ITS America Annual MeetingSession 38
Managing and Operating the Transportation System
• Christine M. Johnson
“During my tenure as Secretary of Transportation, the benchmark of success for ITS will be the deployment of Intelligent Transportation Systems.”
Secretary Norman Mineta, ITS America National Summit, April 18, 2001
100110120
130140150160
170180
1980
1982
1984
1986
1988
1990
1992
1994
1996
1998
Inde
x 19
80 =
100
VMT (millions) Lane Mile Index
No longer a big city problem-Congestionin small areas grew 300%
“Never before in this century, except during the two world wars, has the country’s transportation system been as stressed as it is now” – Washington Post 5/15/01
Vehicle travel up 72%Road Miles, up 1%
1980-1998
Preferred Improvements
Percentage of “Great Help” responses shown
2/3s of all responses called for improved operations!
Fewer traffic signals
Improving roadway signs and markingsImproving accuracy/timeliness of info
More HOV lanes
Signals on freeway entrancesIncreasing roadside service patrols
Installing more left turn signalsReversing travel lanes
Managing traffic around roadwork
Re-routing traffic to avoid roadworkImproving public transportation
Signs with emergency phone numbersTow trucks at key locations
Managing traffic congestion better
Checking traffic signals oftenSigns showing expected roadwork delays
More travel lanesClearing accidents quickly
Improving traffic signal timingReducing repair time
0% 20% 40% 60%
Congestion Ahead
No Kidding!So what am I supposed to
do now!
Metropolitan Travel Management
50 Metro TOCs 2255 VMS signs on Freeways and Arterials in 78 metro areas
25% of large city transit with AVL 75% Toll Roads w/ETC
The new challenge: Turning ITS Projects into Services
Using ITS
to operate the system
for better efficiency
greater safety
more productivity
Delivering on the Promise
From a project based culture…..
Good morning, Mr. Jones,the system is running at about 80% reliability thismorning. Allow about 5 min.extra and use the 14th St. exit
From a project based culture…..
...To one driven by performance and customer service
Make it work – 24/7Special Event Task Force
Ratings, advertising, ROIMedia
ROIParking
Saving lives, protectingEmergency Response
Law enforcementPolice
Design, Construct ProjectsState DOT
Primary FocusAgency
To a “Core Mission”
From “not my primary mission”
Incidents
Special EventsWeather
Work Zones
Take Back The Road4 L
an
es o
f H
i gh
way
Demand Management using ITS effectively adds capacity
Operations
At least I called ahead and delayed the meeting
And tell the customer !!
Many areas have pulled it off…
If only for a few days.
Integrated planning, Execution & accountability - institutionalized
Performance
Measures, tools,
data
What is it going to take to achieve Peak Performance?Com
municate w
ith public
Spend the money it takes
ITS infrastructure
Raise the Bar
Peak Performance ITS Infrastructure
What minimum information should we expect from a 21st Century highway?
With IT’S A --developing ITS Infrastructure requirements.
Peak Performance Raising the Bar
Designed to help agencies and regions diagnose where they can improve system management and operations
•Signal Timing?
•Incidence response co-ordination?
•Better weather response?
OperationsSelf Assessment
Operations Self Assessment
Peak Performance Integration
• Architecture Rule • The Long Range Plan for
Operations
• Required in 4 years
• Brings right players to table
• Workshop on Regional Operating Organizations
Sept 18th-19th - Atlanta
Peak Performance MeasuresTravel Time Reliability
• 1-week snapshot example
• Day-to-day comparison: Same trip/same time
0102030405060708090
100
Travel Time
(Minutes)
Monday Wednesday Friday
Average ± 10%
Reliable: 3 of 5 days or 60%
511 – DOT a phone
call away
At least I called ahead and delayed the meeting
511 will force integrated accountability
•AASHTO Steering Committee
•Model Deployment
•Guidelines
•Planning Grants
Peak Performance Communicate with Customer
Peak Performance Spend the Money
Launched Survey -- Are we spending enough? Does operations compete well?
Baseline data
•States - flat 5- 6%
•Cities have grown from 3% to nearly 7%
Cities
States
Operations is not a low cost alternative it is essential!
National Dialogue on Operations
Public Safety Initiative
Regional Meetings
Association Dialogues Agendas
Agendas
Agenda
Operations in PlanningAgenda
Operations Summit
Aashto
ITE
AMPO
ITS 10 Yr Plan
Get involved!
www.ops.fhwa.dot.gov/nat_dialogue.htm
Condition & Performance Report
Overall the system is operating at a 65%
reliability
Condition
But not system performance