Jigs and procedure for ladder assembly BelleIInote #8. 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo. Updates. Design of ladder assembly jigs for layer 6 Forward DSSD(trapezoidal) assembly Backward DSSD(rectangle) assembly Booting new lab for the assembly in IPMU. Equipment - PowerPoint PPT Presentation
Citation preview
Jigs and procedure for ladder assemblyBelleIInote #8
6th Feb 2012Yoshiyuki Onuki
University of Tokyo
1
Updates
• Design of ladder assembly jigs for layer 6- Forward DSSD(trapezoidal) assembly- Backward DSSD(rectangle) assembly• Booting new lab for the assembly in IPMU. - Equipment- Handling jigs
2
Assembly flow
3
Forward part assembly
Backward part assembly
Origami part Backward part Forward part
Gluing ddge DSSD on the ribs
Placing all DSSDs on the assembly bench
Origami assembly
Gluing Origami part on the ribs
Origami PA assembly
t
Placing all DSSDs on the assembly bench
4
Forward part assembly
Backward part assembly
Origami part Backward part Forward part
Gluing ddge DSSD on the ribs
Placing all DSSDs on the assembly bench
Origami assembly
Gluing Origami part on the ribs
Origami PA assembly
t
=>Please refer B2note and past B2GM slides
Assembly-bench and Rib-jig
55
Linear bush
Assembly-bench
Linear bush pin
Rib-jig
6
Combining Assemby-bench and Rib-jig
7
Placing aligned backward DSSD
8
Placing aligned backward DSSD(rec.)
9
Placing aligned Origami DSSD(left)
10
Placing aligned Origami DSSD(left)
11
Placing aligned Origami DSSD(mid)
12
Placing aligned Origami DSSD(mid)
13
Placing aligned Origami DSSD(right)
14
Placing aligned Origami DSSD(right)
15
Placing aligned forward DSSD(tra.)
16
Placing aligned forward DSSD(tra.)
17
Picking up forward DSSD(tra.)
18
Picking up forward DSSD(tra.)
19
Picking up backward DSSD(rec.)
20
Picking up backward DSSD(rec.)
21
Picking up backward DSSD(rec.)
Forward part assembly
22
Forward part assembly
Backward part assembly
Origami part Backward part Forward part
Gluing ddge DSSD on the ribs
Placing all DSSDs on the assembly bench
Origami assembly
Gluing Origami part on the ribs
Origami PA assembly
t
23
Picked up backward DSSD(rec.)
Placing hybrid board
24
Gluing PE1 and wire bonding
25
26
Flipping DSSD with another jig
Flipping DSSD with another jig
27
Remove 1st jig
28
Gluing PE2 and wire bonding
29Then, readout of slant part is completed
Gluing edge DSSD on the ribs
30
Forward part assembly
Backward part assembly
Origami part Backward part Forward part
Gluing edge DSSD on the ribs
Placing all DSSDs on the assembly bench
Origami assembly
Gluing Origami part on the ribs
Origami PA assembly
t
Jig for gluing slant DSSD.
31
goniometer
Rotation axisRotation axis
Slant DSSD is chucked here
Edge of slant DSSD will sit on here.Þ The edge doesn’t move after the rotation.Þ Precise alignment of slant DSSD can be done in the horizontal plane on the assembly-benchÞ This jig can be applied for not only L6 but also L4,L5 ladder assembly.
Picking up forward(slant) part
32
Picking up with gluing jig
33
Picking up with gluing jig
34
Picking up with gluing jig
35
Replacing sensor supports with rib support on the rib-jig
36
Replacing sensor supports with rib support on the rib-jig
37
Replacing sensor supports with rib support on the rib-jig
38
Replacing sensor supports with rib support on the rib-jig
39
Placing ribs on the rib-jig
40
Gluing forward(slant) sensor on the ribs
41
Rotating goniometers to fit the slant angle and gluing
42
With the same way,we can applied for the backward DSSDmuch more easier(since w/o gonio rotation)
Gluing edge DSSD on the ribs is finished
43
Origami assembly
44
Forward part assembly
Backward part assembly
Origami part Backward part Forward part
Gluing edge DSSD on the ribs
Placing all DSSDs on the assembly bench
Origami assembly
Gluing Origami part on the ribs
Origami PA assembly
t
Airex jig
45Stopper for rohacell can be used for alignment
Holes for stopper position
Gluing Rohacell
46
Origami PCB jig(Long)
47
Origami PCB jig(Short)
48
Gluing (Long)Origami PCB
49
Gluing (Short)Origami PCB
50
Gluing (Short)Origami PCB
51
52
Gluing Origami part on the ribs
53
Forward part assembly
Backward part assembly
Origami part Backward part Forward part
Gluing edge DSSD on the ribs
Placing all DSSDs on the assembly bench
Origami assembly
Gluing Origami part on the ribs
Origami PA assembly
t
Placing Origami part on the ribs
54
Gluing Origami part on the ribs
55
Picking up the ladder.
56Pulled out rib-mount through the jig. Assembly completed.
Pins
Rib-mount has the linear bush holes at back-side.
IPMU(Institute for the Physics and Mathematics of the Universe)
57
KEK
IPMU
Akihabara
Booting Lab for the assembly in IPMU.
• Automatic wire bonding machine(REBO-7S, Ultrasonic engneering Co., Ltd. ) will be delivered.
• Wire bond pull tester(Dage4000+)• Clean room(4×8m2) in class 1000.• 3D vision measuring machine which can cover
L6(Mitsutoyo, QV Apex 606, 600×650×250mm).• Glue dispenser• Some rigid tables and microscopes…• Mechanical and electorical QA system.
58
Handling assembly jigs
950mm800mm 820mm
Wire-bonder Table 3D measuring machine
• Weight of the most heaviest jig(L6Assembly bench) is about 11kg(Al).• The size is 900mm×200mm×30mm• Difficult to lift up and move on by man power
Floor
Handling assembly jigs
950mm800mm 820mm
Wire-bonder Table 3D measuring machine
• Weight of the most heaviest jig(L6Assembly bench) is about 11kg(Al).• The size is 900mm×200mm×30mm• Difficult to lift up and move on by man power • Use the Z-stages and forklift.
Z-stages
Forklift
Floor
Summary• Somehow method to assemble forward(slant) part
become much more concrete method.- Forward and backward part (DSSDs w/ hybrid board) will
be assembled and glued on the ribs at first.- The after, straight(Origami) part will be glued on the ribs.- The jigs can be used for the other layer assembly.- The design of jigs will be finish soon.• Lab for ladder assembly in IPMU- Most of the quipment will be delivered in end of March.
61
Plan
• L6 assembly-bench and rib-jig will be delivered by end of March. The other jigs will be delivered in April.
• The other equipment for full ladder assembly also will be delivered by end of March.
• Mockup production can be started soon after delivering of jigs since no wire-bonding.
• Some tuning and training is needed before the first ladder assembly for L6. The most concern is wire bonding(optimizing bonding parameters, automating, bonding QA…).
62