Application for extension of
Environmental Clearance
Of
“it/ITES sez”
at
village- ghamroj, sohna road, gurgaon,
haryana
BEING DEVELOPED BY:
m/S Dr. fresh health care pvt. LTD.
Village- Ghamroj, Tehsil- Sohna,
Gurgaon Sohna Road, Gurgaon, Haryana- 122102
PREPARED BY:
Environmental Consultant
M/s PERFACT ENVIRO SOLUTIONS PVT. LTD.
(NABET Registered wide list of accredited consultants
organizations/ Rev 30/ 7TH
MAY, 2015 at S.No-116)
NN Mall, Sector-3, Rohini, New-Delhi-85
Phone: 011-47528467; 011-47021086
Fax: - 011-475284
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 2
TABLE OF CONTENTS
FORM 1 & 1A ......................................................................................................... 4
CONCEPTUAL PLAN .............................................................................................. 42
INTRODUCTION........................................................................................................................... 43
ACTIVITIES/ AMENITIES ................................................................................................................ 43
SITE LOCATION ........................................................................................................................... 43
TYPE OF PROJECT ........................................................................................................................ 43
PROJECT DETAILS ........................................................................................................................ 43
POPULATION DETAILS .................................................................................................................. 44
WATER MANAGEMENT ................................................................................................................ 44
RAIN WATER COLLECTION DETAILS ................................................................................................. 45
POWER REQUIREMENT& BACK-UP ................................................................................................. 45
SOLID & HAZARDOUS WASTE MANAGEMENT .................................................................................. 45
PARKING MANAGEMENT .............................................................................................................. 45
GREEN AREA DEVELOPMENT ......................................................................................................... 45
ENVIRONMENT REPORT ....................................................................................... 46
EXECUTIVE SUMMARY OF THE PROJECT ................................................................................ 48
3.1.1 Activities: ........................................................................................................................... 48
INTRODUCTION OF THE BACKGROUND INFORMATION......................................................... 50
3.2.1 Brief Description of the Nature of the Project: .................................................................. 50
PROJECT DESCRIPTION ........................................................................................................... 50
3.3.1 Land Use and Ownership of the site land .......................................................................... 50
3.3.2 Location of the project with connectivity........................................................................... 50
RESOURCES ............................................................................................................................... 54
3.4.1 Water Resource Management ........................................................................................... 54
3.4.2 Energy Resource Management .......................................................................................... 55
SITE ANALYSIS ........................................................................................................................ 56
3.5.1 Eco-sensitive areas with distance from project location ................................................... 56
3.5.2 Social Infrastructure available ........................................................................................... 57
PROPOSED INFRASTRUCTURE ................................................................................................ 57
3.6.1 Types of Buildings & Activities Proposed ........................................................................... 57
ENVIRONMENT MANAGEMENT PLAN ................................................................................... 58
3.7.1 ENVIRONMENT MANAGEMENT DURING CONSTRUCTION................................................ 58
3.7.2 ENVIRONMENT MANAGEMENT DURING OPERATION ...................................................... 60
ANTICIPITATED IMPACT & MITIGATION MEASURES .............................................................. 70
3.8.1 DURING CONSTRUCTION PHASE ........................................................................................ 70
3.8.2 DURING OPERATION PHASE .............................................................................................. 71
ENVIRONMENT MONITORING PLAN ...................................................................................... 72
CONSTRUCTION STATUS ...................................................................................... 74
SITE PHOTOGRAPHS ............................................................................................. 75
TOPOGRAPHICAL MAP ......................................................................................... 77
LAYOUT PLAN....................................................................................................... 78
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 3
ZONING PLAN....................................................................................................... 79
COPY OF EARLIER EC ............................................................................................ 80
CERTIFIED COPY OF MOEF&CC REGIONAL OFFICE (COMPLIANCE LETTER) ........ 81
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 4
FORM 1 & 1A
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 5
FORM 1
I. Basic Information
S.No. Item Details
1. Name of the project/s IT/ITES SEZ
2. S. No. in the schedule 8 (b)
3.
Proposed capacity/
area/length/ tonnage
to be handled/
command area/ lease
area/ number of wells
to be drilled
Plot Area- 2,34,270 sq m
Net plot area- 2,20,393.6 sq m
Built-up area- 6,33,763.5005 sq m
4. New/ Expansion/
Modernization
Extension in environmental clearance.
5. Existing Capacity/
Area etc.
Constructed Build up : 68,527.943 sq m
6. Category of Project i.e.
‘A’ or ‘B’
B
7.
Does it attract the
general condition? If
yes, please specify.
No
8.
Does it attract the
specific condition? If
yes, please specify.
No
9.
Location Sohna Road
Village Ghamroj
Tehsil Sohna
District Gurgoan
State Haryana
10.
Nearest railway
station/ airport along
with distance in kms.
Nearest railway station : Basai Dhankot Railway Station -
17.38 Km NW
Nearest Airport : Indira Gandhi International Airport, - 25.84
Km NE
11.
Nearest Town, city,
District Headquarters
along with distance in
kms.
District head quarters Gurgaon : 17 km towards south
12.
Village Panchayats,
Zilla Parishad,
Municipal
Corporation, Local
body (complete postal
addresses with
IT/ITES SEZ
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 6
telephone nos. to be
given)
13. Name of the applicant
M/s Dr. Fresh Health Care Pvt. Ltd
14. Registered Address
Village- Ghamroj, Tehsil- Sohna,
Gurgaon Sohna road, Gurgaon, Haryana- 122102.
15. Address for
correspondence:
Dr. Fresh Health Care Pvt. Ltd.
Village- Ghamroj, Tehsil- Sohna,
Gurgaon Sohna road, Gurgaon, Haryana- 122102
Name Pradeep Dwivedi and Dinesh Sikka
Designation
(Owner/Partner/CEO) Vice President/Senior Manager
Address
Dr. Fresh Health Care Pvt. Ltd.
Village- Ghamroj, Tehsil- Sohna,
Gurgaon Sohna road, Gurgaon, Haryana- 122102
Pin Code 122102
E-mail [email protected]/[email protected]
Telephone No. 9910204969/9811939865
Fax no. 91-124-2872600
16.
Details of Alternative
Sites examined, if any.
Location of these sites
should be shown on a
toposheet.
Environmental clearance for the project has already been
granted only extension is required hence no alternative site
examined.
17. Interlinked Projects No
18.
Whether separate
application of
interlinked project has
been submitted?
Not Applicable
19. If yes, date of
submission Not Applicable
20. If no, reason Not applicable
21.
Whether the proposal
involves
approval/clearance
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 7
under: if yes, details of
the same and their
status to be given.
(a) The Forest
(Conservation) Act,
1980?
(b) The Wildlife
(Protection) Act,
1972?
(c) The C.R.Z.
Notification, 1991?
Applicable. Approval under this shall be submitted.
Not applicable
Not applicable
22.
Whether there is any
Government Order/
Policy relevant/
relating to the site?
No mater plan is applicable.
23. Forest land involved
(hectares) No forest land is involved
24.
Whether there is any
litigation pending
against the project
and/ or land in which
the project is propose
to be set up?
(a) Name of the
Court
(b) Case No.
(c) Orders/
directions of
the Court, if
any and its
relevance with
the proposed
project.
Not applicable
Not applicable
Not applicable
II. Activity
1. Construction, operation or decommissioning of the Project involving actions,
which will cause physical changes in the locality (topography, land use,
changes in water bodies, etc.)
S.No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 8
1.1 Permanent or temporary
change in land use, land
cover or topography
including increase in
intensity of land use (with
respect to local land use
plan)
No IT/ITES SEZ NOTIFIED BY Govt of
India.
1.2 Clearance of existing land,
vegetation and buildings?
No No clearance of building is envisaged.
The construction is under process. It
has got some sparse vegetation which
has been cleaned off before the
construction.
1.3
Creation of new land uses?
No The plot of project site is already
earmarked under IT/ITES SEZ
category.
1.4 Construction works?
Yes
The construction is under process as
per the approved plans. Under
processing area built up of
68,527.943 sqm has been
constructed. The construction work
for rest of the processing area & non
processing also should be done.
1.5 Demolition works? No Not Applicable
1.6 Temporary sites used for
construction works or
housing of construction
workers?
No Construction workers is being hired
from local areas. No labour camps is
being provided at project site.
1.8 Above ground buildings,
structures or earthworks
including linear structures,
cut and fill or excavations
Yes Quantities of earthwork involved in
the construction is also under process.
3 basements has already been
constructed. 94,748 cu m of soil
already been excavated.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 9
1.9 Underground works
including mining or
tunnelling?
No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and
manufacturing processes?
No No production or manufacturing are
involved as this is an IT/ITES SEZ
project.
1.14 Facilities for storage of goods
or materials?
Yes None
1.15 Facilities for treatment or
disposal of solid waste or
liquid effluents?
Yes During construction phase :
App. 200-250 no of local labours had
been employed. In future same shall
be followed. The solid waste
generated during construction phase
will be 37.5 kg/day which is being
disposed off at municipal solid waste
site.
The sewage solid waste is being
discharged to septic tank via soak pit
same shall be followed in future
construction
During operation phase:
Total wastewater generation from the
proposed project will be approx.
2410 KLD. The wastewater generated
will be treated in 3 MLD capacity STP
located within the premises.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 10
● Treated effluent will be reused for
flushing, cooling and horticultural
purposes.
□ Solid waste
Approx. 9645 kg/day of solid waste
shall be generated from the complex
during operation phase., the details of
which along with its management is
as follow:
During construction phase:
Separate raw material yard has been
made located within the project site.
During Operation Area:
As there will be development of
IT/ITES SEZ. So the goods will be
stored in respective residential,
commercial units or it offices.
□ Waste Management
6,752 kg/day of organic waste shall
be disposed off at MSW site. & 289
kg/day of recyclable waste shall be
given to approved recycler. Details is
given in EMP reports.
1.16 Facilities for long term
housing of operational
workers?
No No long term housing of operational
workers are envisaged. Only
temporary shelters have been
provided during construction phase.
1.17
New road, rail or sea traffic
during construction or
operation?
No No new road , rail etc. will be
proposed
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 11
1.18
New road, rail, air,
waterborne or other
transport infrastructure
including new or altered
routes and stations, ports,
airports etc.?
No Not applicable. Transportation
measures existing near site area.
Railway station:
Basai Dhankot Railway Station :
17.38 Km NW
Airport :
IGIT : 25.84 km NE
Highway :
State Highway 13 : 0.20 KmE
1.19 Closure or diversion of
existing transport routes or
infrastructure leading to
changes in traffic
movements?
No Not applicable
1.20 New or diverted
transmission lines or
pipelines?
No Not applicable
1.21 Impoundment, damming,
culverting, realignment or
other changes to the
hydrology of watercourses
or aquifers?
No
Not applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of
water from ground or
surface waters?
Yes
Public supply water from HUDA shall
be used. However in case of
emergencies ground water will be
extracted with prior permission from
central ground water authority.
During construction phase water is
being taken from tanker supplies
which is supplied by treated water
from nearby STP.
1.24 Changes in water bodies or
the land surface affecting
drainage or run-off?
No There will be no change in water
bodies.
1.25 Transport of personnel or
materials for construction,
operation or
decommissioning?
Yes During Construction phase: Materials
during construction phase are being
transported by truck, trolley etc.
During Operation Phase: Car, two-
wheeler, trucks etc. will be used
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 12
1.26 Long-term dismantling or
decommissioning or
restoration works?
No Not Applicable
1.27 Ongoing activity during
decommissioning which
could have an impact on the
environment?
No Not Applicable
1.28 Influx of people to an area in
either temporarily or
permanently?
Yes Approx. 200-250 of local labours
have been employed during
construction phase. In the proposed
project there is influx of 38,000
peoples as staff, 7,500 peoples as
residents & 3,800 as visitors.
1.29 Introduction of alien
species?
No Not applicable
1.30 Loss of native species or
genetic diversity?
No Not applicable
1.31 Any other actions? No Not Applicable
2. Use of Natural resources for construction or operation of the Project (such as
land, water, materials or energy, especially any resources which are non-
renewable or in short supply):
S.No. Information/checkli
st confirmation
Yes/
No
Details thereof (with approximate
quantities /rates, wherever possible)
with source of information data
2.1 Land especially
undeveloped or
agricultural land (ha)
No Total plot area of 2,34,270 sqm and net
plot area of 2,20,393.6 sqm is vacant
piece of land has been earmarked for
mixed land use by the development
authority. The construction is under
process. 2.2 Water (expected source
& competing users) unit:
KLD
Yes Pr. Source: Municipal water supply
Total Water Required- 3529 KLD
2.3 Minerals (MT) No Not Applicable
2.4 Construction material –
stone, aggregates, sand
/ soil (expected source
– MT)
Yes The major materials required for
construction of the project are steel,
tiles, glass, cement, agate, bricks,
flooring tiles / stones, sanitary and
hardware items, electrical fittings, etc.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 13
2.5 Forests and timber
(source – MT) No
Plywood for doors & windows shall be
used & shall be purchased from local
market.
2.6 Energy including
electricity and fuels
(source, competing
users) Unit: fuel (MT),
energy (MW)
Yes Power requirement: 47 MVA
Power supply : DHBVN
Fuel: HSD (Low sulphur Diesel)
D.G set capacity : 36 × 1.5 MVA
2.7 Any other natural
resources (use
appropriate standard
units)
No Not Applicable
3. Use, storage, transport, handling or production of substances or materials, which
could be harmful to human health or the environment or raise concerns about actual
or perceived risks to human health.
S. No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
3.1 Use of substances or
materials, which are
hazardous (as per MSIHC
rules) to human health or
the environment (flora,
fauna, and water
supplies)
Yes The project is an IT SEZ building
and hence no storage of hazardous
chemicals is being done, except
HSD required to run standby DG
sets. Proposed management of used
oil & e-waste shall be done.
3.2 Changes in occurrence of
disease or affect disease
vectors (e.g. insect or
water borne diseases)
No Proper drainage system is being
planned so as to minimize
possibility of water stagnation. This
will effectively reduce the
reproduction & growth of disease
vectors.
3.3 Affect the welfare of
people e.g. by changing
living conditions?
Yes No adverse impact on human
health and their living conditions
due to proposed project are
envisaged. However this project
provides employment to approx.
200-250 local labours in
construction phase and 38,000
persons in operation phase. Due to
commercial and infrastructure
development in and around project
area there is a chance of
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 14
development of small businesses,
which is lead to improved living
conditions.
3.4 Vulnerable groups of
people who could be
affected by the project
e.g. hospital patients,
children, the elderly etc.
No Not applicable
3.5 Any other causes No Not applicable
4. Production of solid wastes during construction or operation or
S.No.
Information/Checklist
confirmation
Yes/N
o
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
4.1 Spoil, overburden or
mine wastes. No Not applicable
4.2 Municipal waste
(domestic and or
commercial wastes)
Yes
□ Solid waste
Approx. 9645 kg/day of solid waste
shall be generated from the complex
during operation phase., the details of
which along with its management is
as follow:
During construction phase:
Separate raw material yard has been
made located within the project site.
During Operation Area:
As there will be development of
IT/ITES SEZ. So the goods will be
stored in respective residential,
commercial units or it offices.
4.3 Hazardous wastes (as per
Hazardous Waste
Management Rules)
Yes During Construction phase: Used oil
whenever generated from the DG sets
is being kept in an isolated area and in
leak proof container and is being sent
to approved recycler.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 15
During Operation Phase: Used oil
from diesel generators will be
carefully stored in HDPE drums in
isolated covered facility. The used oil
will be sold to vendors authorized by
Central Pollution Control Board for
the treatment of the same.
Suitable care will be taken so that
spills / leaks of used oil from storage
could be avoided.
E-waste shall be collected and given to
approved recycler of SPCB.
4.4 Other industrial process
wastes
No Not applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other
sludge from effluent
treatment
Yes Approx. 60 kg/day of municipal
grade sludge shall be generated
during operational phase which shall
be used for horticultural purpose. The
unused sludge shall be given to
farmers or nursery.
4.7 Construction or
demolition wastes
Yes Construction waste is being used for
flooring & Back filling in roads etc.
4.8 Redundant machinery or
equipment
No Not applicable
4.9 Contaminated soils or
other materials No Not applicable
4.10 Agricultural wastes
No Not applicable
4.11 Other solid wastes
No None
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S.No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 16
5.1 Emissions from
combustion of fossil fuels
from stationary or mobile
sources
Yes During Construction phase:
DG sets of capacity 125/62.5 KVA
is being installed acoustically
enclosed with adequate stack
height.
During Operation Phase:
The only source of emission from
combustion of fuel shall be DG sets
of 36×1.5MVA. Hence, to avoid the
emissions, stack height of 6 m above
roof level for the D.G. Set shall be
provided. The DG sets shall meet all
the norms prescribed by CPCB.
5.2 Emissions from production
processes
No Not applicable
5.3 Emissions from materials
handling including
storage or transport Yes
Construction material stored yards
is being kept always covered to
reduce emission. Water sprinkling
is being done for dust suppression.
5.4 Emissions from
construction activities
including plant and
equipment
Yes
Some emission are envisaged from
plant, machinery and equipment
engaged during construction phase.
Water sprinkling is being done for
dust suppression.
5.5 Dust or odours from
handling of materials
including construction
materials, sewage and
waste
Yes
During loading & unloading of
construction material, dust is
generated. Water is being sprinkled
and tarpaulin cover is being
provided over stored raw material to
reduce dust emission. Odours can be
generated from STP. However the
STP working shall be on aerobic
technology, so as to minimize odour
problems. Mobile toilets during
construction phase have been
provided & waste water is being
disposed off in septic tank followed
by soak pit.
5.6 Emissions from
incineration of waste. No
Incineration of waste is not being
carried out.
5.7 Emissions from burning of
waste in open air (e.g. slash No
Open burning of waste is not being
permitted within site.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 17
materials, construction
debris).
5.8 Emissions from any other
sources. No Not applicable
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever
possible) with source of
information data with source of
information data
6.1 From operation of equipment
e.g. engines, ventilation plant,
crushers
Yes Noise generation from DG sets. The
DG sets shall be located
strategically and housed in
acoustic enclosure so as to achieve
a 75 dB(A) maximum noise. Apart
from this construction activities
will be limited in day time only.
The equipment such as mixers
machines, cranes. Bulldozers,
excavators is being used which is
of highest quality and maintenance
of machinery is ensured.
6.2 From industrial or similar
processes No Not applicable
6.3 From construction or
demolition
Yes
Due to various activities there are
short term noise impacts in the
immediate vicinity of the project.
These are restricted to day time
only. However employment has
been done.
6.4 From blasting or piling No Not Applicable
6.5 From construction or
operational traffic
Yes Some amount of noise will be
generated from vehicular
movement in the construction
phase and will be generated during
operational phase also. Plantation
around the boundary wall shall be
done to reduce noise impact.
6.6 From lighting or cooling
systems No Not applicable
6.7 From any other sources No Not applicable
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 18
7. Risks of contamination of land or water from releases of pollutants into the
ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S. No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
7.1 From handling, storage,
use or spillage of
hazardous materials Yes
Used oil is the hazardous material
proposed to be generated in the
complex. It shall be stored in HDPE
drums and shall be sold to authorize
recycler. E waste generated shall be
given to approved recycler.
7.2 From discharge of sewage
or other effluents to water
or the land (expected mode
and place of discharge)
Yes The wastewater generated shall be
treated in onsite sewage treatment
plant. The effluent from this plant
shall be used for flushing, landscaping
& cooling purposes. The excess treated
water shall be given to tanker water
supply for construction purposes.
7.3 By deposition of pollutants
emitted to air into the land
or into water Yes
The DG sets is shall be provided with
adequate stack height as per the CPCB
norms to disperse pollutants
effectively.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term
build-up of pollutants in
the environment from
these sources?
No Not applicable
8. Risk of accidents during construction or operation of the Project, which could
affect human health or the environment.
S. No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
8.1 From explosions,
spillages, fires etc. from
storage, handling, use or
production of hazardous
substances
Yes
All appropriate measures are being
taken during construction phase.
Proper fire fighting system will be
adopted during operation phase.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 19
The waste oil is being stored in
sealed containers and sold to
authorized recyclers.
8.2 From any other causes No Not applicable
8.3 Could the project be
affected by natural
disasters causing
environmental damage
(e.g. floods, earthquakes,
landslides, cloudburst
etc.)? Yes
The area under study falls in Zone-
IV, according to the Indian
Standard Seismic Zoning Map.
Suitable seismic coefficients in
horizontal and vertical directions
respectively, is being adopted while
designing the structure.
To avert any danger due to floods
plinth level is being kept much
above the highest flood level.
Standby pumps is being in place to
pump out the excess rain water.
9. Factors which should be considered (such as consequential development) which
could lead to environmental effects or the potential for cumulative impacts with other
existing or planned activities in the locality.
S. No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever
possible) with source of
information data
9.1 Lead to development of
supporting facilities, ancillary
development or development
stimulated by the project which
could have impact on the
environment e.g.:
Supporting
infrastructure (roads,
power supply, waste or
waste water treatment,
etc.)
Housing development
Extractive industries
Supply industries
Other
No
No
No
No
Yes
The proposed project is being
positive impact on the ancillary
infrastructure like road, market,
public health amenities, and
conveyance facilities in the area.
Infrastructure like roads, power
network exist in the area. STP will
be installed for the treatment of
waste water.
Shop, taxi services etc. may come
in the vicinity.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 20
9.2 Lead to after-use of the site,
which could have an impact
on the environment.
No Not applicable
9.3 Set a precedent for later
developments Yes It will attract peoples to develop
organize IT/ITES SEZ.
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar
effects
No Not applicable
III. Environmental Sensitivity
S.
No.
Areas Name/
Identity
Aerial distance
(within 15 km.)
from Proposed
project location
boundary
1 Areas protected under
international conventions,
national or local legislation for
their ecological, landscape,
cultural or other related value
None None
2 Areas which are important or
sensitive for ecological reasons -
Wetlands, watercourses or
other water bodies, coastal
zone, biospheres, mountains,
forests
Water Bodies
Mehandwari Nadi
Damdama Lake
Gurgaon Canal
4.82 Km SE
6.55 Km EES
12.31 Km SE
3 Areas used by protected,
important or sensitive species
of flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
None none
4 Inland, coastal, marine or
underground waters.
None None
5 State, National boundaries Delhi 13.60 Km NE
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 21
6 Routes or facilities used by the
public for access to recreation
or other tourist, pilgrim areas
NH-8
NH-71B
State Highway 13
Basai Dhankot
Railway Station
Gurgaon Railway
Station
Garhi Harsaru
Junction Rly Station
Airport
Indira Gandhi
International Airport
11.27 Km NW
8.93 Km S
0.20 Km E
17.38Km NW
18.92 Km NW
18.10 Km NW
25.84 Km NE
7 Defense installations None None
8 Densely populated or built-up
area
Ghamroj
0.77 Km SW
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 22
9 Areas occupied by sensitive
man-made land uses
(hospitals, schools, places of
worship, community facilities)
Hospital
EktaHospital
Upkar Hospital near
Police Station,
Badshahpur
Masonic Polyclinic
Dharam Hospital
Post Office
Post Office Sohna-
Gurgaon
Rd .Badshahpur
Post office Maharaja
Aggarsain Rd.
BaludaSohna
Post Office Sector-56
Places of worship
DadiSattiTemple
Hanuman Mandir
Garhi Bazidpur
6.77 Km N
7.37 Km N
8.04 Km NE
7.36 Km NW
8.71 Km S
11.45 Km NE
3.25 Km NW
4.05 Km SE
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 23
Baba Baladas Temple
School
Govt. Senior
Secondary School
JK Padampat
Singhania Institute
of Management
&Technology
JK Education
Foundation
Bank
State Bank of India,
Sector-66
Gurgaon Gramin
Bank
ICICI Bank Branch &
ATM
5.52 Km E
2.68 Km N
2.93 KM NE
2.31 Km NE
7.87 Km N
3.02 Km N
7.80 KM N
10 Areas containing important,
high quality or scarce resources
(Ground water resources,
surface resources, forestry,
agriculture, fisheries, tourism,
minerals)
None None
11 Areas already subjected to
pollution or environmental
damage. (Those where existing
legal environmental standards
are exceeded)
None None
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd.
24
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)
Nil The project area
falls in seismic
zone –IV
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 25
“I hereby give undertaking that the data and information given in the application and
enclosures are true to the best of my knowledge and belief and I am aware that if any
part of the data and information submitted is found to be false or misleading at any
stage, the project will be rejected and clearance given, if any, to the project will be
revoked at our risk and cost”.
Date: Place:
(Authorized Signatory)
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 26
FORM 1A
CHECK LIST OF ENVIRONMENTAL IMPACTS
(Project proponents are required to provide full information and wherever necessary attach
explanatory notes with the Form and submit along with proposed environmental
management plan & monitoring programme)
I. LAND ENVIRONMENT
(Attach panoramic view of the project site and the vicinity)
1.1 Will the existing landuse get
significantly altered from the
project that is not consistent
with the surroundings?
(Proposed landuse must
conform to the approved Master
Plan / Development Plan of the
area. Change of landuse if any
and the statutory approval from
the competent authority be
submitted).
Attach Maps of
(i) Site location
(ii) Surrounding features of the
proposed site (within 500
meters)
(iii) The site (indicating levels &
contours) to appropriate scales.
If not available attach only
conceptual plans.
The project is construction of “IT/ITES SEZ
“Development is being done as per development
plan of area.
The construction is under process. The EC has
been granted on 6-01-2010.thus Appling for
extension of EC.
The site location is enclosed in Environment
report
Location Map enclosed in in Environment
report
Layout plan is enclosed as Environment report.
Conceptual plan is enclosed in as enclosure 2.
1.2 List out all the major project
requirements in terms of the
Total plot area
Net plot area
Built up area
Water consumption
2,34,270 sq m
2,20,393.6 sq m
633763.468 sqm
3529 KLD
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 27
Connectivity
Power requirement
Parking needs etc.
Nearest Highway: State highway 13 : 0.20 Km E
Nearest Airport : Indira Gandhi International
Airport, - 25.84 Km NE
47MVA
Parking Required : 7752
Parking Provided : 7800 ECS
1.3 What are the likely impacts of
the proposed activity on the
existing facilities adjacent to the
proposed site?
(Such as open spaces,
community facilities, details of
the existing land use, and
disturbance to the local
ecology).
The entire project influenced area is being
developed as per the provision of Gurgaon
Master Plan, thus no induced development is
foreseen due to the proposed project. Also the
proposed development is being carried out as
per the defined building by-laws; hence no
impact is envisaged due to proposed
development.
Further construction phase as well as operation
stage of the project, will generate direct and
indirect employment opportunities for a large
section of society. The employment will have
positive impact thereby increasing the quality of
life.
1.4 Will there be any significant
land disturbance resulting in
erosion, subsidence &
instability?
(Details of soil type, slope
analysis, vulnerability to
subsidence, seismicity etc. may
be given).
Soil Type:
Slit loam
Slope Analysis: The project area possesses
slightly undulating terrain.
Erosion / Subsidence:
Proper greening & paving of area is not cause
any soil erosion problem and subsidence.
Seismicity:
Seismic zone-IV, for which appropriate safety
measures shall be taken
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 28
1.5 Will the proposal involve
alteration of natural drainage
systems?
(Give details on a contour map
showing the natural drainage
near the proposed project site)
The proposed project activities will not cause
any alteration of natural drainage system.
Project site is plain.
1.6 What are the quantities of
earthwork involved in the
construction activity cutting,
filling, reclamation etc.
(Give details of the quantities of
earthwork involved, transport of
fill materials from outside the
site etc.)
The excavation of upto 3 basement level in order
to provide foundation and basement. This
excavated soil/ rock is being properly stacked
within the site under tarpaulin cover and reused
for backfilling purpose, roads construction etc.
as far as possible. The top soil is being preserved
separately and used for horticultural purpose
only.
1.7 Give details regarding water
supply, waste handling etc.
during the construction period.
Water Supply:
During construction stage, the water is being
taken from tanker water supplies.
Waste Generation / Handling:
Soil excavated is being reused for backfilling and
the fertile top soil reused for horticultural
purpose.
Spillage of oil from the machinery or cement
residual from concrete mixer is being properly
collected and disposed off.
For construction labour’s , proper sanitary
facilities like mobile toilet is being provided for
treating the sewage waste & wash areas is being
constructed and good hygienic conditions is
being maintained.
1.8 Will the low lying areas &
wetlands get altered?
(Provide details of how low lying
and wetlands are getting
modified from the proposed
activity)
No low lying and wetland area is present in and
around the project site.
1.9 Whether construction debris &
waste during construction cause
health hazard? (Give quantities
of various types of wastes
generated during construction
including the construction
The construction waste generated from the
project is being common in nature and is not
cause any health hazard to associate and nearby
population. The construction debris is being
used for land levelling /back filling. Waste
concrete is being reused as aggregate in
construction process.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 29
labour and the means of
disposal)
Mobile toilets & drinking water for construction
labour is being provided. The sewage and waste
water generated is being disposed off to septic
tank via soak pit.
2. WATER ENVIRONMENT
2.1 Give the total quantity of
water requirement for the
proposed project with the
breakup of requirements
for various uses.
How will the water
requirement met?
State the sources &
quantities and furnish a
water balance statement.
The total quantity of water requirement is
municipal supply of HUDA 3529 KLD &
met Primarily by public water supply and
secondary by Bore well Supply.
Domestic : 1899 KLD
Flushing : 881 KLD
Gardening : 442 KLD
Misc. : 5 KLD
Total Water Requirement : 3529 KLD
Fresh water : 1899 KLD
Treated Water Reuse : 1630 KLD
Total Waste Water Discharge : 2410 KLD
2.2 What is the capacity
(dependable flow or yield)
of the proposed source of
water?
Municipal water supply of HUDA is the
majn source of the water.
2.3 What is the quality of
water required, in case,
the supply is not from a
municipal source?
(Provide physical,
chemical, biological
characteristics with class
of water quality)
In case Public water supply is not adequate
water demand shall met by bore well after
taking prior permission from CGWB.
2.4 How much of the water
requirement can be met
from the recycling of
treated wastewater?
(Give the details of
quantities, sources and
usage)
Total treated water of 2169 KLD is being
generated from the S.T.P out of which 1630
KLD shall be reused in flushing, gardening,
cooling & misc. purposes within the project
premises.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 30
2.5 Will there be diversion of
water from other users?
(Please assess the impacts
of the project on other
existing uses and
quantities of
consumption)
There shall not be any diversion of water
from the other users as it will be planned as
per master plan of area.
2.6 What is the incremental
pollution load from
wastewater generated
from the proposed
activity?
(Give details of the
quantities and
composition of
wastewater generated
from the proposed
activity)
The total waste water generation from the
project shall be2410 KLD which is being
treated in S.T.P of capacity 3000 KLD. 1630
KLD of the treated water shall be reused for
flushing, gardening & misc. purposes.
Excess treated water of 539 KLD is being
given to tanker water supplier.
2.7 Give details of the water
requirements met from
water harvesting? Furnish
details of the facilities
created.
57 number of rain water harvesting pits
shall be provided at site.
(Details of Rain Water harvesting pit is
given in Environment Report).
2.8 What would be the impact
of the land use changes
occurring due to the
proposed project on the
runoff characteristics
(quantitative as well as
qualitative) of the area in
the post construction
phase on a long-term
basis?
Would it aggravate the
problems of flooding or
water logging in any way?
No adverse impacts are envisaged due to
proposed projects on the runoff
characteristics of the area as adequate
arrangement shall be made to trap the
rainwater and suitable storm water
drainage system shall be provided.
During the post-construction phase, run-
off from the project shall not be allowed to
stand or enter into roadside and nearby
drain. 57 no of rain water harvesting pits
shall be provided to recharge the ground
water.
2.9 What are the impacts of
the proposal on the
ground water?
(Will there be tapping of
ground water; give the
details of ground water
table, recharging capacity,
and approvals obtained
from competent authority,
if any)
Rain water harvesting shall recharge the
ground water; therefore there will be no
adverse impact on the ground water.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 31
2.10 What
precautions/measures are
taken to prevent the run-
off from construction
activities polluting land &
aquifers?
(Give details of quantities
and the measures taken to
avoid the adverse impacts)
During the construction phase, runoff from
the construction site is not allowed into the
roadside and nearby drain. Adequate
measures is being taken to collect such
runoff and either is being reused or treated
as per the norms. The runoff is not being
allowed to come in contact with the effluent
generated from construction camps. The
runoff during the rainy season is being
allowed to flow into natural drainage
without being mixed with waste water
generated from construction camp.
2.11 How is the storm water
from within the site
managed?
(State the provisions made
to avoid flooding of the
area, details of the
drainage facilities
provided along with a site
layout indication contour
levels)
Storm water drainage network shall be
incorporated in the project planning. The
storm water shall be channelized to 57 no
of RWH pits to recharge the ground water.
Thus flooding on the proposed site is not
envisaged
2.12 Will the deployment of
construction labourers
particularly in the peak
period lead to unsanitary
conditions around the
project site (Justify with
proper explanation)
Proper sanitary facilities like common bath
place, mobile toilets etc. has been provided
to labours.
2.13 What on-site facilities are
provided for the
collection, treatment &
safe disposal of sewage?
(Give details of the
quantities of wastewater
generation, treatment
capacities with technology
& facilities for recycling
and disposal)
Waste water during construction phase
from labours is being discharged into septic
tanks followed by soak pit.
During operation phase2410 KLD of waste
water will be treated in the proposed S.T.P.
of 3000 KLD capacity based on FAB
technology. 1630 KLD of the treated water
shall be reused for flushing, gardening &
misc. purposes. Excess treated water of 539
KLD shall be given to tanker water supplier.
2.14 Give details of dual
plumbing system if treated
waste used is used for
flushing of toilets or any
other use.
Dual Plumbing line shall be provided in the
complex for reuse of treated water.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 32
3. VEGETATION
3.1 Is there any threat of the
project to the biodiversity?
(Give a description of the
local ecosystem with its
unique features, if any)
Some shrubs are located in the project site.
The same has been cleared before the
starting of the construction. Hence no
threat to bio-diversity is envisaged.
3.2 Will the construction
involve extensive clearing
or modification of
vegetation?
(Provide a detailed
account of the trees &
vegetation affected by the
project)
No vegetation exists at site except few
bushes and grasses which has been cleared
before the starting of construction.
3.3 What are the measures
proposed to be taken to
minimize the likely
impacts on important site
features
(Give details of proposal
for tree plantation,
landscaping, creation of
water bodies etc along
with a layout plan to an
appropriate scale)
The green belt for the proposed project is
planned to provide a clean, healthy and
beautiful green environment.
4. FAUNA
4.1 Is there likely to be any
displacement of fauna-
both terrestrial and
aquatic or creation of
barriers for their
movement? Provide the
details.
No faunal species exists at site
4.2 Any direct or indirect
impacts on the avifauna of
the area? Provide details.
Within the proposed project site, proper
landscaping shall be done planned. It can have
direct positive impact on the local avifauna as
this is being provide shelter to local birds.
4.3 Prescribe measures such
as corridors, fish ladders
etc. to mitigate adverse
impacts on fauna.
Not applicable
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 33
5. AIR ENVIRONMENT
5.1 Will the project increase
atmospheric concentration of
gases & result in heat islands?
(Give details of background
air quality levels with
predicted values based on
dispersion models taking into
account the increased traffic
generation as a result of the
proposed constructions)
The traffic shall be increase during
operational phase. Increased traffic
generation of vehicles due to project not
cause increase in atmospheric concentration
of gases and do not result in heat island
formation.
5.2 What are the impacts on
generation of dust, smoke,
odorous fumes or other
hazardous gases? Give details
in relation to all the
meteorological parameters.
Dust is being generated at site during
construction and operational phase. Smoke
is being generated from operation of DG
sets. Proper emission standards being
maintained as per CPCB guidelines.
5.3 Will the proposal create
shortage of parking space for
vehicles? Furnish details of
the present level of transport
infrastructure and measures
proposed for improvement
including the traffic
management at the entry &
exit to the project site.
The optimum parking provision is being
proposed. Hence there being no shortage of
parking space for vehicles. Total parking
provision is 7800 ECS.
5.4 Provide details of the
movement patterns with
internal roads, bicycle tracks,
pedestrian pathways,
footpaths etc., with areas
under each category.
Within the project site carriageway of 12m
width shall be provided.
Adequate capacity of parking shall be
provided.
5.5 Will there be significant
increase in traffic noise &
vibrations? Give details of the
sources and the measures
proposed for mitigation of the
above.
During construction, noise barriers have
been installed to reduce traffic noise &
vibrations and during operation green belt
developed within the residential colony will
mitigate the traffic noise. Proper care has
been taken during design that there will not
be any increase in traffic noise by providing
two-way traffic movement, hence no
conjunction will cause, and hence, no
honking within the colony will be
maintained.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 34
AESTHETICS
6.1 Will the proposed
constructions in any way
result in the obstruction of a
view, scenic amenity or
landscapes?
Are these considerations
taken into account by the
proponents?
No, the proposed construction in any way
does not result in the obstruction of view,
scenic amenity.
Yes all considerations has been taken.
6.2 Will there be any adverse
impacts from new
constructions on the existing
structures? What are the
considerations taken into
account?
The construction of this project is being as
per approved building plan and master plan
of Gurgaon. Hence no adverse impact is
anticipated.
The foundation is being made very hard and
paved with rubber flooring to minimize the
vibration, also all other measures have been
adopted during designing that there will not
be any causes of vibrations during the traffic
density. No honking within the colony will
be maintained.
5.6 What will be the impact of DG
sets & other equipment on
noise levels & vibration in &
ambient air quality around
the project site? Provide
details.
There would be slight impact of D.G. Sets on
noise levels, vibration and in ambient air
quality around the project site.
1. All the D.G. Sets of the proposed project
would be bought acoustically enclosed in a
room on surface.
2. Stack height as per C.P.C.B. norms to
reduce the impacts on air quality around the
project site will be provided
3. The noise from D.G. Sets will meet the
desired standard as per C.PC.B guidelines.
Low Sulphur fuel will be used to run these
D.G. Sets.
4. Vibration pads will be used in DG sets to
minimize the vibration effect.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 35
6.3 Whether there are any local
considerations of urban form
& urban design influencing
the design criteria? They may
be explicitly spelt out.
Are there any anthropological
or archaeological sites or
artifacts nearby?
State if any other significant
features in the vicinity of the
proposed site have been
considered.
None
No, there is no anthropological or
archaeological site or artefacts in the site
and in the close/ nearby proximity of the
site.
All significant features has been considered.
7. SOCIO-ECONOMIC ASPECTS
7.1 Will the proposal result in any
changes to the demographic
structure of local population?
Provide the details.
There will be influx of peoples in the form
of residents. Staff & staff in the proposed
IT/ITES SEZ. Thus there will be change the
demographic structure of of the area.
7.2 Give details of the existing
social infrastructure around
the proposed project.
Hospital
EktaHospital
Upkar Hospital near
Police Station,
Badshahpur
Masonic Polyclinic
Dharam Hospital
Post Office
Post Office Sohna-
Gurgaon
Rd .Badshahpur
Post office Maharaja
Aggarsain Rd.
BaludaSohna
Post Office Sector-56
6.77 Km N
7.37 Km N
8.04 Km NE
7.36 Km NW
8.71 Km S
11.45 Km NE
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 36
Places of worship
Dadi satti temple
Hanuman Mandi
rGarhi Bazidpur
Baba Baladas Temple
School
Govt. Senior
Secondary School
JK Padampat
Singhania Institute of
Management
&TecHnology
JK Education
Foundation
Bank
State Bank of India,
Sector-66
Gurgaon Gramin
Bank
ICICI Bank Branch &
ATM
1.25 Km NW
4.05 Km SE
5.52 Km E
2.68 Km N
2.93 KM NE
2.31 Km NE
7.87Km N
3.02Km N
7.80 KM N
7.3 Will the project cause adverse
effects on local communities,
disturbance to sacred sites or
other cultural values? What
are the safeguards proposed?
No sacred site or other cultural value site
exists in the site. Hence no adverse impact is
being envisaged. The construction is being
done as per the building by laws of govt.
authority.
8. BUILDING MATERIALS
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 37
8.1 May involve the use of
building materials with high-
embodied energy.
Are the construction materials
produced with energy
efficient processes?
(Give details of energy
conservation measures in the
selection of building materials
and their energy efficiency
The major materials required for
construction of the project are steel,
cement, bricks, flooring tiles / stones,
sanitary and hardware items, electrical
fittings, water, etc.
Energy efficient Building material is being
used.
Details of Energy Conservation measures
given in EMP.
8.2 Transport and handling of
materials during construction
may result in pollution, noise
& public nuisance.
What measures are taken to
minimize the impacts?
Yes, transportation and handling of
material results in pollution, noise however
it is being minimized by covering material
by the tarpaulin and water sprinkling shall
be done at the location where dust
generation is anticipated. PUC certificate of
vehicles and good condition silencers.
8.3 Are recycled materials used in
roads and structures?
State the extent of savings
achieved?
Not applicable.
8.4 Give details of the methods of
collection, segregation &
disposal of the garbage
generated during the
operation phases of the
project.
This solid waste shall be disposed off as per
municipal solid waste management and
handling norms. Details given in EMP.
9. ENERGY CONSERVATION
9.1 Give details of the power
requirements, source of
supply, backup source
etc.
What is the energy
consumption assumed
per square foot of built-
up area?
How have you tried to
minimize energy
consumption?
Power Requirement – 47MVA
Source of Power: DHBVN.
Back-up Source:
Power back up has been proposed by using D.G.
Sets of 36x1.5MVA.
Fuel: Low sulphur Diesel
DG sets shall be kept in acoustically treated
room..
Appropriate energy conservation measures &
management plan is being adopted in order to
minimize the consumptions of non-renewable
fuel. Details given in EMP.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 38
9.2 What type of and
capacity of power back-
up do you plan to
provide?
DG Sets: 36×1.5MVA
Fuel: Low sulphur Diesel
D.G sets shall be installed to provide power
backup during power failures
9.3 What are the
characteristics of the
glass you plan to use?
Provide specifications of
its characteristics
related to both short
wave and long wave
radiation?
Glass plain open able often shall be used for
residential units & double reflective glass shall be
used for IT offices & commercial area
9.4 What passive solar
architectural features
are being used in the
building?
Illustrate the
applications made in the
proposed project.
Building design and envelope is being optimized
through selection of appropriate wall and roof
construction and through adoption of solar
measures.
9.5 Does the layout of streets
& buildings maximize
the potential for solar
energy devices?
Have you considered the
use of street lighting,
emergency lighting and
solar hot water systems
for use in the building?
Substantiate with
details.
Yes, the layout of building is being designed to
maximize the potential for use of solar lighting
per day devices.
9.6. Is shading effectively
used to reduce
cooling/heating loads?
What principles have
been used to maximize
the shading of Walls on
the East and the West
and the Roof? How
much energy saving has
been effected?
Solar Measures shall be adopted to provide
shading devices for windows and roof which
would effectively reduce heating up of building
envelope. Louvers and sunshades shall be used
around windows in order to protect from direct
sunlight.
Roofs shall be painted with reflective paints with
solar reflectance ranging from 0.3-0.89. This
result in less absorption of sunlight causing 40 %
back reflection and less heating of building
structure during summer season. This shall
effectively reduce the heat load of the building
envelope.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 39
9.7 Do the structures use
energy-efficient space
conditioning, lighting
and mechanical
systems? Provide
technical details.
Provide details of the
transformers and motor
efficiencies, lighting
intensity and air-
conditioning load
assumptions?
Are you using CFC and
HCFC free chillers?
Provide specifications
Maximum utilization of natural light. CFL used in
basement and common areas. Use of solar lights
partly in open areas and landscaped area. Energy
efficient HVAC system to maintain indoor air
quality. Appropriate thermal insulation in walls
and roofs to reduce heat gain and loss. External
glazing shall be below 40% of the total vertical
surface as per ECBC. U value of roofs and walls
as per ECBC.
9.8 What are the likely
effects of the building
activity in altering the
micro-climates?
Provide a self-
assessment on the likely
impacts of the proposed
construction on creation
of heat island &
inversion effects?
No significant effect is being envisaged on the
surrounding environment of project. Increased
traffic generation and use of D.G. Sets in the
project site will not cause any significant increase
in atmospheric concentration of gases and will
not result in heat island formation
9.9 What are the thermal
characteristics of the
building envelope? (a)
roof; (b) external walls;
and (c) fenestration?
Give details of the
material used and the U-
values or the R values of
the individual
components.
S.
No
BUILDING
MATERIAL
PROPOSED
WITH U &
R VALUES
‘R’
Values
(in Sq
m.
Deg
C/
Watts
)
‘U’
Values
(in
Watts/
Sq m.
Deg C)
Solar
Heat
Gain
Factor
1. Wall
Brick & ACC
Blocks wall
(230 mm
thick), both
side thick
sand
cement
plaster (12-
18mm)
with
insulation.
2.28 0.44 0.001
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 40
2. Roof
200 mm
RCC slab
with mud
phuska &
clay tiles
with 75 mm
insulation.
2.04 0.49 0.01
3. Glass
(double
reflective
glass)
0.30 3.3 0.11
9.10 What precautions &
safety measures are
proposed against fire
hazards? Furnish details
of emergency plans.
Fire pump, Jockey Pump, Water from the reserve
tank shall be drawn by electrically driven pump.
Fire Fighting System:
Various type of fire fighting measures proposed
in the project are as follow:
● Automatic sprinkler system
● Dry rising main and hose reel
● Private hydrants
● Automatic fire detection and alarm system
● Portable fire extinguisher
● Wet chemical extinguishing system
Emergency lighting:
The emergency lights operated on battery power
is being provided at appropriate locations such as
corridors, common area, staircase, exit and
entrance door parking etc.
Fire safety:
● The electrical systems is being provided with
automatic circuit breakers activated by the rise of
current as well as activated by over current.
● Fire detection systems
● Fire alarm system at appropriate places
● Means of escape
● Access for fireman
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 41
9.11 If you are using glass as
wall material provides
details and
specifications including
emissive and thermal
characteristics.
Glass plain open able often shall be be used for
residential units & double reflective glass shall be
used for IT offices & commercial area.
9.12 What is the rate of air
infiltration into the
building?
Provide details of how
you are mitigating the
effects of infiltration.
All the window and door will be airtight quality, hence
we don’t foresee any air infiltration
9.13 To what extent the non-
conventional energy
technologies are utilized
in the overall energy
consumption?
Provide details of the
renewable energy
technologies used.
Solar energy shall be used for external lighting.
Solar water heater shall be provided in residential
units.
10. ENVIRONMENT MANAGEMENT PLAN
10.1 The Environment Management Plan
would consist of all mitigation measures
for each item wise activity to be
undertaken during the construction,
operation and the entire life cycle to
minimize adverse environmental impacts
as a result of the activities of the project.
It would also delineate the environmental
monitoring plan for compliance of
various environmental regulations. It will
state the steps to be taken in case of
emergency such as accidents at the site
including fire.
Environment Management Plan
is given in Environment Report
attached as ENCLOSURE -3
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 42
CONCEPTUAL PLAN
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 43
CONCEPTUAL PLAN
Introduction The proposed” IT/ITES SEZ” is located at Sohna Road, Gurgaon, Haryana. The project
is being developed by M/s Dr. Fresh health care pvt. Ltd. The Activity proposed in the
complex are Residential Houses, Commercial, IT space and club Houses. The project
has already been granted EC vide letter no SEIAA/HR/09/1356 dated 6-01-2010.
The construction is under process.
Activities/ Amenities Residential Houses
Commercial
IT space
Club houses
Site Location The project site is located at Sohna Road, Gurgaon, Haryana. The location of site is
given in Environment Report.
Type of Project The project “IT/ITES SEZ” is proposed to be develop at a Total plot area of 2,34,270
sq m (57.88 acre) and net plot area 2,20,393 sq m (54.46 acre). The built up area of
the project is 633763.5005 sq m. Hence, it falls under category 8 (b) of EIA
notification, 2006.
Project Details
The total plot area of the project is 2,34,270 sqm (57.88 acre) & the net plot area of
the project is 2,20,393 sq m (54.46 acres).40,712.05 sq m shall be utilized as ground
coverage. The FAR achieved will be 90565.69 sq m for which bifurcation is given in
Table 1. Single level basement 0f 809.60 sq m is proposed for the project. The total
Non FAR area (Stilt Area) will be 6470.82 sq m. The built up area of the project will
be 633763.5005sq m. Total 20 number of towers are proposed and maximum no. of
floors will be S+14. Total cost of project is Rs. 1200 cr.
Project details are given in Table 1.
Table 1: Project Details
S.N
o.
Description Total Details
1. Total Plot Area(sqm ) 2,34,270 sqm (57.88 acre)
2. Deductions 13,877 sq m
3. Net Plot Area 2,20,393 sq m (54.46 acres)
4. Ground coverage (Permissible) 89,844.99 sq m
5. Total Ground Coverage Achieved 40,712.05 sq m
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 44
6. Total FAR (Permissible) 4,61,152.44 sq m
7. Total FAR (Achieved) (i) 4,10,299.3278 sq m
8. Non FAR Area (Stilt Area) (ii)
9. Total Basement Area (iii) 223464.1727 sq m
10. Basement level 3 level
11. Built up area (i+ii+iii) 633763.468 sq m
12. Green Area 77,137.76 sq m (35%)
13. No. of floors
It space
Residential plots
Commercial
Club houses
G+10
G+18
G+5
G+5
14. No. of Tower/Block 20
15. Max Height of building
It space
Residential plots
Commercial
Club houses
50 m
60 m
30 m
30 m
Population Details During Construction Phase- 200-250 Nos. of local labours is being employed for the
construction of the IT/ITES EZ.
During Operation Phase- the total population of the project has been estimated to be
49,300 persons.
The population details are given in Table 2.
Table 2: Estimation of Population
Type Population
Residential 7,500
Staff 38,000
Visitors 3,800
TOTAL 49,300
Water Management Water Requirement
During construction phase, treated water is being arranged on temporary basis
through the tankers.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 45
During operation phase, water requirement shall be met primarily through municipal
water supply of HUDA. Fresh water requirement will be 1899 KLD.
The total water management has been given in Environment Report.
Rain water collection Details Total 57 nos. of Rain Water Harvesting pits shall be provided in the project site to
recharge the ground. Details are given in Environment Report.
Power Requirement& Back-up During Construction Phase- DG sets of 62.5 kVA is being used for construction works.
During Operation Phase- The total power requirement of the project shall be 47 MVA
which is met by Dakshin Haryana Bijli Veteran Nigam Ltd. (DHBVN). In case of power
failure, power backup is being provided through DG sets. 36×1.5 MVA shall be
provided shall be located on the surface.
Solid & Hazardous Waste Management During Construction Phase- Approx. 94748cu m of soil is being excavated due to
excavation of basement & foundation. Total 37.5 kg/day of waste is being generated
from labourers.
During operation phase- Total 9,645 kg/day solid waste shall be generated from the
project.
432 ltr/Month used oil shall be generated and 2 kg/month E-waste shall be
generated.
Parking Management During construction phase- Proper parking provisions of trucks and other
construction vehicles is being made. Proper spaces for loading and unloading is being
defined.
During operation phase- Total parking requirement is being 7752 ECS. However,
7800 ECS is being provided.
Green Area Development The site is a vacant land. Development of Group Housing includes development of a
plantation area including big foliage trees and beautiful vegetation, herbs, shrubs that
is being maintained at site. Total plantation area for the project is being approx.
77,137.76 sq m which is 35 % area of the net plot area.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 46
ENVIRONMENT
REPORT
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 47
ENVIRONMENT REPORT
IT/ITES SEZ
At Village- Ghamroj, Sohna Road
Gurgaon, Haryana
Developed by DR. Fresh Health Care Pvt. Ltd.
Village-Ghamroj. Tehsil-Sohna,
Gurgaon Sohna Road, Gurgaon, Haryana-122102
Prepared By: M/S PERFACT ENVIRO SOLUTIONS PVT. LTD
(NABET Registered wide list of accredited consultants organizations/ Rev 30/ 7th May, 2015 at S.No-116)
NN Mall, Sector-3, Rohini, New-Delhi-85 Phone: 011-47528467; 011-47021086
Fax: - 011-475284
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 48
EXECUTIVE SUMMARY OF THE PROJECT
3.1.1 Activities:
The project is “IT/ITES SEZ “which is include IT space, Residential plots, commercial
space and clubs.
Project details are given in Table 3.
Table 3: Project Details
Sl.
No Description Details
1. Proposed Project “IT/ITES SEZ”
2. Project Proponent M/s Dr. Fresh Health Care Pvt. Ltd.
3. Sr. No of Schedule
(as per Notification 2006) 8 (b)
4. Project Location Village- Ghamroj at Sohna Road
5. Total Plot Area 2,34,270 sqm (57.88 acre)
6. Deducted Area 13,877 sq m
7. Total Net Plot Area 2,20,393 sq m (54.46 acres)
8. Existing Capacity/ Area etc. Build Up Constructed : 68,527.943 sq m
Ground coverage
(Permissible)
89,844.99 sq m
Total Ground Coverage
Achieved
40,712.05 sq m
Total FAR (Permissible) 4,61,152.44 sq m
Total FAR (Achieved) (i) 4,10,299.3278 sq m
Total Non F.A.R (Stilt Area)
(ii)
Total Basement area (iii) 2,23,464.1727 sq m
9. Total Built up Area (i+ii+iii) 6,33,763.468 sq m
10. Green Area 77,137.76 sq m (35%)
11. Road & Open area 102543.79 sq m
12.
No. of Floors
It space
Residential Houses
Commercial
Club houses
G+10
G+18
G+5
G+5
13. No. of towers/block 20
14. No. of Basement 3
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 49
15. Maximum height of building 60m
16. No. of D.U 1364
17. No. of EWS 136
18. Water Requirement (KLD) 3,529 KLD
19. Source of Water Primary source: Municipal water supply of
HUDA.
20. Power Requirement (KVA) 47 MVA
21. Source of Power DHBVN
22. DG Backup 36×1.5MVA
23. No. of Rain water harvesting
pits
57
24. Parking Required 7752 ECS
25. Parking Provision 7800 ECS
Processing Area (under construction):1,16,429 sq m
Area Already constructed Proposed Area Subtotal
G.C (Per) 58214.51265 sq m
G.C (Ach) 30992 sq m
F.A.R (Per) 279215 sq m
F.A.E (Ach.) 44,840.85 sq m 2,34,373.15 sq m 279215 sq m
Basement 1,04,860.353 sq m 1,39,305.655 sq m 1,62,992.748 sq m
Built up 68,527.943 sq m 3,73,679.805 sq m 4,42,207.748 sq m
Non- Processing Area: 1,03,864.6041 sq m (Proposed area )
Area Residential
housing
Commercial Club houses
G.C (Per) 29,866.0482
sq m
1133.123 sq
m
631.31484 sq m
G.C (Ach) 7,960 sq m 1130 sq m 629.913352 sq m
F.A.R (Per) 174218.6145
sq m
4957.44025
sq m
2762.002425 sq m
F.A.E
(Ach.)
124998.38 sq
m
4956 sq m 1130 sq m
Basement 48626 sq m 11845.0447
sq m
0
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 50
Built up 173624.68 sq
m
16801.04 sq
m
1130 sq m
INTRODUCTION OF THE BACKGROUND INFORMATION
3.2.1 Brief Description of the Nature of the Project:
The proposed project is development of “IT/ITES SEZ”. The project is being developed
at Sohna Road, Gurgaon, Haryana.
PROJECT DESCRIPTION
3.3.1 Land Use and Ownership of the site land The land is purchased by “Dr. Fresh Health Care Pvt. Ltd.” from the owners of land.
The land use proposed at the site is given in Table 4 & Figure 2.
Table 4: Land use of the project Site
Land Use Area Percentage
Ground Coverage 40712.05 sq m 18.5 %
Green Area 77137.76 sq m 35 %
Road & Open area 102543.79 sq m 46.5 %
Total 220393.6sq m 100%
3.3.2 Location of the project with connectivity Details of connectivity are shown in Table 1.
Percentage
Ground coverage 40712.05 Green AREA 77137.76 Road and open area 102543.79
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 51
Table 5- Site Connectivity
S.No. Accessibility Description Distance & Direction
1. Highway/ Road NH-71B
NH-08
State Highway 13
8.93 km S
11.27 Km NW
0.20 km E
2. Railway Station Basai Dhankot Railway Station
17.38 Km NW
3. Airport Indira Gandhi International Airport
25.84 Km NE
3.3.2.1 Geographical Information of Site
Latitude Longitude
28˚19’30.06” N 77˚3’54.92” E
3.3.2.2 Location Map
Location map is shown in Figure 1.
Figure 1: Location Map
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 52
3.3.2.3 Topographical Map
Topographical map is shown in Figure 2.
Figure 2 : Topographical Map
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 53
3.3.2.4 Layout Plan
The layout plan is given in figure 3.
Figure 3: Layout Plan
3.3.2.5 Site Photographs
The site photograph of the project is given below:
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 54
Resources
3.4.1 Water Resource Management
3.4.1.1 Water Requirement
During construction phase, treated water is being arranged on temporary basis
through the tankers.
During operation phase, water requirement shall met through municipal water
supply of HUDA.
The total water requirement has been shown in the Table 6
Table 6: Water Requirement
particulars
Population
Factor in LPCD
TOTAL requirement (KLD)
Domestic in KL
Flushing in KL
Waste Water(KLD)
Domestic Resident 7500 135 1012.5 709 304 Staff 38000 45 1710 1173 537 Visitors 3800 15 57 17 40 Total 49300 2780
1899 881
Waste Water Discharge
1497 881 2378
Gardening 442 0 cooling 282 28 Water body
20 2
Misc 5 2 Total 3529 2410
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 55
Water Balance
3.4.1.2 Source of Water
The water is being resourced through supply water of HSIIDC.
3.4.1.3 Disposal
Total quantity of wastewater generation will be 2410 KLD. The generated sewage
shall be treated in Sewage Treatment Plant capacity 3000 KLD. The treated water is
being utilized to the extent possible & the rest 539 KLD excess treated water shall be
given to tanker supplier.
3.4.2 Energy Resource Management
3.4.2.1 During Construction
DG sets of 62.5 KVA is being used for Power supply during the construction phase.
Total Water Requirement 3529 KLD
Fresh Water 1899 KLD
Treated Water 1630 KLD
Flushing Water 881 KLD
Cooling 5 KLD
Waste Water 1497 KLD Waste Water
881 KLD Waste Water
2 KLD
Total waste water 2410 KLD
STP Capacity 3000 KLD
Treated Water 2169
KLD Tanker water supplies for construction purpose.
Gardening 442 KLD
Waste Water NIL
Domestic Water 1899 KLD
Misc. Water Body 20 KLD 282 KLD
Waste Water Waste Water 28 KLD 20 KLD
539 KLD
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 56
3.4.2.2 During Operation
During operation phase 47 MVA of electric load from Dakshin Haryana Vidyut
prasaran Nigam ltd is supplied to the complex. Power backup shall be provided by
DG set of 36×1.5 MVA.
3.4.2.3 Power load
Area Power Load
Processing Zone (IT Space 33 MVA
Non Processing Zone (Residential plots ,
commercial space, club houses)
14 MVA
3.4.2.4 Conservation
Maximum utilization of natural light. CFL shall be used in basement and common
areas. Use of solar lights partly in open areas and landscaped area shall be done.
Energy efficient HVAC system shall maintain indoor air quality. Appropriate
thermal insulation in walls and roofs to reduce heat gain and loss. External glazing
is being below 40% of the total vertical surface as per ECBC. U&R value of roofs and
walls shall beas per ECBC.
SITE ANALYSIS
3.5.1 Eco-sensitive areas with distance from project location The eco sensitive zones with distance from the project location are given in Table 7:
Table 7: Eco sensitive sites around the project site
S.
No.
Areas Name/ Identity
Aerial distance (within 15 km) from Proposed project location boundary
1 Areas protected under
international conventions,
national or local legislation for
their ecological, landscape,
cultural or other related value
None None
2 Areas which are important or
sensitive for ecological reasons -
Wetlands, watercourses or
other water bodies, coastal
zone, biospheres, mountains,
forests
Water bodies
Mehandwari Nadi
Damdama Lake
Gurgaon Canal
4.82 Km SE
6.55 Km EES
12.31 Km SE
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 57
3 Areas used by protected,
important or sensitive species
of flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration
None
3.5.2 Social Infrastructure available
The social infrastructure available at site is given in Table 8:
Table 8: Social Infrastructure near the project site
Areas occupied by sensitive
man-made land uses
(hospitals, schools
, places of worship, community
facilities)
Hospital
EktaHospital
Upkar Hospital near Police
Station, Badshahpur
School
Govt. Senior Secondary
School
JK Padampat Singhania
Institute of Management
&Technology
JK Education Foundation
Banks
State Bank of India, Sector-
66
Gurgaon Gramin Bank
ICICI Bank Branch & ATM
Places of worship
Dadi Satti Temple
Hanuma Mandir Garhi
Bazidpur
Baba Baladas Temple
6.77 Km N
7.37 Km N
2.68 Km N
2.93 KM NE
2.31 Km NE
7.87 Km N
3.02 Km N
7.80 KM N
3.25 Km NW
4.05 Km SE
5.52 Km E
PROPOSED INFRASTRUCTURE
3.6.1 Types of Buildings & Activities Proposed
The proposed project is “IT/ITES SEZ”.
The Activities includes IT space, residential Houses, commercial space and club
houses.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 58
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) is a site specific plan developed to ensure
that the project is implemented in an environmentally sustainable manner where all
stakeholders including the project proponents, contractors and subcontractors,
including consultants, understand the potential environmental risks arising from the
proposed project and take appropriate actions to properly manage that risk. Adequate
environmental management measures need to be incorporated during the entire
planning, construction and operating stages of the project to minimize any adverse
environmental impact and assure sustainable development of the area.
The EMP presented below is being followed and regular monitoring of relevant
parameters as stated in post project-monitoring schedule shall be carried out. The EMP
is to be proactive in nature and is being upgraded if new facilities or modification of
existing facilities, with environmental concerns, come up at a later stage.
EMP includes four elements:
Commitment and Policy: Proposed project is being strive to provide and
implement the Environmental Management Plan that incorporates all issues
related to air, land and water.
Planning: This includes identification of environmental impacts, legal
requirements and setting environmental objectives.
Implementation: This comprises of resources available to the developers,
accountability of contractors, training of operational staff associated with
environmental control facilities and documentation of measures to be taken.
● Measurement and Evaluation: This includes monitoring, corrective actions,
and record keeping.
3.7.1 ENVIRONMENT MANAGEMENT DURING CONSTRUCTION
3.7.1.1 AIR ENVIRONMENT :-
Air quality around the project is being adversely impacted during the construction
stage. Various construction activities especially related to lose material likely to cause
generation of dust that adversely impacts the air quality of the surrounding area of
the project site. To minimize such impact, following measures is being taken:
All the loose material either stacked or transported is being provided with suitable
covering such as tarpaulin, etc. and kept in and specific place.
Water sprinkling is done at the location where dust generation is anticipated.
To minimize the occupational health hazard, proper mask is being provided to the
workers who are engaged in dust generation activity.
DG sets of capacity 62.5 KVA is being installed acoustically enclosed with
adequate stack height above roof level of DG sets.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 59
The proposed project is being involve construction activities; which is obviously
results in fugitive dusts. These fugitive dusts is being controlled by carrying out
construction after covering the boundary of the proposed project site by polythene
cover to a particular height and also by intermittent spraying of water.
3.7.1.2 WATER MANAGEMENT:-
During the construction of the proposed project, the services required like water
supply and sewage facilities is being arranged on a temporary basis and the same is
being maintained without any adverse impact on the environment. Following are the
measures required to manage the water environment at site:
The water required during construction phase is being taken from STP treated
water of nearby area/ STP supplied through Tankers.
Mobile toilets for construction labours is being provided.
The waste water is being reused and remaining is being discharge to sewer.
Runoff from the construction is not being allowed to stand (water logging) or
enter into the roadside or nearby drain. Adequate measures is being taken to
collect such run off and either are reused or disposed off at the designated
construction waste disposal location. Waste water shall be supplied to tankers.
3.7.1.3 NOISE ENVIRONMENT:-
During the construction stage, expected noise levels is being in the range of 85-90
dB(A), which is being decrease with increase in distance. Hence all the construction
activities is being carried out during the daytime.
Due to the construction activities undertaken for the project, there is some noise
generation due to the movement of vehicles carrying construction materials and as
this is being only a temporary phenomenon, it is being managed by properly
regulating the movement of vehicular traffic so that the ambient noise quality is not
being adversely affected.
To prevent any occupational hazard, ear muff / ear plug is being given to the workers
working around or operating the plant and machinery emitting high noise levels.
Operation of such plant or machinery is being strictly prohibited during night hours.
Careful planning of machinery operation and scheduling of operations is being taken
to minimize such impact. Furthermore, following measures is being also be adopted:
All the machinery and equipments is being regularly maintained to reduce the
noise level.
DG sets is being installed acoustically enclosed.
Noise barriers is being installed to reduce traffic noise & vibrations.
Plantation is being developed along the periphery of the site.
3.7.1.4 SOLID WASTE MANAGEMENT:-
During the construction, approx. 94748cu m of soil is being excavated to provide the
basement and foundation. This excavated soil is being properly stacked under
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 60
tarpaulin cover and is being reused for back filling purpose and road construction,
etc. The top soil is being preserved separately and is being used for landscaping
purposes only. The unused soil is being sent to landfill site only identified be
Municipal corporation
Appropriate 37.5 kg/day of Municipal solid waste sis being generated from
temporary labours which is being disposed off at Municipal Landfill site.
Used oil whenever generated from the DG sets is being kept in a secured place and in
leak prof container and is being sent to approved recycler
3.7.2 ENVIRONMENT MANAGEMENT DURING OPERATION
Table 9: Population
3.7.2.1 AIR ENVIRONMENT
DG sets of 36× 1.5 MVA shall be installed as power backup for emergency use during
power failure. Proper stack height of 6 m above roof level shall be maintained which
help in reducing the air pollution.
Table 10: DG set & stack Height
3.7.2.2 WATER MANAGEMENT
Total water requirement estimated to be 3529 KLD for the proposed project and is
being met by public water supply. Water shall be used mainly for domestic, flushing,
gardening, cooling & Misc. purposes. Total quantity of wastewater generation shall
be 2410 KLD for the proposed project. The generated sewage shall be treated in
Sewage Treatment Plant capacity 3000 KLD based on FAB technology. The treated
water 2169 KLD shall be generated from STP, out of which 1630 KLD will be reused
for flushing, gardening & misc. purposes and 539 KLD shall be given to tanker water
supplies for construction purposes.
S.no. Category Population (No.)
1. Residential 7500
2. staff 38000
3. visitors 3800
Total population 49300
D. G. Set. Capacity No Stack Height
1.5 MVA 36 6 meters above roof level
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 61
3.7.2.2.1 WASTEWATER TREATMENT
In the complex, the generation of waste water is being about 2410 KLD. The generated
sewage is being treated in Sewage Treatment Plant capacity 3000 KLD. The STP is
being based on Fluidized Aerobic Bed Reactor (FAB) process.
Table 11: RAW SEWAGE CHARACTERISTICS
The Sewage Treatment Plant (STP) give treated water, which is reused for Flushing,
Gardening & Misc. purposes.
Table 12: TREATED SEWAGE CHARACTERISTICS
pH - 6.5 – 7.5 mg/l
BOD mg / l < 20 mg/l
COD mg / l < 5 mg/l
TSS mg / l < 20 mg/l
Oil & Grease mg / l < 10 mg/l
Following description gives the salient features of the STP:
1. Small space requirement
The concept of compact sewage treatment plant is promoted so that expensive
conventional treatment is dispensed herewith. The treatment scheme is also versatile,
in the sense that units can be re-arranged in any way in which the space and pile caps
are available.
2. Lower operating power requirements
The system utilizes aeration tanks of much smaller size, thereby reducing the overall
power required in aerating the raw sewage. Since the bio-reactor depth is more,
efficient transfer of oxygen takes place, thereby reducing the overall power consumed
in treatment.
3. Simplicity in operation and maintenance
The system adopted has much less moving parts (only pumps and blowers). Further
there is no moving part inside the bio-reactor. This gives the advantage of
continuously running the bio-reactor system, under widely fluctuating conditions. All
the maintenance on the mechanical systems can be done with normal skilled
mechanics available.
Flow M3 / day 1022 KLD
pH - 6. 5 to 8.5
BOD mg / l 150 to 300 mg/l
COD mg / l 400 to 600 mg/l
TSS mg / l 300 to 450 mg/l
Oil & Grease mg / l 50 mg/l
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 62
The system is unique in operation, such that, only inlet and outlet parameters (i.e. raw
sewage BOD / COD / TSS /TP and treated sewage BOD / COD / TSS / TP etc.) need
to be analysed. Since the bio-reactor is self-sustaining, there is no requirement of
recycling the biomass from the secondary clarifier. Hence, analysis such as MLSS /
MLVSS / SVI (sludge volume index) / F / M ratio etc. is not required to be done. This
greatly reduces the analytical load on the plant chemist / supervisor, and makes the
system very simple to operate and control.
4. Removal of Nutrients & coliform
The bio-reactor system adopted in the FAB based STP is provided with nutrients
removal, and removal of disease causing E-coli bacteria.
Nutrient removal
The bio-reactor system operates at very food to micro-organisms ratio (F / M ratio).
This helps in totally converting the Ammonical nitrogen to nitrate nitrogen. In the
process of synthesis of organic substrate, about 40 – 50% of the total phosphates load
is also reduced. The remaining phosphates can be precipitated by addition of
aluminum ions dosed in form of Poly Aluminum Chloride (PAC). Phosphates react
with aluminum ions and precipitate as aluminum phosphate, which is an insoluble
salt. Thus the total phosphates load easily reduced by more than 90%.
Coliform removal
The outlet BOD of the bio-reactor system being very low (in other words, hardly any
food is available to the E-coli), most of the coliform are killed in the reactor itself. The
treated sewage outlet coliform count is being conform to WHO standards.
5. Sludge handling
The sludge generated in the bio-reactors is totally digested. Since the F / M ratio in
the bio-reactors is very low, the excess sludge generation is lower than compared to
the conventional ASP system. Normally, this sludge is anaerobically digested to
stabilize the organic matter. The present system does not envisage any sludge
digestion (since the sludge is aerobically stabilized in the bioreactors itself), making
the system more suitable for operation with less manpower.
The excess sludge is separated in the secondary clarifier, and then disposed off either
on drying beds, or can be directly used as soil conditioner.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 63
3.7.2.2.2 HYDRAULIC FLOW DIAGRAM OF SEWAGE TREATMENT PLANT:
3.7.2.2.3 TREATMENT PROCESS
The sewage is first passed through a Bar Screen Chamber & an Oil & Grease Chamber
where any extraneous / floating matter gets trapped.
The sewage is then collected in a Receiving Sump where the variations in flow and
characteristics are dampened, which otherwise can lead to operational problems and
moreover it allows a constant flow rate downstream. Here the sewage is kept in mixed
condition by means of coarse air bubble diffusion.
The equalized sewage is then pumped to the Fluidized Aerobic Bed Reactors (FAB)
where BOD/COD reduction is achieved by virtue of aerobic microbial activities. The
FAB reactors run in series. The oxygen required is supplied through coarse air bubble
diffusers.
The excess bio-solids formed in the biological process, which are separated in the
downstream Plate Settler Tank. The clear supernatant is sent to the tertiary treatment
section comprising of a Dual Media Filter and an Activated Carbon Filter, and UV
disinfections system. If needed Softener is being provided.
The biological sludge generated from the FAB, which is settled in the Plate Settler, is
drained through the Filter Press.
3.7.2.3 Rain Water Harvesting
The main source of ground water recharging in the study area is rainwater, which
infiltrates into the ground through various lithological units present in the study area.
Total 57 nos. of RWH pits are proposed in the proposed site to recharge the ground
water. The runoff from the rooftop and storm water shall go to the recharge pits.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 64
Scheme for Ground Water Recharging
The rainwater is diverted from the rooftop using rain water pipes to the surface /
underground drainage network. The entire campus is sub divided for recharging
structures. The rainwater is diverted into the desilting tank to remove inorganic
impurities and the outflow of the desilting tank is taken into the recharge well.
Desilting Tank
The desilting tanks are used to remove silt and other floating impurities from
rainwater. Desilting tank is like an ordinary container having provision for the
inflow, outflow and overflow. Apart from removing silt it holds the excess amount of
water till it is soaked up by the recharge structure. The bottom of tank have unpaved
surface (layers of coarse sand) to allow standing water to percolate into the soil. The
rainwater collected in these desilting chambers is being utilized for horticulture.
Recharge well
The recharge well consists of percolation pits with boreholes in the middle of the pit.
UPVC pipe perforated is being lowered in the middle of the boreholes and the pit is
being filled with gravel and pebbles in three layers consisting of boulders, gravel and
coarse sand. The mouth of the UPVC pipe shall be protected to avoid silt getting into
it. The depth of the bore is depend on the soil condition/water strata. The schematic
diagram is enclosed.
Therefore there is no significant impact on surface water quality & hydrology of the
area. The proposed rainwater-harvesting scheme is being stabilize the groundwater
table in the area.
3.7.2.4 RAIN WATER HARVESTING CALCULATION:
Table 13: Rain Water Harvesting Calculation
S.
N
o. Description of Area
Area
Considere
d (Sq. M)
Harvestin
g Factor /
Collection
Efficiency
per area
Retention
time capacity
of recharge
tank in 15
min (45 mm)
Total Volume of
Water Available for
Rain Water
Harvesting
(cu. m/15 min)
1
Water Available from
Terraces of
Apartment
buildings/Plots and
other roof-top
surfaces 40712.05 0.85 11 381
2
Paved Surfaces, Roads
& other Built-up
Areas
102543.7
9 0.65 11 733
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 65
Diameter of harvesting pits = 2.86 m
Depth of harvesting pits = 3.5 m
3
Lawns, Gardens & all
other Open Areas 77137.76 0.20 11 170
GRAND TOTAL 1284 cu m
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 66
3.7.2.5 NOISE ENVIRONMENT
The main sources of the noise pollution shall D.G sets. of 36×1.5 MVA that shall be
installed in the colony.
3.7.2.5.1 Noise Pollution Control System
DG sets shall be kept in acoustically treated room and shall be meet the norms
prescribed by CPCB. Planting of the trees at the boundary of the project help in
reducing the level of the noise within the Complex.
Location of DG sets: Surface
3.7.2.5.2 ACOUSTIC ENCLOSURE / TREATMENT
There are two methods to reduce noise from DG Sets.
1. Acoustic Enclosures [when DG Set is kept outdoor]
2. Acoustic Treatment [when DG Set is kept indoor]
ACOUSTIC TREATMENT:
(a) MAIN FRAME:
3’ 1.5” rectangular pipe shall be used to make main frame of the panel covered with
18 gauge MS sheet from one side.
Insulation by Glass Wool:
3” thick glass wool pad of high density covered with tissue paper shall be used for
absorption of sound.
Covering Layer:
Finally, the insulated material is covered with perforated galvanized (GI) sheet
(24SWG) to prevent damage to insulating material.
(b) AIR VENTILATION SYSTEM
The acoustic lining defined in above results in accumulation of heat generated by DG
Set. Therefore the temperature of the treated room may increase which may adversely
affect the life of DG Set. To overcome the said problem, a proper ventilation system
should be designed.
As per calculation of heat generated by DG Sets a regular fresh air is continuously
sucked from the enclosure with the help of two 20” axial fans. There have been two
24” axial fans for the supply of fresh air. The pressure difference inside and outside
of the room has been less than 8 mm WG, which does not affect the normal running
condition of DG Sets.
(c) INSULATION OF AIR INLET AND OUTLET POINTS
The sound travels along with air therefore it is necessary to control the traveling
sound with the help of insulated ducts [2” glass wool pads and perforated sheets] and
louvers at inlet and outlet air points. The ducts have S-type shape to prevent any direct
escape of noise.
(d) INSULATED SERVICE DOOR
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 67
The maintenance and servicing of DG Set is done using a suitable service door of 5’ x
7’ size. The door is made of MS sheet and frames fully insulated with 3” thick glass
wool pad followed by perforated aluminium sheets.
The schematic layout of acoustic enclosure is given below:
ACOUSTIC TREATMENT FOR D. G. SET ROOM
3.7.2.6 PARKING MANAGEMENT
3.7.2.6.1 Parking Required:
Total parking required within the processing and non-processing zone is 7752 ECS.
3.7.2.6.2 Parking Provided: Parking provision is being 7800 ECS.
3.7.2.7 WASTE MANAGEMENT
3.7.2.7.1 MUNICIPAL SOLID WASTE
For 49300 persons around 9645 kg/day of municipal solid waste will generated from
the proposed site.
The solid waste categories and disposal method detail is shown is given in Table 14:
Table 14: Municipal Waste Management
Type of Waste Colours of Bins
Category Disposal Method Total Waste (Kg/ day)
Organics Green Bio Degradable
The waste will be sent to Municipal Solid
Waste site
6752
Recyclable Items
Blue Recyclable Recycler 2893
Total 9645 kg/ day
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 68
3.7.2.7.2 Hazardous waste management:- Hazardous waste is a waste with properties that make it dangerous or potentially
harmful to human health or the environment. The universe of hazardous wastes is
large and diverse. Hazardous wastes can be liquids, solids, contained gases, or sludge.
They can be the by-products of manufacturing processes or simply discarded
commercial products, like cleaning fluids or pesticides. All hazardous wastes are
required to be treated and disposed off in the prescribed manner.
The main objective is to promote safe management and use of hazardous substances
including hazardous chemicals and hazardous wastes, in order to avoid damage to
health and environment.
Table 15: Hazardous & E-Waste Management
Type
of
Waste
Colours
of Bins Category Disposal Method
Total
Waste
Used
Oil
Black
With
Label
Hazardous
Waste
Waste shall be collected
in leak proof containers
at isolated place and
then it will be given to
approved vender of
CPCB as per Hazardous
Wastes (Management/
Handling/Transboundry
Movement) Rules, 2008,
as amended in 2011
432
lit/Month
E-
waste
Black
With
Label
Hazardous
Waste
E-Waste (Management
& Handling) Rules, 2011
2
Kg/month
Battery waste shall be generated from inverters & UPS, which shall be treated as per
the Batteries (Management & Handling) Rules.
3.7.2.7.3 PLANTATION
Green belt planning shall be done with ecological perspectives for the project taking
into consideration and availability of space and other aspects. This is being help in
increasing the aesthetic effect of the environment.
Since tree trunks are devoid of foliage, scrub is being form there to give coverage to the trunks. The
trees maintain the regional ecological balance and conform to soil and hydrological conditions.
Indigenous species is being preferred.
Green belt/greenery is being developed along most of the periphery of the project
area as well as along roads. Area under plantation/greenery is 77137.76 sq m with
trees and plants. The trees planted are of adequate height. Any trees that do not
survive.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 69
3.7.2.7.4 PLANTATION PROGRAMME LAYOUT
Plantation in the project area helps to arrest the particulate matter in the area and
hence attenuate the pollution to a great extent and contribute positively to the
environment. The trees also help in maintenance of regional ecological balance and
conform to soil and hydrological conditions. Indigenous species are preferred for the
purpose.
Proposed Trees to be planted in the Project Premises
S.
No. Botanical Name Common Name
1. Bauhinia variegata Orchid tree
2. Jacaranda mimosifolia Fern tree
3. Tabebuiaargentea Caribbean Trumpet Tree
4. Chorisiaspeciosa Silk floss
5. Plumeria alba Champa (White)
6. Grevillearobusta Silver oak
7. Hibiscus variegeta Variegated Hibiscus
8. Tecomagaudi chaudia Gaudi Chaudi
Proposed Shrubs to be planted in the project Premises
S.
No. Botanical Name Common Name
1. Hibiscus tri-colour Tricolor corkwood
2. Ficus panda Golden ficus
3. Murraya exotica Orange jasmine
4. Rhapis palm Lady palm
5. Cassia biflora Sonorant cassia
6. Hibiscusrosa-sinensis Chinese hibiscus
7. Hameliapatens Firebush
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 70
ANTICIPITATED IMPACT & MITIGATION MEASURES
3.8.1 DURING CONSTRUCTION PHASE S.
NO.
Description Impacts Mitigation Measures
1. Air & Noise
Environment Dust is being generated due
to Site clearance and
emissions may be generated
due to vehicles, DG sets and
machinery/equipment etc.
Loading and unloading of
construction materials like,
cement, sand, stones, bricks,
etc. will result in dust
generation.
Procurement and transport
of construction materials
such as sand, cement etc.
also result in dust generation
Water sprinkling is
being done to reduce
the dust during
construction of
buildings.
D.G. set of 62.5 KVA
is being provided
with adequate stack
height to avoid
emissions.
Trees is being planted
along the
construction site to
reduce dust &
emissions.
2. Water
Environment Soil runoff from the site
leading to off – site
contamination (Particularly
during rainy season).
Improper disposal of
construction debris leading
to off-site contamination of
water resources.
Disposal of domestic waste
water from temporary
labour rest rooms.
Spillage of oil and grease
from the vehicle and waste
water stream generated
from on-site activities.
During construction
phase, water is being
provided from the
nearby STP/ HUDA
STP via tanker
supplier.
The rain water from
the construction site
is being collected,
treated & reused for
sprinkling.
The sewage from
labours is being
discharged into septic
tank followed by soak
pit.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 71
3. Solid Waste The waste from labour rest
rooms/sheds is being mainly
household domestic waste
The solid waste generated
during construction phase
used oil from DG sets.
Approx. 37.5 kg/day
municipal solid waste
is being generated
from 200-250
labours which is
being disposed off in
MSW site.
Used oil whenever
generated from the
DG sets is being kept
in an isolated area
and in leak proof
container and sent to
approve recycler.
3.8.2 DURING OPERATION PHASE S. No. Description Impacts Mitigation Measures
1. Air & Noise
Environment Running of DG sets during
power failure is being result
into air emissions.
DG sets shall be provided
with stack height of 6 m
above roof level as per
CPCB norms.
2. Water
Environment During the operation phase
abstraction of water is not
proposed for project .
In the proposed project, water
is being used for domestic use,
flushing, cooling, misc. etc.
Therefore, wastewater
discharge is being liquid waste
and sewage and is being
treated in STP of 3000 KLD
capacity and reused in
flushing & gardening
purposes. No waste is being
discharged to sewer line.
Fresh water requirement
shall be reduced by using
treated water.
The excess treated water
shall be given to tankers
suppliers & hence no
discharge to sewers shall
be made.
Rain water is being stored
into the ground water by
57 rain water harvesting
pits.
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 72
3. Solid Waste Bio-degradable and recyclable
waste from households
activities.
Used oil from DG sets and e-
waste.
E- waste & battery waste
generation.
Bio-degradable waste is
being sent to municipal
site for disposal.
Used oil of 432 lit/Month
shall be generated from
the DG sets which is being
kept in an isolated area
and in leak proof
container and is being
given to authorised
recycler.
The generated E-waste
shall be given to
Authorized vendor.
Battery waste shall be
treated as per the
Batteries (Handling &
Management) Rules,
2001.
ENVIRONMENT MONITORING PLAN
Monitoring During
Construction
During Operation
Air & stack :
Ambient air quality at appropriate
location for PM10,PM2.5,SO2.NOX
Stack emission for point sources
PM,SO2,NOX,HC & CO.
Six monthly
Six monthly
Annually
Annually
Water :
Water Quality Monitoring for
relevant parameters of IS - 10500
Six monthly
Six monthly
Wastewater:
Waste Water Quality (Treated &
Untreated) for pH, TSS, Oil &
Grease.
Waste water quality pH, TSS, oil &
Grease. BOD, COD, TKN &
Phosphate.
--
--
Daily till
stabilization of
STP.
Weekly till one
month then
monthly
Noise :
Day & night level Noise Monitoring
Six monthly
Annually
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 73
Soil :
Soil Monitoring ,Qualitative and
Quantitative testing/analysis to
check the soil fertility , porosity,
texture, water holding capacity etc.
Six monthly
Annually
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 74
CONSTRUCTION
STATUS
Construction status:
S.no Description Area (sq m)
1 1st Basement 9878.509
2 2nd Basement 10352.74
3 3rd Basement 3455.844
Total Area 23687.093
Total Blocks Construction Status
IT 7 1 block completed
Residential 10 Not started Retail/ Office Space 1 Not started
Club House 2 Not started
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 75
SITE PHOTOGRAPHS
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 76
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 77
TOPOGRAPHICAL MAP
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 78
LAYOUT PLAN
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 79
ZONING PLAN
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 80
COPY OF EARLIER EC
“ IT/ITES SEZ” at Sohna Road, Gurgaon Haryana
M/s Dr. Fresh Health Care Pvt. Ltd.
Prepared by:-M/s PerfactEnviro Solutions Pvt. Ltd. 81
CERTIFIED COPY OF MoEF&CC
Regional Office (COMPLIANCE LETTER)