9
January 24, 2011 January 24, 2011 1 Update to CCAQS PC Update to CCAQS PC Final Projects for Final Projects for CCOS & CRPAQS CCOS & CRPAQS

January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

Embed Size (px)

Citation preview

Page 1: January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

January 24, 2011January 24, 2011 11Update to CCAQS PCUpdate to CCAQS PC

Final Projects forFinal Projects forCCOS & CRPAQSCCOS & CRPAQS

Page 2: January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

January 24, 2011January 24, 2011 Update to CCAQS PCUpdate to CCAQS PC 22

• Studies in the region have been active for over 20 years. The rich database and large body of products from these studies have been used to effectively:– Provide a technical foundation for the SIPs;

– Improve our understanding of the nature & cause of Central California ozone and PM air pollution; and

– Improve the state-of-the-science.

• The final round of fundraising is completed. Thanks to all the stakeholders who have contributed to the success of CCOS and CRPAQS over many years!– Generous financial support from Federal-, State- and Local Government as well as

Private Industry

– Fundraising Teams

– Technical and Policy Committee representatives

• To leverage from the previous work and complete the studies with a final round of support for the upcoming SIPs, today we’re presenting a proposed list of final projects for PC consideration.

Recap of Study ProgressRecap of Study Progress

Page 3: January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

January 24, 2011January 24, 2011 Update to CCAQS PCUpdate to CCAQS PC 33

• ARB and SJV district staff worked together on the final list of high priority projects, which focus on information needed to develop SIPs for anticipated new ozone & PM2.5 standards

• Time is of the essence:

– SIP deliverables needed in 2012

– Federal Funds Expire June 30, 2012

– All contracts to be initiated by June 1, 2011

Final PhaseFinal Phase

Page 4: January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

January 24, 2011January 24, 2011 Update to CCAQS PCUpdate to CCAQS PC 44

Proposed Final ProjectsProposed Final ProjectsPROJECT TOTAL SPONSOR

1* Develop a CCOS-Domain Agricultural Sector Emissions Method $350,000 CCOS

2* Develop an Economic Scenario Tool for the SJV Region $250,000 CCOS

3* Evaluate New Heavy Duty Truck Control Technologies $125,000 CCOS

4* Locate Web Cameras to Support Exceptional Event Findings $100,000 CRPAQS

5*Review Current Methods for Allocating Average-Day Mobile Sources

Emissions to Weekend Days $50,000 CCOS

6*Review- and Rewrite ARB Computer Code that is Proposed for Data

Gap Imputation $10,000 CCOS

7Assess Various PM-10 and Ammonia Emissions Control Measures in

Dairy Corrals $132,500  CRPAQS

8* Ozone background analysis $50,000 CCOS

9* Rural NOx incorporation to the ozone model $100,000 CCOS

10* Improvement of PM2.5 mass reconstruction assumptions $100,000 CRPAQS

* New project concept

** Augmentation or potential augmentation to an existing contract

Page 5: January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

January 24, 2011January 24, 2011 Update to CCAQS PCUpdate to CCAQS PC 55

(continued)(continued)PROJECT TOTAL SPONSOR

11* Evaluation of VOC artifact and VOC nitrate and SOA predictions $100,000 50/50

12**Additional synthesis for NOx and SOx precursor effects on PM2.5

and Ozone $100,000 50/50

13Improve PM2.5 Inventory Methods to Better Reconcile Emission

Estimates with Ambient Measurements $250,000 CRPAQS

14Review, Develop, and Evaluate Improved Approaches for

Corroborative- & Weight-of-Evidence Analyses $130,000 CCOS

15Prepare and Publish CCOS Summary Document, Scientific Papers,

Final Synthesis Document and Hold a CCOS Conference $60,000 CCOS

16Improve Characterization of Wildfire Emissions to Support

Exceptional Event Findings $120,000 CCOS

17**Collection- and Analysis of Upwind Ozone Precursor Measurement

Data at Denverton, California (existing contract augmentation) $50,000 CCOS

18Chemical Speciation of PM Samples from 2 Urban Monitoring

Locations in the SJV for 1 Year $60,000 CRPAQS

* New project concept

** Augmentation or potential augmentation to an existing contract

Page 6: January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

January 24, 2011January 24, 2011 Update to CCAQS PCUpdate to CCAQS PC 66

(continued)(continued)PROJECT TOTAL SPONSOR

19Chemical Speciation of PM Samples from 1 Rural Monitoring

Location in the SJV for 1 Year $75,000 CRPAQS

20Establish Account for Administrative Expenses & Auditing

Purposes $50,000 CCOS

21 Improve Emission Estimates for Ammonia $75,000 CRPAQS

22Develop Information to Support Feasibility Studies Identified in SJV

and SMAQMD Ozone SIPs $151,000 CCOS

23* District SIP development support project(s) $300,000 CCOS

24**Investigate Seasonal and Annual Prognostic Meteorological Model

Performance (Phase II) $100,000 50/50

TOTAL $2,888,500

* New project concept

** Augmentation or potential augmentation to an existing contract

Page 7: January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

January 24, 2011January 24, 2011 Update to CCAQS PCUpdate to CCAQS PC 77

• TC Recommendations to the PC (11/13/2008):

– Develop Improvements to the Spatial and Temporal Allocation of Mobile Source Emission Estimates;

– Develop Improvements to Construction Equipment Emission Estimates; and

– Establish Funding for Computer Equipment and Support.

• Characterization of Seasonal Trucking and Weekend Day Emissions (Projects N3 and N9).

• Re-Investigate the September 2000 Episode (Project N12).

• Web Access of Modeling Results (Project III-14).

Previous Project Concepts Proposed for Replacement

Page 8: January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

January 24, 2011January 24, 2011 Update to CCAQS PCUpdate to CCAQS PC 88

• Equipment Funds

– ‘CCOS Computer Account’

– CRPAQS ‘ARB Computer Equipment Fund’

– ‘CCOS Equipment Account’ (reduce to $75k)

•  Expired Contracts

– Contract 06-2CCOS. This is a curtailed contract with Sonoma Technology that has expired.

Account Balances to Release to Account Balances to Release to CCOS/CRPAQS General FundCCOS/CRPAQS General Fund

Page 9: January 24, 2011 1 Update to CCAQS PC Final Projects for CCOS & CRPAQS

January 24, 2011January 24, 2011 Update to CCAQS PCUpdate to CCAQS PC 99

Available FundsAvailable Funds

Combined CCOS CRPAQS

TOTAL FUNDS AVAILABLE (August 31, 2010 Financial Statements) $2,962,286 $2,087,614 $874,672

       

Total Estimated Funds for Proposed Projects $2,888,500 $1,946,000 $942,500

Contingency for Repairs of Deployed Equipment (Profilers, etc)(CCOS Equipment Account) $75,000 $75,000  

TOTAL PROPOSED PROJECTS PLUS CONTINGENCY $2,963,500 $2,021,000 $942,500

       

TOTAL REMAINING FUNDS -$1,214 $66,614 -$67,828