ITR06!08!09 Site Survey Agenda

Embed Size (px)

Citation preview

  • 8/9/2019 ITR06!08!09 Site Survey Agenda

    1/6

    Upg

    rade and R placement of F&G syst

    S

    Upg

    F&

    QGI

    ms in QG A

    Page 1

    ite S

    ade

    sys

    I

    I

    I

    ontravens

    ssets ITR

    rvey

    nd R

    ems

    R06

    R08

    R09

    ct# Ls Ref

    6/08/09 Si

    Agen

    eplac

    in Q

    F&

    F&

    F&

    C/VEME-

    e Survey A

    De

    da fo

    men

    Ass

    /2021500

    enda

    c 4. 2014

    t of

    ts

    /12

  • 8/9/2019 ITR06!08!09 Site Survey Agenda

    2/6

    Upgrade and Replacement of F&G systems in QG Assets ITR06/08/09 Site Survey Agenda

    Page 2Dec 4, 2014

    Table of Contents

    1 INTRODUCTION ................................................................................................................... 32 SITE SURVEY AGENDA/OBSERVATION ........................................................................... 43 Post Site Survey Meeting Minutes ..................................................................................... 6

  • 8/9/2019 ITR06!08!09 Site Survey Agenda

    3/6

    Upgrade and Replacement of F&G systems in QG Assets ITR06/08/09 Site Survey Agenda

    Page 3Dec 4, 2014

    1 INTRODUCTION

    This site survey is planned for F&G systems in QG-1 ITR06, 08 and 09 in order to collect required

    information for systems engineering. A joint review meeting shall be held at QG to discuss the

    outcome of this site survey and clarify queries. Planned date for the site survey is 10 th-11th Dec 14.

  • 8/9/2019 ITR06!08!09 Site Survey Agenda

    4/6

    Upgrade and Replacement of F&G systems in QG Assets ITR06/8/9 Site Survey Agenda

    Page 4

    2 SITE SURVEY AGENDA/OBSERVATION

    Item Area Activity Description Status Observation

    1 ITR06 F&G

    1.1.Confirm the count of Combustible Gas detectors vs

    SFD and ABB Ladder.

    1.2.Identify MCBs for existing F&G feeders and

    additional feeder for SOVs.

    1.3.Identify DCW ELCO cables, these cables will not

    be unplugged or removed at all. Other ELCO cableswill be disconnected from ELCO boards

    1.4.Identify space in Marshalling cabinets to

    accommodate SIL-3 Relays.

    1.5.Get clarification from QG about any pendingqueries related to ITR06 F&G.

    2 ITR08 F&G

    2.1Confirm the count of Combustible Gas detectors vsSFD and ABB Ladder.

    2.2 Identify MCBs for existing F&G feeders andadditional feeder for SOVs.

    2.3 Identify DCW ELCO cables, these cables will not

    be unplugged or removed at all. Other ELCO cableswill be disconnected from ELCO boards

    2.4 Identify space in Marshalling cabinets to

    accommodate SIL-3 Relays.

    2.5Get clarification from QG about any pendingqueries related to ITR08 F&G.

  • 8/9/2019 ITR06!08!09 Site Survey Agenda

    5/6

    Upgrade and Replacement of F&G systems in QG Assets ITR01 Site Readiness Review Report

    Page 5

    3 ITR09 F&G

    3.1. Identify DCW ELCO cables, these cables will not

    be unplugged or removed at all. Other ELCO cables

    will be disconnected from ELCO boards

    .

    3.2. Identify space in Marshalling cabinets to

    accommodate SIL-3 Relays.

    3.3. Identify MCBs for existing F&G feeders

    3.4. Identify F.O. links between MCR ITR09 LocateF.O converter in ABB cabinets

    3.5. Identify the connector type for F.O. cable between

    FO converter and Patch cord Panel. Record the port no.for ITR09.

    3.6. Discuss with QG the requirement of FO linkbetween MCR to ITR09.

    3.7. Get clarification from QG about any pending

    queries related to ITR09 F&G.

    4 COMMON5.1Collect Existing Mapping List for ITR06/8/9 F&G

    systems

  • 8/9/2019 ITR06!08!09 Site Survey Agenda

    6/6

    Upgrade and Replacement of F&G systems in QG Assets ITR01 Site Readiness Review Report

    Page 6

    Dec 4. 2014

    3 Post Site Survey Meeting Minutes

    - To be Filled -