11
Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter‑Laboratory Exercise Validation Exercise at AVL MTC

Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

Embed Size (px)

Citation preview

Page 1: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

Jan Gåsste, AVL MTCHua Lu-Karlsson, ScaniaLondon, 2009-03-30

PMP Heavy-Duty Inter‑Laboratory Exercise Validation Exercise at AVL MTC

Page 2: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

2Jan Gåsste, AVL MTC, 2008.08.20

Background

Test Setup

Results

Summary

Validation Exercise at AVL MTC

Page 3: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

3Jan Gåsste, AVL MTC, 2008.08.20

This study is a part of the PMP Validation Program and it is financed by the Swedish Road Administration.

The validation program stipulated the use of both full flow and partial flow systems.

Three different PMP-systems were used for PN measurements at our location.

Background

Page 4: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

4Jan Gåsste, AVL MTC, 2008.08.20

Test Setup

APC 489 AVL MTC’s

Extra Instrument 4m

he

ate

d li

ne

47

°C

263 cm

301cm

791cm

dilution tunnel

HEPALEPAact. carbon

Dilution air

PM47±5°C

50 lpm

25 lpm

72m3/min

HEPA

Primary dilution tunnel

TX40 47mm

CRT

ENGINE

500 cm (50 c m)

SPCS-19 Golden Instrument 1

30

cm

(8

cm

)

AVL SPC 472 Partial Flow System

SPCS-20 Golden Instrument 2

Page 5: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

6Jan Gåsste, AVL MTC, 2008.08.20

ResultsPM Emission Measurement

0

0.001

0.002

0.003

0.004

0.005

0.006

0.007

0.008

WHTC cold WHTC warm WHSC ETC ESC

PM

em

issi

on

s (g

/kW

h)

PM-CVS PM-Partial Flow

y = 0,3283x + 0,0008

R2 = 0,2633

0,000

0,001

0,002

0,003

0,004

0,005

0,000 0,001 0,002 0,003 0,004 0,005 0,006 0,007 0,008

CVS PM emissions (g/kWh)

Pa

rtia

l flo

w s

yste

m P

M e

mis

sio

ns

(g/k

Wh

)

Page 6: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

7Jan Gåsste, AVL MTC, 2008.08.20

1,E+03

1,E+05

1,E+07

1,E+09

1,E+11

1,E+13

WHTC cold WHTC warm WHSC ETC ESC

Fu

ll flo

w a

nd

pa

rtia

l flo

w s

yste

m P

N e

mis

sio

ns

(#/k

Wh

)

Full flow Partial flow system

21 %

-43 %

-46 % -52 %

-13 %

ResultsPN Emission Measurement with the Golden Instruments

y = 1,2121x - 6E+09

R2 = 0,9993

0

2E+11

4E+11

6E+11

8E+11

0 2E+11 4E+11 6E+11 8E+11

CVS PN emissions (#/kWh)

Pa

rtia

l flo

w s

ys

tem

PN

em

iss

ion

s (

#/k

Wh

)

Page 7: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

8Jan Gåsste, AVL MTC, 2008.08.20

1,E+03

1,E+05

1,E+07

1,E+09

1,E+11

1,E+13

WHTC cold WHTC warm WHSC ETC ESC

PN

em

issi

on

s (#

/kW

h)

Golden APC

40%

33%

27%28%31%

Results: PN Emission Measurement with SPCS 19 & APC489 from CVS

y = 1,3967x - 9E+08

R2 = 0,9998

0

2E+11

4E+11

6E+11

8E+11

1E+12

0 1E+11 2E+11 3E+11 4E+11 5E+11 6E+11 7E+11

CVS Golden instrument PN emissions (#/kWh)

CV

S A

PC

PN

em

issi

on

s (#

/kW

h)

Page 8: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

9Jan Gåsste, AVL MTC, 2008.08.20

Results: On Line PN Emission Measurements in cold WHTC test with all instruments

1.E+00

1.E+01

1.E+02

1.E+03

1.E+04

1.E+05

1.E+06

0 200 400 600 800 1000 1200 1400 1600 1800

Time (s)

Par

tical

num

ber

emis

sion

s fr

om a

col

d W

HT

C t

est

(#/c

m3)

SPCS-19 SPCS-20 APC

Page 9: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

10Jan Gåsste, AVL MTC, 2008.08.20

Results: On Line PN Emission Measurements in the ESC test with all instruments

1,E+00

1,E+01

1,E+02

1,E+03

1,E+04

1,E+05

0 200 400 600 800 1000 1200 1400 1600

Time (s)

Pa

rtic

le n

umb

er e

mis

sion

s fr

om a

ES

C t

est

(#/c

m3)

SPCS-19 SPCS-20 APC

Idle

Page 10: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

11Jan Gåsste, AVL MTC, 2008.08.20

• WHSC showed lower PN-emissions compared to ESC and the ETC showed lower emissions than both the warm and the cold WHTC

• The Full Flow System showed higher PM-emissions compared to the partial flow system and poor correlation between the two sampling systems at this low PM levels.

• The Full Flow System showed higher PN-emissions compared to the partial flow system for all cycles except the cold WHTC and good correlation between the two sampling systems.

• Good correlation was shown between the Golden Instrument and our extra APC489 system.

• The online data had a similar trace independent of the manufacturer of the PMP-system. This indicates that the PMP method is robust.

Summary / Conclusions

• PM emissions generally very low with the tested engine.

Page 11: Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, 2009-03-30 PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC

12Jan Gåsste, AVL MTC, 2008.08.20

Questions?

Don’t hesitate to contact…

Jan GåssteCOOAVL MTCP.O. Box 223, SE-136 23 HaningeSweden

Phone: +46 8 500 656 00Direct: +46 8 500 656 90Fax: +46 8 500 283 28E-mail: [email protected] page: www.avl.com/mtc