CONSORTIUM (IOIC) Inspection and Test Plan/Quality Control Plan Project : South Pars Gas Field Development Phase 17 & 18, Onshore Facilities Company : POGC P.O. No. : PO-1718-0700-ID-0005 Vendor Document No. : VP-PO-1718-0700-ID-0005-004 Contractor : IPMI Req. No. : DI-1718-0700-ID-0005 Date : 10/10/2009 Vendor : SHAFAB Eng. Co. Sub-Vendor (S) : Rev. No. : 04 No. Activity Characteristic to be Verified Test Frequency Reference Procedure Acceptance Criteria Verifying Document Involved Parties S.V V C TPA O 6 Control Valves 6.1 Valve 6.1 Material Receiving Inspection Test Reports and Certificates 100%(by vendor) - ASTM Standard Test Reports and 3.1 Certificates H R R R 6.2 Dimensional and Visual Inspection As per Procedure 100%(by vendor) Vendor Procedure & RP-1718-999-1511- 0032 Vendor Procedure & RP-1718- 999-1511-0032 Report H R R 6.3 Performance Test Including Open/Close Check As per Procedure 100%(by vendor) Vendor Procedure & RP-1718-999-1511- 0032 Vendor Procedure & RP-1718- 999-1511-0032 Report H R R 6.4 Pressure Test/Tightness Test Seat Leakage Test Partial Stroke Test As per Procedure 100%(by vendor) EDS.No.021,521 & RP- 1718-999-1541-0001- 6 EDS.No.021,521 & RP-1718- 999-1541-0001- 6 Report H R R 6.5 Check Name and Tag Plates Actuator As per Procedure 100%(by vendor) Vendor Procedure & RP-1718-999-1511- 0032 Vendor Procedure & RP-1718- 999-1511-0032 Report H R R 6.6 Check Name and Tag Plates Actuator As per Procedure 100%(by vendor) Vendor Procedure & RP-1718-999-1511- 0032 Vendor Procedure & RP-1718- 999-1511-0032 Report H R R 6.2 Actuator

ITP Typical

Embed Size (px)

DESCRIPTION

Inspection & Test Plan

Citation preview

Page 1: ITP Typical

CONSORTIUM (IOIC)

Inspection and Test Plan/Quality Control Plan

Project : South Pars Gas Field Development Phase 17 & 18, Onshore Facilities

Company : POGC P.O. No. : PO-1718-0700-ID-0005 Vendor Document No. : VP-PO-1718-0700-ID-0005-004

Contractor : IPMI Req. No. : DI-1718-0700-ID-0005 Date : 10/10/2009

Vendor : SHAFAB Eng. Co. Sub-Vendor (S) : Rev. No. : 04

No. Activity Characteristic to be

Verified Test

Frequency Reference Procedure

Acceptance Criteria Verifying

Document

Involved Parties

S.V V C TPA O

6 Control Valves

6.1 Valve

6.1 Material Receiving Inspection Test Reports and

Certificates

100%(by

vendor) -

ASTM Standard

Test Reports and 3.1

Certificates H R R R

6.2 Dimensional and Visual Inspection As per Procedure 100%(by vendor)

Vendor Procedure & RP-1718-999-1511-

0032

Vendor Procedure & RP-1718-999-1511-0032

Report H R R

6.3 Performance Test Including Open/Close Check

As per Procedure 100%(by vendor)

Vendor Procedure & RP-1718-999-1511-

0032

Vendor Procedure & RP-1718-999-1511-0032

Report H R R

6.4 Pressure Test/Tightness Test Seat Leakage Test

Partial Stroke Test As per Procedure

100%(by vendor) EDS.No.021,521 & RP-

1718-999-1541-0001- 6 EDS.No.021,521 & RP-1718-

999-1541-0001- 6 Report H R R

6.5 Check Name and Tag Plates Actuator

As per Procedure 100%(by vendor)

Vendor Procedure & RP-1718-999-1511-

0032

Vendor Procedure & RP-1718-999-1511-0032

Report H R R

6.6 Check Name and Tag Plates Actuator

As per Procedure 100%(by

vendor)

Vendor Procedure & RP-1718-999-1511-

0032

Vendor Procedure & RP-1718-999-1511-0032

Report H R R

6.2 Actuator

Page 2: ITP Typical

CONSORTIUM (IOIC)

Inspection and Test Plan/Quality Control Plan

Project : South Pars Gas Field Development Phase 17 & 18, Onshore Facilities

Company : POGC P.O. No. : PO-1718-0700-ID-0005 Vendor Document No. : VP-PO-1718-0700-ID-0005-004

Contractor : IPMI Req. No. : DI-1718-0700-ID-0005 Date : 10/10/2009

Vendor : SHAFAB Eng. Co. Sub-Vendor (S) : Rev. No. : 04

No. Activity Characteristic to be

Verified Test

Frequency Reference Procedure

Acceptance Criteria Verifying

Document

Involved Parties

S.V V C TPA O

6.2.1 Check Material Certificate(body) Test Reports and

Certificates

100%(by vendor) -

ASTM Standard

Test Reports and 3.1

Certificates H R R R

6.2.2 Dimensional and Visual Inspection As per Procedure 100%(by vendor)

Vendor Procedure & RP-1718-999-1511-

0032

Vendor Procedure & RP-1718-999-1511-0032

Report H R SW

(10%) R

6.2.3 Function Test As per Procedure 100%(by vendor)

Vendor Procedure & RP-1718-999-1511-

0032

Vendor Procedure & RP-1718-999-1511-0032

Report H R W

(10%) R

6.2.4 Final Inspection & Issuance of Inspection Release Note(IRN)(By TPA)

As per Procedure Per

Shipment PR-1718-999-QM-0098 PR-1718-999-QM-0098

Signed Certificate &

IRN H W H R

6.2.5 Pre-Shipment and Loading& Issuance Of Shipping Release Note (SRN)(By TPA)

Quantity ,Packing Condition, Shipping mark

100% DB-1718-999-P332-

3002 & Vendor approved procedure

DB-1718-999-P332-3002 & Vendor approved procedure

Signed Packing list &

SRN H R H R

6.2.6 Manufacturer's Data Records (MDR) All Certificate & Reports Per

Shipment PR-1718-999-QM-0097 PR-1718-999-QM-0097 MDR H R R R

Abbreviation:

S.V : Sub Vendor S/W : Spot Witness V : Vendor R : Document Review

H : Hold Point W : Witness Point C : IPMI N/A : Not Applicable

TPA : Third Party Nominated by IPMI O : Company

Page 3: ITP Typical

CONSORTIUM (IOIC)

Inspection and Test Plan/Quality Control Plan

Project : South Pars Gas Field Development Phase 17 & 18, Onshore Facilities

Company : POGC P.O. No. : PO-1718-0700-ID-0005 Vendor Document No. : VP-PO-1718-0700-ID-0005-004

Contractor : IPMI Req. No. : DI-1718-0700-ID-0005 Date : 10/10/2009

Vendor : SHAFAB Eng. Co. Sub-Vendor (S) : Rev. No. : 04

No. Activity Characteristic to be

Verified Test

Frequency Reference Procedure

Acceptance Criteria Verifying

Document

Involved Parties

S.V V C TPA O