ITU-R Liaison Group Report - Session #73 Opening Plenary
IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number:IEEE L802.16-11/0020Date Submitted:2011-05-16Source:Takashi Shono Voice: +81 3 6268 4665Intel Corporation E-mail: [email protected]
Venue:IEEE 802.16 Session #73, WG Opening PlenaryBase Contribution:None.Purpose:ITU-R Liaison Group presentation to Opening Plenary of the WG, containing plan for the weekNotice:This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein.
Release:The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this
contribution may be made public by IEEE 802.16.
Patent Policy:The contributor is familiar with the IEEE-SA Patent Policy and Procedures:<http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>.Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.
ITU-R Liaison Group Report - Session #73 Opening Plenary
Takashi ShonoChair, 802.16 ITU-R Liaison Group
IEEE 802.16 WG Session #73Lake Louise, Canada, 16-19 May 2011
Relevant Documents from Previous Sessions
• IEEE L802.16-10/0017r7IEEE 802.16 ITU-R Liaison Group Workplan
• IEEE L802.16-11/0017r2ITU-R Liaison Group Report to Closing Plenary of Session #72
========== Also ===========• IEEE L802.16-08/079IEEE 802.18 IMT-Advanced review process (IEEE 802.18-08-0058/r6)
Input Documents for Session #73Liaisons• IEEE L802.16-11/00xx (From ITU-R WP 5D)[5D/487(Rev.1)] Liaison statement to the GCS proponents and authorised transposing organizations on the completion of Rec. ITU-R M.[IMT.RSPEC] (2011-04-13)
• IEEE L802.16-11/00xx (From ITU-R BR)Completion of Relevant Business Matters for Recommendation ITU-R M.[IMT.RSPEC]Liaison Statement to External Organizations (Revision of M.1224) (2011-05-11)
Proposed Objectives for Session #73Per Workplan
• Review the outcome of WP 5D #10
• Prepare draft Certification C
Beyond Workplan• Review input liaison statements and prepare responses as
appropriate
• Make a plan for the next WATO meeting
• Update ITU LG workplan as appropriate
1) Introduction, approval of the agenda
2) Review and follow workplan of L802.16-10/0017r7
3) Review liaisons, and prepare responses and any other output documents to external organizations as necessary
4) Update workplan
5) Approve all outgoing documents
6) Other business
Proposed Agenda for the Week
Proposed Schedule for the Week(Room: Parker)
Monday Tuesday Wednesday Thursday
AM08:30 to 12:00
1) Introduction, approval of the agenda
2) Review and follow workplan of IEEE L802.16-10/0017
4) Update workplan
5) Approve all outgoing documents
3) Review liaisons, and prepare responses and any other output documents to external organizations as necessary
PM13:30 to 18:00
6) Other business
UPDATE ON ITU-RIMT-ADVANCED DEVELOPMENT
Steps in radio interface development process:
Step1 and 2
No.1 No.2 No.3 No.4 No.5 No.6 No.7 No.8 No.9
Step 3(0)
(1)
(20 months)
Step 4
(8 months)
(16 months) (2)Steps 5,6 and 7
(3)Steps 8
(4)(12 months)
(20 months)
WP 5D meetings
Step 1: Issuance of the circular letterStep 2: Development of candidate RITs and SRITsStep 3: Submission/Reception of the RIT and SRIT proposals
and acknowledgement of receiptStep 4: Evaluation of candidate RITs and SRITs
by evaluation groups
Step 5: Review and coordination of outside evaluation activitiesStep 6: Review to assess compliance with minimum requirementsStep 7: Consideration of evaluation results, consensus building
and decision Step 8: Development of radio interface Recommendation(s)
Critical milestones in radio interface development process:(0): Issue an invitation to propose RITs March 2008(1): ITU proposed cut off for submission October 2009
of candidate RIT and SRIT proposals
(2): Cut off for evaluation report to ITU June 2010(3): WP 5D decides framework and key October 2010
characteristics of IMT-Advanced RITs and SRITs(4): WP 5D completes development of radio February 2011
interface specification Recommendations
2008 2009 2010No.10
2011
IMT-Advanced A2-01
We are here
IMT-Advanced Development Process
• WP 5D finalized and preliminarily agreed Preliminary Draft New Recommendation ITU-R M.[IMT.RSPEC]
– IEEE’s contribution (L802.16-11/0010r2, 5D/932) on the overview section of WirelessMAN-Advanced in IMT.RSPEC has been incorporated into IMT.RSPEC as is
Outcome of WP 5D #10(Sweden, 6-13 April)
• WP 5D #11 (HI, USA, 7-14 July 2011)– Before the meeting (actually by 30 June), IEEE needs to submit an
administrative document, e.g. copyright, to ITU-R BR
• WP 5D #12 (TBD, October 2011)– Agree IMT.RSPEC and forward to SG 5 (November 2011)
• RA-12 (Geneva, January 2012)– Approve IMT.RSPEC
Timeline for Completion of IMT.RSPEC