5
Jaime Clement 42 notman way baldivis 0410219002 [email protected] I am a fully me -served pipe fier, experienced in both fabricaon and installaon. I’ve worked on lng plants, petrochemical sites, ship yards, airports and fab shops. I use my iniave and self- movaon to achieve objecves of quanty and high quality standards both alone and as a team player. Reliable and an excellent me and aendance record. Key skills: Ability to read isometric fabricaon and installing drawings, general arrangement and p&id drawings. Experience in large bore pipe fabricaon to small bore instrument pipe work. Working on materails such as carbon steel, stainless steel, duplex, super duplex. Excellent communicaon skills at all levels, great understanding of health and safety regulaons on site and fabricaon environment. Qualificaons: Australian cert III Engineering - Fabricaon Trade (Heavy Fabricaon ) 1 year at Scosh power training scheme, which I obtained a mechanical engineering manufacture N.V.Q level 2. 3 year apprenceship with the E.C.I.T.B which included one year off the job training and two years on site training which I obtained city & guilds in the following : · General engineering construcon studies · Pipe work drawing and development · Pipe systems · Pipework fabricaon · Inspecon and tesng of pipe work and assemblies · Joining and installaon of pipe work · Shut down and repair Work History: BMS 4/08/14 TO DATE Henderson Working in workshop, dues included all aspects of pipe fabricaon, working on large bore carbon steel. Dues also included, giving tool box talks, pre start talks and giving pipefiers and

jaime_clement_cv_11_1_ (2)

Embed Size (px)

Citation preview

Jaime Clement42 notman way

baldivis0410219002

[email protected]

I am a fully time -served pipe fitter, experienced in both fabrication and installation. I’ve worked on lng plants, petrochemical sites, ship yards, airports and fab shops. I use my initiative and self-motivation to achieve objectives of quantity and high quality standards both alone and as a teamplayer. Reliable and an excellent time and attendance record.

Key skills:Ability to read isometric fabrication and installing drawings, general arrangement and p&id drawings. Experience in large bore pipe fabrication to small bore instrument pipe work. Working on materails such as carbon steel, stainless steel, duplex, super duplex. Excellent communication skills at all levels, great understanding of health and safety regulations on site and fabrication environment.

Qualifications:Australian cert III Engineering - Fabrication Trade (Heavy Fabrication )1 year at Scottish power training scheme, which I obtained a mechanical engineering manufacture N.V.Q level 2. 3 year apprenticeship with the E.C.I.T.B which included one year off the job training and two years on site training which I obtained city & guilds in the following :

· General engineering construction studies · Pipe work drawing and development · Pipe systems · Pipework fabrication · Inspection and testing of pipe work and assemblies · Joining and installation of pipe work · Shut down and repair

Work History:

BMS 4/08/14 TO DATE HendersonWorking in workshop, duties included all aspects of pipe fabrication, working on large bore carbon steel. Duties also included, giving tool box talks, pre start talks and giving pipefitters and

welders their tasks for the day.

APMS 23/05/14 1/08/14 Hendersonworking on small bore stainess steel 15mm-50mm

BMS 28/03/14 20/05/14 Bibra lakeMy duties included the fabrication of stainless and carbon steel pipe work for BOC,i worked off ismotetric drawing.

United Industries 20/06/13 07/01/14 Henderson WAI was based in United industries fabrication facility, my duties included fabrication of stainless steel and carbon steel pipe work, fabrication of pipe skids, units and racks for the Gorgon projectBarrow Island.

AGC 5/07/12 – 5/06/13 Kwinana My duties while working for agc was fabrication of stainless steel, carbon steel, duplex,

super duplex all spools was fabrication for gorgon island project, pipe size ranging from 20mm small bore pipe to 900mm large bore pipe! I also worked on heavy wall pipes, fabricated large trunnions and branches! fitted repads/shoes. over the space of a year I worked on a various pipespools which require angle finding/offsets and always produce a high standard of work.

CEM engineering 13/02/12 – 1/05/12 Botany SydneyMy role has included the fabrication of two stainless steel skids, pipe ranging from 8'-1'. I have been in charge of the construction of the skid from start to finish, working from isometric drawings and GA'S. I have also been in charge of assigning pipefitters and welders their daily tasks in order to complete the contract for deadline.

Lauren Lloyd 28/11/11 – 8/01/12 DubaiThe project was at Dubai International airport terminal 4, duties included working on the 60 kilometer 16’’ jet fuel pipeline that linked the new terminal directly to the International airport. Also took on a supervisor role, duties was liaising with clints, safey personel and engineering to help meet project milestones and deadlines, whist also supervising 8 pipefitters giving them there daily tasks and morning pre-start talks.

Doosin Babcocks 11/09/11 – 27/10/11 Nottingham ukWorking on Ratcliffe powerstation, employed as a leading hand, responsble for multi disaplined team, carrying out engineering services. Main duties included the fabrication erection, testing and commissioning of pipework. Duties included measuring and sketching for field changing and maintanence. All work was carried out in conjunction with contracial specifications. Occationally Employed in a super visionary position.

Rainham engineering services 29/07/11 – 25/08/11 Portsmouth/Millwall ukShutdown on Veolia incinerator and hoppers, my duties included identifying corrosive pipework and using the correct method i.e.: oxy propane burning equipment or grinding, to replace the pipework.

Tarvail Engineering 25/05/11 – 10/07/11 DartfordMy duties while working for Tarvail was the fabrication of 2 small carbon steel skids, working off isometric and GA drawings, piping up pipe work to pumps.

Matchtech 28/03/11 – 20/05/11 PortsmouthMy duties included the installation of pipework and steel work on the new build of service vessels, located in Portsmouth naval base.

Amec 2/06/10 – 7/03/11 West Burton Worked on varied parts of the site including auxiliary boiler, turbine halls cooling towers and the boilers. Duties involved all aspects of pipe fitting including working on pipe ranging from 1/2'' to 20'' pipe, installing valves, screwed pipework, punching lines out and pipe pressure testing. I alsospent the last 12 months on this job as a charge hand pipefitter. My duties as a charge hand included assigning work to each tradesman, locating, issuing and checking tools and materials, carrying out toolbox talks. Constant liaison with project managers and engineers to update on project progress.

Shanahans 10/05/10 – 30/05/10 StaythorpeWhist working on Staythorpe PowerStation my duties included the fabrication of 4’’ carbon steel lines, then the installation of pipework to pumps and piping into the desired location around the turbine halls.

Matchtech 7/03/10 – 8/05/10 PortsmouthMy duties included the installation of pipework and steel work on the new build of service vessels, located in Portsmouth naval base.

Doosan Babcock’s 1/02/10 – 22/02/10 StanlowThe job was a shutdown on stanlow refinery. My duties included renewing pipework then hydro testing systems to correct psi and keeping records in the correct procedures, then remove all blanks and spades and reinstall pipework.

GBE Services 24/09/09 – 30/01/10 KentI spent my time working for GBE at their workshop, I covered all aspects of pipe fabrication from using oxy acetylene/propane, plasma cutting. Having to use pattern development to fabricate

branches and trunions, use trigonometry to find angles and travels. We used 3d drawings as wellas isometric drawings to help with fabrication.

Fabricom Suez 7/09/09 – 23/09/09 ImminghamDuring this time I worked for fabricom, I was based in their Immingham fab shop.

Rainham engineering services 2/07/09 – 24/07/09 PortsmouthShutdown on Veolia incinerator and hoppers. GBE Services 8/01/09 – 1/07/09 KentI spent my time working for GBE at their workshop..

Fabricom Suez 1/10/07 – 30/12/08 Isle of Grain This project was on a new build LNG plant.

Shaw Group 24/09/07 – 28/09/07 WiltonWorking on Wilton bioethanol plant, quick shutdown to replace some damaged carbon steel pipes and pipe supports.Amec 5/09/07 – 24/09/07 WiltonShutdown on ICI chemical works.

Alstom 14/07/07 – 30/08/07 AberthawShutdown on Aberthaw PowerStation.

Shaw Group 12/03/07 – 11/07/07 BromboroughWorking in the fabrication shop in bromborough.

Amec 15/01/07 – 9/03/07 GrimsbyWorking in Grimsby, on Norvartis.

Fabricom Suez 6/11/06 – 12/01/07 Immingham I was based in the fab shop in Immingham.

PSL 24/09/06 – 1/11/06 NewcastleWorking in south shields A&P ship yard ,working on a floating oil rig.

Alstom 14/08/06 – 20/09/06 KentWorked at Kingsnorth PowerStation.

Fabricom Suez 27/03/06 – 27/07/06 EasingtonWorking in Easington gas terminal a new build LNG.

MPI Engineering 25/01/06 – 28/02/06 FinlandWorking over in Finland on the Freedom of the seas cruise liner.

Shaw Group 8/08/05 – 21/01/06 Runcorn/BarrowWorking on Runcorn i.c.i.

Fabricom Suez 18/04/05 – 3/08/05 RuncornWorking on Ineos Chlor boiler project

Laker-vent Engineering 1/09/02 – 15/04/05 During the first couple of years at lakers I was still a apprentice, so I was placed with a tradesmanin the fabrication shop