENT

    All likely impacts of the proposed development have been considered within the context of this

    report.

    ENVIRONMENTAL APPRAISAL CONSIDERED

    1. Statutory Controls YES

    2. Policy Controls YES

    3. Design in relation to existing building and YES

    natural environment

    4. Landscaping/Open Space Provision YES

    5. Traffic generation and Carparking provision YES

    6. Loading and Servicing facilities N/A

    7. Physical relationship to and impact upon adjoining YES

    development (Views, privacy, overshadowing, etc.)

  • Report of Luke Donovan, Senior Assessment Officer Page 16

    Re: 21 McDougall Street, Kirribilli

    8. Site Management Issues YES

    9. All relevant S79C considerations of YES

    Environmental Planning and Assessment (Amendment) Act 1979

    SUBMITTORS CONCERNS

    The original application was notified to the Milson Precinct and adjoining properties between 5

    February and 19 February 2016. Five (5) submissions were received against the original

    application. The amended application was notified to the Milson Precinct and adjoining

    properties between 20 May and 3 June 2016. Three (3) submissions were received against the

    amended application.

    The issues raised in the submissions are summarised and addressed with planning comments

    below:

    Extent of excavation

    The application proposes excavation to a maximum depth of approximately 900mm to

    accommodate the rear pavilion addition. Whilst excavation is proposed adjacent to both the

    eastern and western boundaries, appropriate conditions of consent are recommended to minimise

    any adverse impacts to structures and vegetation on adjoining properties (refer to Conditions

    C5, C6, and C9).

    Council’s Landscape Development Officer is of the opinion that the proposed excavation for the

    addition, which is adjacent to southern eastern boundary of the site, is unlikely to adversely

    impact the existing Orange Jassamine that is planted along the north western boundary of No.23

    McDougall Street.

    Noise impact

    The proposed single storey rear addition is unlikely to result in adverse acoustic impacts to

    neighbouring properties given the residential nature of the development. The proposal

    incorporates a covered vergola over the rear patio and additional boundary screen planting that is

    likely to assist in minimizing any adverse noise impacts to adjoining properties.

    Loss of solar access

    The proposal will result in some minor overshadowing to the rear garden of No. 23 McDougall

    Street between 2pm and 3pm during the winter solstice. The level of impact is considered

    reasonable as the height of the addition (3.4m) is significantly below the maximum control

    (5.5m). The rear garden will receive solar access between 10am and 2pm during the winter

    solstice and is therefore compliant with the minimum solar access requirements in P1 in Part B,

    Section 1.3.7 in NSDCP 2013.

    Loss of outlook

    The proposal will generally maintain the existing outlook at the rear for the adjoining properties

    as the new works are predominantly below the existing boundary fence line. The low pitched

    roof (10 degrees) will further assist in minimising any adverse visual impacts for adjoining

    properties.

  • Report of Luke Donovan, Senior Assessment Officer Page 17

    Re: 21 McDougall Street, Kirribilli

    Uncharacteristic built form

    Unsympathetic rear addition

    The proposed single storey rear addition is considered to be characteristic of the Careening Cove

    Conservation Area as discussed in detail by Council’s Conservation Planner earlier within this

    report.

    Stormwater impacts

    Council’s Development Engineer has recommended a further condition of consent requiring an

    amended stormwater plan detailing the requirement for sub soil drainage to be conveyed to

    Council’s kerb in McDougall Street (refer to Condition C14).

    Adverse impacts to the common party wall

    A condition of consent is recommended that no approval is given under this application to any

    works to the common party or retaining walls along the boundaries of the site. A further

    condition is recommended requiring all new retaining walls and structures to be constructed

    wholly within the subject site (refer to Conditions C1 and G1).

    Non compliance with the site coverage control

    The proposed site coverage is 52% which is compliant with the maximum site coverage

    requirement (60%) in P1, Section 1.5.5 in NSDCP 2013.

    Inaccuracies between the plans

    Lack of detail on the plans

    The applicant has corrected the inaccuracies between the plans and provided sufficient detail to

    enable a detailed assessment of the application.

    Non compliant side setback

    The proposed addition has a 1.2m setback (minimum) to the north western boundary of the site

    and is compliant with the minimum side setback (900mm) specified in P2 in Part B, Section 1.4.6

    in NSDCP 2013. The proposed addition has a nil setback to the south eastern boundary of the site

    which is considered acceptable as there are unlikely to be any adverse impacts to No.23

    McDougall Street and the setback is characteristic of surrounding developments in the Careening

    Cove Conservation Area.

    Inconsistent rear setback

    The rear building line of the addition is setback between 11.065m and 12.7m from the rear

    boundary of the site by virtue of its irregular and splayed nature. The proposed rear patio is

    setback between 7.3m and 9.2m from the rear boundary. The proposed rear addition is considered

    acceptable for the following reasons:

    The proposed rear addition is compliant with the 8m rear setback specified the relevant

    Character Statement (Careening Cove Conservation Area).

    The proposal provides for a significantly improved soft landscaped rear garden.

  • Report of Luke Donovan, Senior Assessment Officer Page 18

    Re: 21 McDougall Street, Kirribilli

    The demolition of the rear shed allows for the planting of a Frangipani Tree adjacent to

    the rear boundary of the site to maintain a landscape setting for the contributory item.

    The rear setback is characteristic of surrounding developments at No’s 31 and 33

    McDougall Street.

    The proposed rear setback is therefore considered to be acceptable in the site circumstances and

    consistent with the objectives in Part B, Section 1.4.6 in NSDCP 2013.

    PUBLIC INTEREST

    The recommended approval of the application is unlikely to offend the public interest for the

    reasons provided throughout this report.

    CONCLUSION

    The development application has been assessed against the North Sydney Local Environmental

    Plan 2013, the North Sydney Development Control Plan 2013 and the relevant State Planning

    Policies and found to be generally satisfactory in the site circumstances.

    The proposed addition is single storey in scale, located at the rear of the dwelling, and not visible

    from the public domain so there will be no adverse impact upon the character of the Careening

    Cove Conservation Area. The addition is significantly setback from the rear boundary of the site

    to allow for improved soft landscaping to assist in maintaining the landscape character of the

    locality.

    The proposed addition complies with the building height control in NSDCP 2013 and the site

    coverage and landscaped area controls in NSDCP 2013.

    Appropriate conditions of consent are recommended to minimise any adverse impacts to

    structures and vegetation on adjoining properties arising from the proposed excavation.

    Having regard to the provisions of Section 79C of the Environmental Planning & Assessment

    Act 1979, the application is considered to be satisfactory and recommended for approval subject

    to the attached standard and site specific conditions.

    RECOMMENDATION

    PURSUANT TO SECTION 80 OF ENVIRONMENTAL PLANNING AND ASSESSMENT

    ACT 1979 (AS AMENDED)

    THAT the North Sydney Independent Planning Panel, under the delegation of the A/General

    Manager as the consent authority, grant consent to Development Application No. 11/16 for

    alterations and additions to the existing semi detached dwelling including a rear ground floor

    addition on land at No.21 McDougall Street, Kirribilli, subject to the attached conditions and the

    following site specific conditions:-

  • Report of Luke Donovan, Senior Assessment Officer Page 19

    Re: 21 McDougall Street, Kirribilli

    Works wholly within the subject site

    C1. Structural drawings and certification prepared by a suitably qualified Engineer

    shall be prepared demonstrating that all works are located wholly within the site

    boundaries, and that no works are proposed to any common party walls and all

    new works do not rely structurally on the support from the common party walls.

    Additionally, no works are to be undertaken to the existing retaining walls

    straddling the boundaries at the rear of the site without first obtaining written

    consent from the owners of the adjoining land.

    Plans and specifications which comply with this condition shall be submitted to

    the Certifying Authority for approval prior to the issue of a Construction

    Certificate. The Certifying Authority must ensure that the building plans and

    specifications submitted, referenced on, and accompanying the issued

    Construction Certificate, fully satisfy the requirements of this condition.

    Note: If structural certification for the above cannot be obtained then a Section

    96 application is required to be lodged with Council seeking consent to

    undertake works to the party walls, and will require the owner’s consent

    of both neighbouring properties.

    (Reason: To ensure all works are located wholly within the subject site)

    Boundary Fencing

    C2. Any new boundary fencing must be constructed from timber to a maximum

    height of 1800mm above existing ground level.

    Plans and specifications which comply with this condition shall be submitted to

    the Certifying Authority for approval prior to the issue of a Construction

    Certificate.

    (Reason: To ensure consistency with the terms of this consent)

    New Windows and Doors

    C3. The new windows (W2 and W3) and doors (W1 and W4) must have aluminium

    or steel framing sections of a width of 45mm or wider, or to be timber-framed.

    Plans and specifications which comply with this condition shall be submitted

    to the Certifying Authority for approval prior to the issue of a Construction

    Certificate.

    (Reason: To be sympathetic to the character of the original dwelling)

    LUKE DONOVAN ROBYN PEARSON

    SENIOR ASSESSMENT OFFICER TEAM LEADER ASSESSMENTS

    Stephen Beattie

    MANAGER OF DEVELOPMENT SERVICES

  • September 2013 v1

    NORTH SYDNEY COUNCIL CONDITIONS OF DEVELOPMENT APPROVAL

    21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16

    A. Conditions that Identify Approved Plans Development in Accordance with Plans/documentation A1. The development must be carried out in accordance with the following drawings and

    documentation and endorsed with Council’s approval stamp, except where amended by the following conditions of this consent.

    Plan No. Issue Title Drawn by Received

    1 of 8 - Site Analysis Plan Architronics Building Design

    20/06/16

    3 of 8 - Roof joining analysis Architronics Building Design

    2/05/16

    4 of 8 - Windows schedule, BASIX Commitments

    Architronics Building Design

    30/05/16

    5 of 8 - Plan, SW elevation Architronics Building Design

    20/06/16

    6 of 8 - SE and NW elevations, section

    Architronics Building Design

    20/06/16

    - - Landscape Plan Leafscape Designs 10/05/16

    (Reason: To ensure that the form of the development undertaken is in accordance with the determination of Council, Public Information)

    Plans on Site A2. A copy of all stamped approved plans, specifications and documents (including the

    plans, specifications and documents submitted and approved with the Construction Certificate) must be kept on site at all times so as to be readily available for perusal by any officer of Council or the Principal Certifying Authority. All documents kept on site in accordance with this condition must be provided to any officer of the Council or the certifying authority upon their request.

    (Reason: To ensure that the form of the development undertaken is in

    accordance with the determination of Council, Public Information and to ensure ongoing compliance)

    ATTACHMENT TO IPP08 - 06/07/2016 Page 20

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 2 of 22

    September 2013 v1

    No Demolition of Extra Fabric A3. Alterations to, and demolition of the existing building shall be limited to that

    documented on the approved plans.

    (Reason: To ensure compliance with the approved development) External Finishes & Materials A4. External finishes and materials must be in accordance with the submitted schedule

    indicated on Drawing 4 of 8 dated 30 May 2015, prepared by Architronics and received by Council on 3 June 2016 unless otherwise modified by Council in writing. (Reason: To ensure that the form of the development undertaken is in

    accordance with the determination of Council, Public Information) C. Prior to the Issue of a Construction Certificate (and ongoing, where indicated). Works wholly within the subject site C1. Structural drawings and certification prepared by a suitably qualified Engineer shall be

    prepared demonstrating that all works are located wholly within the site boundaries, and that no works are proposed to any common party walls and all new works do not rely structurally on the support from the common party walls.

    Additionally, no works are to be undertaken to the existing retaining walls straddling the boundaries at the rear of the site without first obtaining written consent from the owners of the adjoining land.

    Plans and specifications which comply with this condition shall be submitted to the Certifying Authority for approval prior to the issue of a Construction Certificate. The Certifying Authority must ensure that the building plans and specifications submitted, referenced on, and accompanying the issued Construction Certificate, fully satisfy the requirements of this condition.

    Note: If structural certification for the above cannot be obtained then a Section 96 application is required to be lodged with Council seeking consent to undertake works to the party walls, and will require the owner’s consent of both neighbouring properties.

    (Reason: To ensure all works are located wholly within the subject site)

    Boundary Fencing C2. Any new boundary fencing must be constructed from timber to a maximum height of

    1800mm above existing ground level.

    ATTACHMENT TO IPP08 - 06/07/2016 Page 21

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 3 of 22

    September 2013 v1

    Plans and specifications which comply with this condition shall be submitted to the Certifying Authority for approval prior to the issue of a Construction Certificate.

    (Reason: To ensure consistency with the terms of this consent)

    New Windows and Doors C3. The new windows (W2 and W3) and doors (W1 and W4) must have aluminium or

    steel framing sections of a width of 45mm or wider, or to be timber-framed. Plans and specifications which comply with this condition shall be submitted to the Certifying Authority for approval prior to the issue of a Construction Certificate.

    (Reason: To be sympathetic to the character of the original dwelling)

    Dilapidation Report Damage to Public Infrastructure C4. A dilapidation survey and report (including photographic record) must be prepared by

    a suitably qualified consultant which details the pre-developed condition of the existing public infrastructure in the vicinity of the development site. Particular attention must be paid to accurately recording any pre-developed damaged areas so that Council is fully informed when assessing any damage to public infrastructure caused as a result of the development. A copy of the dilapidation survey and report is to be submitted to the Certifying Authority for approval prior to the issue of any Construction Certificate. The developer may be held liable for all damage to public infrastructure in the vicinity of the site, where such damage is not accurately recorded and demonstrated as pre-existing under the requirements of this condition.

    The developer shall bear the cost of carrying out works to restore all public infrastructure damaged as a result of the carrying out of the development, and no occupation of the development shall occur until damage caused as a result of the carrying out of the development is rectified. A copy of the dilapidation survey and report must be lodged with North Sydney Council by the Certifying Authority with submission of the Construction Certificate documentation. (Reason: To record the condition of public infrastructure prior to the

    commencement of construction)

    ATTACHMENT TO IPP08 - 06/07/2016 Page 22

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 4 of 22

    September 2013 v1

    Dilapidation Report Private Property (Excavation) C5. A full dilapidation survey and report on the visible and structural condition of all

    neighbouring structures within the ‘zone of influence’ of the required excavations must be submitted to the Certifying Authority for approval prior to the issue of any Construction Certificate. The zone of influence is to be defined as the horizontal distance from the edge of the excavation face to twice the excavation depth.

    The dilapidation report and survey is to be prepared by a consulting structural/geotechnical engineer agreed to by both the applicant and the owner of any affected adjoining property.

    All costs incurred in achieving compliance with this condition shall be borne by the person entitled to act on this Consent.

    In the event that access for undertaking the dilapidation survey is denied by an adjoining owner, the applicant MUST DEMONSTRATE, in writing, to the satisfaction of Council that all reasonable steps have been taken to obtain access and advise the affected property owner of the reason for the survey and that these steps have failed. Written concurrence must be obtained from Council in such circumstances.

    Note: This documentation is for record keeping purposes only, and may be used by

    the developer or affected property owner to assist in any action required to resolve any dispute over damage to adjoining properties arising from the works. It is in the applicant’s and adjoining owner’s interest for it to be as full and detailed as possible.

    (Reason: To record the condition of property/ies prior to the commencement of

    construction)

    Dilapidation Survey Private Property (Neighbouring Buildings) C6. A photographic survey and dilapidation report of adjoining properties Nos 19

    McDougall Street and 23 McDougall Street, Kirribilli detailing the physical condition of those properties, both internally and externally, including, but not limited to, such items as walls, ceilings, roof, structural members and other similar items, SHALL BE submitted to the Certifying Authority for approval prior to the issue of any Construction Certificate. The survey and report is to be prepared by an appropriately qualified person agreed to by both the applicant and the owner of the adjoining property. A copy of the report is to be provided to Council, if Council is not the Certifying Authority, prior to the issue of any Construction Certificate.

    All costs incurred in achieving compliance with this condition shall be borne by the person entitled to act on this Consent.

    ATTACHMENT TO IPP08 - 06/07/2016 Page 23

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 5 of 22

    September 2013 v1

    In the event that access for undertaking the photographic survey and dilapidation report is denied by an adjoining owner, the applicant MUST DEMONSTRATE, in writing, to the satisfaction of Council that all reasonable steps have been taken to obtain access and advise the affected property owner of the reason for the survey and that these steps have failed. Written concurrence must be obtained from Council in such circumstances.

    Note: This documentation is for record keeping purposes only, and may be used by

    an applicant or affected property owner to assist in any action required to resolve any dispute over damage to adjoining properties arising from the works. It is in the applicant’s and adjoining owner’s interest for it to be as full and detailed as possible.

    (Reason: Proper management of records)

    Structural Adequacy (Semi Detached and Terrace Buildings) C7. A report from an appropriately qualified and practising structural engineer, certifying

    the structural adequacy of the adjoining property No. 23 McDougall Street, Kirribilli which certifies its ability to withstand the proposed works and outlines any measures required to be implemented to ensure that no damage will occur to adjoining premises during the course of the works, must be submitted to the Certifying Authority for approval prior to the issue of any Construction Certificate. The measures outlined in the certified report must be complied with at all times.

    Under no circumstances shall the party or common wall be extended or altered without the prior written consent of the adjoining owner. Any such extension of the party wall shall be noted on title by way of appropriate easement or Section 88B instrument.

    (Reason: To ensure the protection and structural integrity of adjoining

    properties, and that common law property rights are recognised) Structural Adequacy of Existing Building C8. A report prepared by an appropriately qualified and practising structural engineer,

    certifying the structural adequacy of the property and its ability to withstand the proposed additional, or altered structural loads during all stages of construction shall be submitted to the Certifying Authority for approval prior to issue of any Construction Certificate. The certified report must also include all details of the methodology to be employed in construction phases to achieve the above requirements. The methodology in the certified report must be complied with at all times.

    (Reason: To ensure the structural integrity of the building is maintained)

    ATTACHMENT TO IPP08 - 06/07/2016 Page 24

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 6 of 22

    September 2013 v1

    Geotechnical Report C9. A report prepared by an appropriately qualified Geotechnical Engineer certifying that

    the existing rock formations and substrate on the site is capable of: a) withstanding the proposed loads to be imposed; b) withstanding the extent of the proposed excavation, including any

    recommendations for shoring works that may be required to ensure the stability of the excavation;

    c) providing protection and support of adjoining properties; and d) the provision of appropriate subsoil drainage during and upon completion of

    construction works must be submitted for approval by the Certifying Authority prior to the issue of any Construction Certificate. Recommendations made in the certified report must be complied with at all times.

    Building plans and specifications submitted for approval with any construction

    certificate application must comply with (a), (b), (c) and (d) above and the certified report, including any recommendations made in the said certified report.

    The Certifying Authority must ensure that the building plans and specifications

    submitted, referenced on and accompanying the issued Construction Certificate, fully satisfy the requirements of this condition.

    (Reason: To ensure the structural integrity of the subject site and adjoining sites

    during the excavation process) Sediment Control C10. Where construction or excavation activity requires the disturbance of the soil surface

    or existing vegetation, erosion and sediment control techniques, as a minimum, are to be in accordance with the publication Managing Urban Stormwater: Soils & Construction (4th edition, Landcom, 2004) commonly referred to as the “Blue Book” or a suitable and effective alternative method. A Sediment Control Plan must be prepared and submitted to the Certifying Authority for approval prior to the issue of any Construction Certificate and prior to any works commencing. The Sediment Control Plan must be consistent with the Blue Book and disclose:

    a) All details of drainage to protect and drain the site during the construction

    processes; b) All sediment control devices, barriers and the like;

    ATTACHMENT TO IPP08 - 06/07/2016 Page 25

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 7 of 22

    September 2013 v1

    c) Sedimentation tanks, ponds or the like; d) Covering materials and methods; and e) A schedule and programme of the sequence of the sediment and erosion

    control works or devices to be installed and maintained. f) Methods for the temporary and controlled disposal of stormwater during

    construction.

    All works must be undertaken in accordance with the approved Sediment Control plan. The Certifying Authority must ensure that the building plans and specifications submitted, referenced on and accompanying the issued Construction Certificate, fully satisfy the requirements of this condition.

    (Reason: To protect the environment from the effects of sedimentation and

    erosion from development sites) Waste Management Plan C11. A Waste Management Plan is to be submitted for approval by the Certifying Authority

    prior to the issue of any Construction Certificate. The plan must include, but not be limited to:

    a) The estimated volume of waste and method of disposal for the construction

    and operation phases of the development; b) The design of the on-site waste storage and recycling area; and c) Administrative arrangements for waste and recycling management during the

    construction process.

    The approved Waste Management Plan must be complied with at all times in the carrying out of the development. (Reason: To encourage the minimisation of waste and recycling of building

    waste)

    External Finishes and Materials C12. The external colours and finishes must be in accordance with the approved schedule

    of finishes and materials. The Certifying Authority must ensure that the building plans and specifications submitted, referenced on and accompanying the issued Construction Certificate, fully satisfy the requirements of this condition.

    (Reason: To ensure quality built form of development)

    ATTACHMENT TO IPP08 - 06/07/2016 Page 26

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 8 of 22

    September 2013 v1

    Roofing Materials - Reflectivity C13. Roofing materials must be factory pre-finished with low glare and reflectivity

    properties to be compatible with the colours of neighbouring buildings. The selected roofing material must not cause a glare nuisance or excessive reflectivity to adjoining or nearby properties. Plans and specifications which comply with this condition must be submitted to the Certifying Authority for approval prior to the issue of any Construction Certificate. The Certifying Authority must ensure that the building plans and specifications submitted, referenced on and accompanying the issued Construction Certificate, fully satisfy the requirements of this condition.

    (Reason: To ensure that excessive glare or reflectivity nuisance from roofing

    materials does not occur as a result of the development) Stormwater Management and Disposal Design Plan – Construction Issue

    C14. Prior to issue of the Construction Certificate, the applicant shall have a site drainage

    management plan prepared by a qualified drainage design engineer. The site drainage management plan must detail the following requirements of North Sydney Council:

    a) Compliance with BCA drainage requirements, Councils Engineering

    Performance guide and current Australian Standards and guidelines, such as AS/NZ3500.3.2 1998, National Plumbing and Drainage Code.

    b) Stormwater runoff and subsoil drainage generated by the approved dwellings must be conveyed in a controlled manner by gravity, partly to Council’s kerb in McDougall Street and partly to the existing stormwater drainage system.

    c) All redundant stormwater pipelines within the footpath area shall be removed and the footpath and kerb reinstated.

    d) Pipelines within the footpath area shall be hot dipped galvanised steel rectangular hollow section with a minimum wall thickness of 4.0 millimetres and a section height of 100 millimetres.

    e) Any footpath panel on McDougall Street disturbed for the purpose of stormwater connection shall be reconstructed as whole panel.

    f) All sub-soil seepage drainage shall be discharged via a suitable silt arrester pit, directly to Council’s nearest stormwater drainage line. Details of all plans certified as being adequate for their intended purpose and complaint with the provisions of AS3500.3.2 by an appropriately qualified and practising civil engineer, shall be submitted with the application for a Construction Certificate.

    g) The design and installation of the Rainwater Tanks shall comply with Basix and Sydney Water requirements. Overflow from tank shall be connected by gravity to the stormwater disposal system.

    h) Prevent any stormwater egress into adjacent properties by creating physical barriers and surface drainage interception.

    ATTACHMENT TO IPP08 - 06/07/2016 Page 27

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 9 of 22

    September 2013 v1

    Details demonstrating compliance are to be submitted with the Construction Certificate.

    The Certifying Authority issuing the Construction Certificate must ensure that the approved drainage plan and specifications, satisfying the requirements of this condition, is referenced on and accompanies the Construction Certificate. (Reason: To ensure controlled stormwater management and disposal without

    nuisance) Bond for Damage and Completion of Infrastructure Works – Stormwater, Kerb and Gutter, Footpaths, Vehicular Crossing and Road Pavement C15. Prior to the issue of any Construction Certificate, security deposit or bank guarantee

    must be provided to Council to the sum of $2,000.00 to be held by Council for the payment of cost for any/all of the following: a) making good any damage caused to any property of the Council as a

    consequence of the doing of anything to which this consent relates, b) completing any public work (such as road work, kerbing and guttering,

    footway construction, stormwater drainage and environmental controls) required in connection with this consent

    c) remedying any defects in any such public work that arise within 6 months after

    the work is completed. The security required by this condition and in the schedule contained later in these conditions must be provided by way of a deposit with the Council; or other such guarantee that is satisfactory to Council (such as a bank guarantee). Any guarantee provided as security must name North Sydney Council as the nominated beneficiary and must not be subject to an expiry date. The security will be refundable following the expiration of 6 months from the issue of any final Occupation Certificate or completion of public work required to be completed (whichever is the latest) but only upon inspection and release by Council’s Engineers. Council shall have full authority to make use of the bond for such restoration works as deemed necessary by Council in circumstances including the following: - • where the damage constitutes a hazard in which case Council may make use of

    the security immediately; • the applicant has not repaired or commenced repairing damage within 48 hours

    of the issue by Council in writing of instructions to undertake such repairs or works;

    • works in the public road associated with the development are to an unacceptable quality; and

    • the Certifying Authority must ensure that security is provided to North Sydney Council prior to issue of any Construction Certificate.

    ATTACHMENT TO IPP08 - 06/07/2016 Page 28

    http://www.austlii.edu.au/au/legis/nsw/consol_act/epaaa1979389/s4.html#environment�http://www.austlii.edu.au/au/legis/nsw/consol_act/epaaa1979389/s4.html#control�

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 10 of 22

    September 2013 v1

    (Reason: To ensure appropriate security for works on public land and an appropriate quality for new public infrastructure)

    Asbestos Material Survey C16. A report must be prepared by a suitably qualified person in relation to the existing

    building fabric to be demolished and/or disturbed identifying the presence or otherwise of asbestos contamination and, if asbestos contamination is present, making recommendations as to the work required to safely address the contamination. Any demolition works or other works identified in the report as having to be carried out must be carried out in accordance with the recommendations of the report and the following:

    a) the removal of asbestos must be undertaken by a WorkCover licensed contractor;

    b) all removal must be in strict accordance with the requirements of the WorkCover Authority in relation to the removal, handling and disposal of material containing asbestos and any Work Safe Australia requirements.

    c) during the removal of any asbestos a sign stating “DANGER ASBESTOS REMOVAL IN PROGRESS” must be erected in a visible position at the boundary of the site; and

    d) Waste disposal receipts must be provided to the Certifying Authority as proof of correct disposal of asbestos laden waste.

    The report must be submitted to the Certifying Authority for approval prior to the issue of any Construction Certificate. The Certifying Authority must ensure that the report, and other plans, referenced on and accompanying the issued Construction Certificate, fully satisfy the requirements of this condition. (Reason: To ensure the long term health of workers on site and occupants of the

    building is not put at risk unnecessarily) Security Deposit/ Guarantee Schedule C17. All fees and security deposits/ guarantees in accordance with the schedule below must

    be provided to Council prior to the issue of any Construction Certificate:

    Security deposit/ guarantee Amount ($) Footpath Damage Bond $2,000.00 TOTAL BONDS $2,000.00

    The security required by the above schedule must be provided by way of a deposit with the Council; or other such guarantee that is satisfactory to Council (such as a bank guarantee). Any guarantee provided as security must name North Sydney Council as the nominated beneficiary and must not be subject to an expiry date.

    (Reason: Compliance with the development consent)

    ATTACHMENT TO IPP08 - 06/07/2016 Page 29

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 11 of 22

    September 2013 v1

    BASIX Certificate C18. Under clause 97A(3) of the Environmental Planning & Assessment Regulation 2000,

    it is a condition of this development consent that all the commitments listed in BASIX Certificate No. (A213822_03) for the development are fulfilled. Plans and specifications complying with this condition must be submitted to the Certifying Authority for approval prior to the issue of any Construction Certificate. The Certifying Authority must ensure that the building plans and specifications submitted, referenced on and accompanying the issued Construction Certificate, fully satisfy the requirements of this condition.

    (Reason: To ensure the proposed development will meet the Government’s requirements for sustainability and statutory requirements)

    D. Prior to the Commencement of any Works (and continuing where indicated)

    Public Liability Insurance – Works on Public Land D1. Any person or contractor undertaking works on public land must take out Public Risk

    Insurance with a minimum cover of $20 million in relation to the occupation of public land and the undertaking of approved works within Council’s road reserve or public land, as approved by this consent. The Policy is to note, and provide protection/full indemnification for North Sydney Council, as an interested party. A copy of the Policy must be submitted to Council prior to commencement of any works. The Policy must be valid for the entire period that the works are being undertaken.

    (Note: Applications for hoarding permits, vehicular crossings etc will require evidence of insurance upon lodgement of the application.)

    (Reason: To ensure the community is protected from the cost of any claim for

    damages arising from works on public land) Sydney Water Approvals D2. Prior to the commencement of any works, the approved plans must be submitted to

    Sydney Water to determine whether the development application will affect Sydney Water’s sewer and water mains, stormwater drains and/or easements, and if further requirements need to be met. The Certifying Authority must ensure that Sydney Water has appropriately stamped the plans before the commencement of building works.

    Notes: Sydney Water Building Plan Approvals can be obtained from the Sydney

    Water Tap in™ online service. Building plans must be submitted to the Tap in™ to determine whether the development will affect any Sydney Water sewer or water main, stormwater drains and/or easement, and if further requirements need to be met. For further information visit http://www.sydneywater.com.au/tapin/index.htm or call 13 000 TAP IN (1300 082 746) for further information.

    (Reason: To ensure compliance with Sydney Water requirements)

    ATTACHMENT TO IPP08 - 06/07/2016 Page 30

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 12 of 22

    September 2013 v1

    Asbestos Material Survey

    D3. Prior to the commencement of any works, a report must be prepared by a suitably qualified person in relation to the existing building fabric to be demolished and/or disturbed identifying the presence or otherwise of asbestos contamination and, if asbestos contamination is present, making recommendations as to the work required to safely address the contamination. Any demolition works or other works identified in the report as having to be carried out must be carried out in accordance with the recommendations of the report and the following:

    a) the removal of asbestos must be undertaken by a WorkCover licensed contractor;

    b) all removal must be in strict accordance with the requirements of the WorkCover Authority in relation to the removal, handling and disposal of material containing asbestos and any Work Safe Australia requirements.

    c) during the removal of any asbestos a sign stating “DANGER ASBESTOS REMOVAL IN PROGRESS” must be erected in a visible position at the boundary of the site; and

    d) Waste disposal receipts must be provided to the Certifying Authority as proof of correct disposal of asbestos laden waste.

    The report must be submitted to the Certifying Authority for approval prior to the issue of any Construction Certificate. The Certifying Authority must ensure that the report, and other plans, referenced on and accompanying the issued Construction Certificate, fully satisfy the requirements of this condition.

    (Reason: To ensure the long term health of workers on site and occupants of the

    building is not put at risk unnecessarily) Commencement of Works Notice

    D4. Building work, demolition or excavation in accordance with this development consent

    must not be commenced until the developer has given at least 2 days notice to North Sydney Council of the person’s intention to commence building work, demolition or excavation in accordance with this development consent.

    (Reason: To ensure appropriate safeguarding measures are in place prior to the commencement of any building work, demolition or excavation)

    E. During Demolition and Building Work Cigarette Butt Receptacle E1. A cigarette butt receptacle is to be provided on the site for the duration of

    excavation/demolition/construction process, for convenient use of site workers.

    (Reason: To ensure adequate provision is made for builders’ waste)

    ATTACHMENT TO IPP08 - 06/07/2016 Page 31

  • 21 MCDOUGALL STREET, KIRRIBILLI DEVELOPMENT APPLICATION NO. 11/16 Page 13 of 22

    September 2013 v1

    Parking Restrictions

    E2. Existing public parking provisions in the vicinity of the site must be maintained at all times during works. The placement of any barriers, traffic cones, obstructions or other device in the road shoulder or kerbside lane is prohibited without the prior written consent of Council. Changes to existing public parking facilities/restrictions must be approved by the North Sydney Local Traffic Committee. The Developer will be held responsible for any breaches of this condition, and will incur any fines associated with enforcement by Council regulatory officers. (Reason: To ensure that existing kerbside parking provisions are not

    compromised during works) Road Reserve Safety E3. All public footways and roadways fronting and adjacent to the site must be maintained

    in a safe condition at all times during the course of the development works, with no obstructions caused to the said footways and roadways. Construction materials and plant must not be stored in the road reserve without approval of Council.. A safe pedestrian circulation route and a pavement/route free of trip hazards must be maintained at all times on or adjacent to any public access ways fronting the construction site. Where public infrastructure is damaged, repair works must be carried out in when and as directed by Council officers (at full Developer cost). Where pedestrian circulation is diverted on to the roadway or verge areas, clear directional signage and protective barricades must be installed in accordance with AS1742-3 (1996) “Traffic Control Devices for Work on Roads”. If pedestrian circulation is not satisfactorily maintained across the site frontage, and action is not taken promptly to rectify the defects, Council may undertake proceedings to stop work.