Upload
ivana-nikoli
View
248
Download
2
Tags:
Embed Size (px)
Citation preview
IVANA NIKOLIĆ - PORTFOLIOARCHITECT AND URBAN PLANNER
ContactAddress: 1074 Mecaslin Street NW Atlanta 30318, GA EU Number: +385 98 176 8946US Number: +1 404 953 0864
E-mail: [email protected]
urban integration - KAJZERICA KINDERGARDEN
On the south bank of the Sava river in Zagreb in the residential area of Kajzerica there is not much space quality , pleasant ambience or represen-tative architecture. Although it was built without any spatial or urban plans, the rows of houses and buildings can still be determined. Existingurban value was used to group and locate the kindergarten and its facilities into 6 units. Nevertheless, that urban value is not visible in the spacebut only in the plan, therefore a new membrane with multifunctional purpose was created. The membrane served as a border of a new childrenmicroworld, as a security fence, as a connection among all the units and as a multipurpose space for children to play.
50 100 200site plan
2 51 10
a - a section b - b section
c - c section
conceptual and designing sketches
+3.6
±0.0
+7.0+7.4
-0.1
+8.6+9.0
+3.6
±0.0
+7.4+8.0
-0.1
+3.6
±0.0
+1.8
-0.1
+3.6
±0.0
+7.4+8.0
+3.6
±0.0
+7.0
-0.1-0.1
5 10 20ground �oor plan
aa
b
b
c
c
perspective view
sport + MUZIL DANCE CENTER
was situated in the ground, with roof’s surfaces and skylights being the only visible intervention in the natural envi-ronment. The underground space held sport and dance halls, while the administration area was located in the oldforti�cation roof structure was designed as a series of wooden beams with di�erent sections.
The Muzil peninsula is a part of the city Pula mostly covered with rich vegetation and old forti�ca-tions. Because of the natural resources any new interventions in this area should be as subtle aspossible, while its form and purpose should emphasize the quality of existing views. The mainpurpose of the new building was to construct sports facility with an emphasis on dance. Most of it
50 100 200
10 20 50
site plan
-5.2
±0.0
-5.2
-5.2
-5.2
-10.0
-10.0
-10.0
-6.0
ground/�rst �oor plan
10 20 50east and west frontage
1 2 5section through fasade
±0.0
+4.5
+6.4
+7.0
-10.0
housing revitalisation - FOLNEGOVICEVOFolnegovicevo is a residential area in Zagreb built in the 1960s and due to its high quality there is no need for urban intervention, while its build-ings need an urgent revitalisation. The basic constructive and residential unit of the selected building type was 4 x 4 metres, so the intention wasto keep that concept since it o�ers potential for �exibility. The aim was to keep the same constructive system and the same number of �ats, butto improve the quality of life. Along the north side of the existing building a new row of units was introduced, as well as one unit added to boththe eastern and western sides. These interventions create new �exibility inside the �ats, which on one side can be extanded into a new unit bet-ween two �ats as well as being used as open or closed spaces.
1 2 5plan of a typical �at
�exibility of a �at
existing building intervention new building
1S 1S 1S 1S2S 2S 1S 1S 1S 1S2S 2S 2S 1S 1S 2S1S 1S
interior design - MADE IN CROATIA
Recently Croatia has made a big e�ort in order to present itself through more aspects ofits heritage other than the beautiful Adriatic coast. The idea of this project is to create acommon and unique space to display outstanding Croatian products. The interior designwas carried for a brand called PIP d.o.o. that produces quality products made of honey.The space that was created would be both a showroom and a shop, de�ned by a centralconstruction that is imitating a bee hive.
10 20 50
1 1052
ground �oor plan
site plan
section through entrance lobby and sales area
detailed design - CAR SHOWROOM
The task was to create an original space for cars to be shown and sold. The design was determined by the path ofusers moving through the space. This path was de�ned by three continuous, curved walls. Those curvatures deri-ved from the idea of opening to the northwest, which is the most representative space. Contrast was also one ofthe themes most successfully shown in the construction, where organic, soft and wavy walls were opposing thesolid and squared roof plate.
10 20 50
1 2 105
site plan
cross section
pitch 1%
concrete slabs 4 cmsand 6 cmgravel 10 cmdrainage 2 cmrammed soil
C1
0.00+- -0.05 -0.10
+5.70
0.00+- 0.00+- -0.05 -0.10
+4.00 +4.10
+5.80
+4.00
+6.20
+5.80
-0.85 -1.40 -1.40 -1.40 -1.40 -1.40 -0.85
pitch 2.5% pitch 2.2%
+2.50
+5.70
+4.00 +4.10
+5.80
94 8 181 8 192 8 192 8 192 8 192 8 192 8 192 8 192 10 168 10 160 59 327 10 174 8 232 8 131 57
509807
179 171 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 170 180
12099
297
930
699
1510
19
1538
414
515
59807
94110
1219
109
290 125
57
249
150
10
160
1014
15
384
160
A1
30
1416
891 1630 11
1519
94110
12 1519
94 110
12
+5.70
+4.00 +4.10
+5.80
-0.85
400
180
580
C1
+4.00
+6.20
+5.80
45
45
65
54
61 45
45
45
45
45
45 45
45
45
45
45
70
51
58
14810 265 10
106
469
146
11
405
140
58 891 571008 275
140
138
waterproof reinforced concrete
street layersasphaltsoil
flooring - EPOX coating 0.2 cmreinforced concrete floor 15 cmthermal insulation XPS 2x5 cmPE foil 0.02 cmwaterproofing-synthetic tape 1.2 cmlightly reinforced concrete floor 12 cmgravel 15 cm
insulating foil 0.1 cmOSB panel 2 cmventilated layer 4-10 cmextruded polystyrene 2x5 cmribbed tin 0.2 cm
pitch 2.3% pitch 2.5% pitch 2.0% pitch 3.2%
waterproof reinforced concrete waterproof reinforced concrete
1 105
ground �oor plan
90
198.5
270
300
270325
I
II
III
IV
V
VI
VII
VIII
IX
3% 3%
3%
3%
3%3%
3%
3%
P=7,90 m2
0.00+-
-0.02
-0.05
-0.05
-0.05-0.05
-0.05
-0.05
-0.05 -0.05
-0.10
-0.10
-0.10
D1
D3
90
220
180
220
E1
E2
F2
F1
45
180
p=150
0.00+-
0.00+-
0.00+-
I
II
III
IV
V
VI
VII
VIII
IX
-0.10
F1
F1
-0.02-0.02
F1
45
180
270
300
D3
D2D1
D1
D1
D3
D3
D1
D2
educational building - VRBANI SCHOOL
Within this program it was required to design a primary school with theaccompanying sport facilities. The given location was in the new resida-ntial area called Vrbani, planned and located in the southwest part ofZagreb. The goal of the urban setting was to contrast surrounding buil-dings, to create a local community centre as well as to emphasize newlyplanned pedestrian trail located along the north facade. The conceptwas to transmute the vertical communication into a multipurpose spacewhich connects all the parts and creates a unique and common area forthe whole school.
50 100 200
50105 20
site plan
ground �oor plan
longitudinal section
roof plan
conceptual thinking - CONNECTING MULTIFACETED UNITS INTO A SETThe task was to make a multipurpose space using multifaceted units for displays at the fair exibitions. It was inspired by free �oating icebergsthat create di�erent surfaces in di�erent moments. The elements used in the project were wooden �at surfaces �exible in their horizontalplacement on steel girders with adjustable height, where the vertical communication was located in the space between the girders which istwo metres wide.