Jim Hill Nuclear Management Company
Nuclear Plant Operation under NRC Reactor Oversight Program
Prairie Island Nuclear Generating Plant Safe – Reliable – Predictable –
Leader
1
Spectrum of Performance
StakeholderValue
Customer &RegulatorPerception
Managementand Employee
Skills andCulture
ProcessCycle Time
ProcessQuality
Safe, Reliable,Cost-Effective
Generation
Management Vision & Stra tegyNuclear Generation will remain a long-te rm
reliable provider of electr icity at acompetitive price
Process ManagementSet Performance Goals. Use measures to assess
whether per formance is meeting goals. Useinformation to improve process.
Culture of Learning/ImprovementManagement and personnel skills and a ttitudes
suppor t conservative decision-making andperformance assessment. Culture makes data-based decisions and uses process management
for continuous improvement.
LaggingResults
LeadingIndicators
NRC - Focused on Safety of Operations
Adapted from: EED-99-01 Recommendations for the Implementation of Selected Leading Indicators of Performance at Nuclear Power Production Plants, ASQ, 1999
Recognition of Need to Improve • NRC performance determination previously
implemented by Systematic Assessment of Licensee Performance (SALP)
• In late 1994 NRC conducted in-depth review of SALP process. Issues noted:– Lagging…consequences initiated late, sometimes after
performance decline had already been turned– Inconsistent regulatory response– Determination sometimes driven by upper
management bias with incomplete data
Bottom Line: The process the NRC used to determine licensee performance needed to be more effective
Developed with input from plant owners/operators, facilitated by NEI
• Baseline Inspection– Finding Significance Determination Process (Green Red)
• Performance Measures – Performance thresholds established (Green Red)– Reported on a quarterly basis
• Measures “rolled up” with inspection results for periodic performance assessment
• Regulatory Response matrix– Additional and more intrusive Inspection– Continued degradation in performance leads to shut down
Piloted at 8 nuclear plants prior to full industry use
Revised Reactor Oversight Process
Positive Results• Industry Performance in areas measured has improved• Rigorous process for performance measures
– Ensure current measures are adequate and provide value
• Predictable Regulator Action – Data Driven
• Accuracy of performance data has improved– Problems found early on in data reporting– NRC cannot accomplish performance-based oversight without
accurate data…poor reporting is serious issue
• Periodic review and improvement to ROP is ongoing. – Moving to a new set of equipment performance measures– Adequacy of Security and facility protection from external
threat continues to be a priority
Example – Hypothetical Nuclear Site
NRC ROP Indicators – 2nd Quarter 2005
Initiating Events
Mitigating Systems
Barrier Integrity
Emergency Preparedness
Occupational Radiation
Safety
Public Radiation
SafetyPhysical
Protection
Unplanned ScramsEmergency AC Power System
Reactor Coolant System Activity
Drill/Exercise Performance
Occupational Exposure Control
RETS/ODCM Radiological
EffluentProtected Area
Equipment
Scram with Loss of Normal Heat
RemovalHigh Pressure Safety
InjectionReactor Coolant System Leakage
ERO Drill Participation
Personnel Screening Program
Unplanned Power Changes
Auxiliary Feedwater System
Alert and Notification System
FFD/Personnel Reliability
Residual Heat Removal System
Safety System Functional Failures
2Q/2005 (Projected) G No Findings This
Quarter G No Findings This
Quarter
No Findings This
Quarter
No Findings This
Quarter
1Q/2005No Findings This
Quarter
No Findings This
Quarter G No Findings This
Quarter
No Findings This
Quarter
No Findings This
Quarter
4Q/2004No Findings This
Quarter
No Findings This
Quarter G No Findings This
Quarter
No Findings This
Quarter
No Findings This
Quarter
3Q/2004No Findings This
Quarter G No Findings This
Quarter
No Findings This
Quarter
No Findings This
Quarter
No Findings This
Quarter
2Q/2004 G G G No Findings This
Quarter
No Findings This
Quarter
No Findings This
Quarter
Current Action MatrixColumn
-Licensee Response
INSPECTION FINDINGS
REACTOR SAFETY
2nd QUARTER PERFORMANCE INDICATORS
RADIATION SAFETY SAFEGUARDS
Human P erformance Safety Conscious Work Environment P roblem Identification & Resolution
No Substantive Cross-Cutting Issues No Substantive Cross-Cutting Issues No Substantive Cross-Cutting Issues