Upload
gguna2010
View
217
Download
0
Embed Size (px)
Citation preview
8/9/2019 ITR06!08!09 Site Survey Agenda
1/6
Upg
rade and R placement of F&G syst
S
Upg
F&
QGI
ms in QG A
Page 1
ite S
ade
sys
I
I
I
ontravens
ssets ITR
rvey
nd R
ems
R06
R08
R09
ct# Ls Ref
6/08/09 Si
Agen
eplac
in Q
F&
F&
F&
C/VEME-
e Survey A
De
da fo
men
Ass
/2021500
enda
c 4. 2014
t of
ts
/12
8/9/2019 ITR06!08!09 Site Survey Agenda
2/6
Upgrade and Replacement of F&G systems in QG Assets ITR06/08/09 Site Survey Agenda
Page 2Dec 4, 2014
Table of Contents
1 INTRODUCTION ................................................................................................................... 32 SITE SURVEY AGENDA/OBSERVATION ........................................................................... 43 Post Site Survey Meeting Minutes ..................................................................................... 6
8/9/2019 ITR06!08!09 Site Survey Agenda
3/6
Upgrade and Replacement of F&G systems in QG Assets ITR06/08/09 Site Survey Agenda
Page 3Dec 4, 2014
1 INTRODUCTION
This site survey is planned for F&G systems in QG-1 ITR06, 08 and 09 in order to collect required
information for systems engineering. A joint review meeting shall be held at QG to discuss the
outcome of this site survey and clarify queries. Planned date for the site survey is 10 th-11th Dec 14.
8/9/2019 ITR06!08!09 Site Survey Agenda
4/6
Upgrade and Replacement of F&G systems in QG Assets ITR06/8/9 Site Survey Agenda
Page 4
2 SITE SURVEY AGENDA/OBSERVATION
Item Area Activity Description Status Observation
1 ITR06 F&G
1.1.Confirm the count of Combustible Gas detectors vs
SFD and ABB Ladder.
1.2.Identify MCBs for existing F&G feeders and
additional feeder for SOVs.
1.3.Identify DCW ELCO cables, these cables will not
be unplugged or removed at all. Other ELCO cableswill be disconnected from ELCO boards
1.4.Identify space in Marshalling cabinets to
accommodate SIL-3 Relays.
1.5.Get clarification from QG about any pendingqueries related to ITR06 F&G.
2 ITR08 F&G
2.1Confirm the count of Combustible Gas detectors vsSFD and ABB Ladder.
2.2 Identify MCBs for existing F&G feeders andadditional feeder for SOVs.
2.3 Identify DCW ELCO cables, these cables will not
be unplugged or removed at all. Other ELCO cableswill be disconnected from ELCO boards
2.4 Identify space in Marshalling cabinets to
accommodate SIL-3 Relays.
2.5Get clarification from QG about any pendingqueries related to ITR08 F&G.
8/9/2019 ITR06!08!09 Site Survey Agenda
5/6
Upgrade and Replacement of F&G systems in QG Assets ITR01 Site Readiness Review Report
Page 5
3 ITR09 F&G
3.1. Identify DCW ELCO cables, these cables will not
be unplugged or removed at all. Other ELCO cables
will be disconnected from ELCO boards
.
3.2. Identify space in Marshalling cabinets to
accommodate SIL-3 Relays.
3.3. Identify MCBs for existing F&G feeders
3.4. Identify F.O. links between MCR ITR09 LocateF.O converter in ABB cabinets
3.5. Identify the connector type for F.O. cable between
FO converter and Patch cord Panel. Record the port no.for ITR09.
3.6. Discuss with QG the requirement of FO linkbetween MCR to ITR09.
3.7. Get clarification from QG about any pending
queries related to ITR09 F&G.
4 COMMON5.1Collect Existing Mapping List for ITR06/8/9 F&G
systems
8/9/2019 ITR06!08!09 Site Survey Agenda
6/6
Upgrade and Replacement of F&G systems in QG Assets ITR01 Site Readiness Review Report
Page 6
Dec 4. 2014
3 Post Site Survey Meeting Minutes
- To be Filled -