BBK/A&E., P.L.L.C.
10035 N. 177th East Ave.
Catoosa, OK 74015 Owasso, OK 74055-7841
PSA No. 15E0472.01 918-798-59797/24/2015
ITEM
NO.
SPEC
NO.DESCRIPTION UNIT
1 201(A) CLEARING AND GRUBBING LSUM 1
2 202(A) UNCLASSIFEID EXCAVATION CY 5,657
3 202(D) UNCLASSIFIED BORROW (INCL. IMPORT AND HAUL) CY 9,973
4 220 SWP3 DOCUMENTATION AND MANAGEMENT LSUM 1
5 221(C) TEMPORARY SILT FENCE LF 240
6 230(A) SOLID SLAB SODDING SY 680
7 232(A) SEEDING METHOD A AC 1
8 233(A) VEGETATIVE MULCHING AC 1
9 311 LINEAR GRADING (EXIST. GRAVEL ROAD) LF 130
10 310(B) SUBGRADE METHOD B SY 5,054
11 325 SEPARATOR FABRIC SY 4,515
12 804 CONC. LIGHT POLE BASE (POLE BY OG&E, N.I.C.) EA 4
13 508 CONCRETE TROUGH AND HEADWALL LSUM 1
14 601(A) TYPE 1 PLAIN RIPRAP TON 35
15 602(C) FILTER FABRIC SY 62
16 609(B) 2'-2" CURB AND GUTTER (6" BARRIER) LF 2,236
17 613(A) 15" RCP (CLASS III) PIPE LF 90
18 613(M) 15" RCP END SECTION EA 2
19 613(A) 18" RCP (CLASS III) PIPE LF 36
20 613(M) 18" RCP END SECTION EA 2
21 613(V) TRENCH EXCAVATION INCL. AGG BACKFILL CY 56
22 615(B) 4" PVC SEWER SERVICE, EACH EA 30
23 615(A) 8" PVC SEWER LINE, INCL. T & B LF 1,234
24 611(A) 4' DIA. MANHOLE W/ CONC COLLAR EA 4
25 615(A) 3" PVC FORCE MAIN - INCL. T & B LF 405
26 615 8" X 3" WYE ON EXISTING SEWER LSUM 1
27 N/A LIFT STATION W/APPURTENANCES LSUM 1
28 616(B) 8" PVC WATER PIPE, INCL. T & B LF 1,972
29 616(G) FIRE HYDRANT EA 2
30 616 PRESSURIZED CONNECTION TO EXIST. WTR (COMPLETE) EA 2
31 616(D) 8" GATE VALVE W/BOX EA 7
32 616 8" VERTICAL BEND W/BLOCKING EA 4
33 616 TEE OR CAP W/BLOCKING EA 4
34 616(F) 5/8" WATER SERVICE LEADER, METER, SETTER, AND BOX EA 30
35 N/A 6" SCH 40 GAS CONDUIT (EMPTY) LF 90
36 624 FENCE - CEDAR 6' LF 2,730
37 641 MOBILIZATION LSUM 1
38 642 CONSTRUCTION STAKING LSUM 1
39 N/A MATERIALS TESTING (BY OWNER, N.I.C.) LSUM 0 $ 0.00 $ 0.00
40 850(A) SHEET ALUMINUM SIGNS SF 7
41 851 SIGN POST LF 10
42 N/A REMOVE POWER LINE FROM SITE (BY OG&E, N.I.C.) LSUM 0 $ 0.00 $ 0.00
BASE SUBTOTAL
******************************** BASE BID **********************************
Cherokee Nation Property Management
777 W. Cherokee St.
Jimmie Rogers III Subdivision, Vian, OK -- 30 Lots
BID BLANK
QUANTITY UNIT COST EXTENSION
Date Printed: 7/24/2015 Page 1
43 411(B) SUPERPAVE, TYPE S3 (PG 70-28 OK) TON 511
44 411(C) SUPERPAVE, TYPE S4 (PG 70-28 OK) TON 811
45 303(A) AGGREGATE BASE TYPE A CY 1,067
46 ASPHALT SUBTOTAL
47 509(B) CLASS A CONCRETE CY 662
48 303(A) AGGREGATE BASE TYPE A CY 811
49 CONCRETE SUBTOTAL
50 =
51 Cost per Lot =
OR
52 =
53 Cost per Lot =SUBTOTAL BID (CONCRETE ALTERNATE)
************************************************** PAVING ALTERNATES *****************************************************
***************** ASPHALT PAVING (IN BASE BID) ************************
***************** CONCRETE PAVING ALTERNATE ************************
SUBTOTAL BASE BID (ASPHALT)
Date Printed: 7/24/2015 Page 2
Cherokee Nation Property Management BBK/A&E., P.L.L.C.777 W. Cherokee St. 10035 N. 177
thEast Ave.
Catoosa, OK 74015 Owasso, OK 74055-7841PSA No. 15E0472.01 918-798-5979
7/24/2015
Page 1
Jimmie Rogers III Subdivision, Vian, OK – 30 LotsPay Item Descriptions
1. Clearing and Grubbing—201(A)Lump sum payment shall be full compensation for clearing of all trees, shrubs, anddeleterious materials and for burning (if allowed) or removal and environmentally-appropriate disposal off-site. Payment shall include disposal fees.
2. Unclassified Excavation—202(A)Cubic Yard payment shall be full compensation for excavation of all dirt and rockmaterial from the site, moisture conditioning or treating with lime or fly ash asneeded, and placing the same on the site in fully compacted condition. All dirtworkshall be performed in accordance with the Geotechnical Report for this project. Payquantity will be the quantity provided by the Engineer in the bid form. If anotherquantity is wished by the Contractor, such quantity shall be brought to the attentionof the Engineer and accepted by the Engineer prior to bidding.
3. Unclassified Borrow (Including import and haul)—202(D)Cubic Yard payment shall be full compensation for obtaining suitable fill materialfrom off-site, hauling the fill to the site, moisture treating as needed, and placing thesame on the site in fully compacted condition. All dirtwork shall be performed inaccordance with the Geotechnical Report for this project. Pay quantity will be thequantity provided by the Engineer in the bid form. If another quantity is wished bythe Contractor, such quantity shall be brought to the attention of the Engineer andaccepted by the Engineer prior to bidding.
4. SWP3 Documentation and Management—220The Owner has supplied the SWP3 for this project, and the Contractor shall beresponsible for its implementation, and for the on-site maintenance of the paperworkmandated therein. Lump Sum payment shall be full compensation for this task.
5. Temporary Silt Fence—221(C)Linear Foot payment shall be full compensation for the installation, removal, andmaintenance of temporary silt fence, including removal soil that may accumulateagainst the fence during the course of the Work.
6. Solid Slab Sodding—230(A)Square Yard payment shall be full compensation for installation of sod, includingsurface preparation, moisture control, and watering subsequent to and seven daysafter sod placement.
7. Seeding Method A—232(A)Per Acre payment shall be full compensation for distributing seed, including surfacepreparation, and moisture control.
8. Vegetative Mulching—233(A)Per Acre payment shall be full compensation for applying mulch.
9. Linear Grading (Existing Gravel Road)—311Linear Foot payment shall be full compensation for regrading existing gravelroadway.
Cherokee Nation Property Management BBK/A&E., P.L.L.C.777 W. Cherokee St. 10035 N. 177
thEast Ave.
Catoosa, OK 74015 Owasso, OK 74055-7841PSA No. 15E0472.01 918-798-5979
7/24/2015
Page 2
10.Subgrade Method B—310(B)Square Yard payment shall be full compensation for shaping, moisture conditioning,and compacting subgrade underneath the pavement and the curb and gutter.
11.Separator Fabric—325Square Yard payment shall be full compensation for supplying and installing fabric,including proper overlapping and nails if required.
12.Concrete Light Pole Base (Light by OG&E, N.I.C.)—804Per Each payment shall be full compensation for forming, concrete, reinforcement,conduits within the footing, placement of anchor bolts and pole (supplied by others),ground rod, backfill and compaction. Installation and connection of conductors to beperformed by others.
13.Concrete Trough and Headwall—508Per Each payment shall be full compensation for subgrade preparation, forming,concrete, reinforcement, backfill, and compaction.
14.Type 1 Plain Riprap—601(A)Per Ton payment shall be full compensation for placing the riprap on the filter fabricby machine or by hand.
15.Filter Fabric—602(C)Square Yard payment shall be full compensation for shaping and compacting thesubgrade beneath the fabric, for securing the fabric on slopes and around the edges,and for repairing torn fabric.
16.2’-2” Curb and Gutter (6” barrier)—609(B)Linear Foot payment shall be full compensation for forms (where needed), joints,and backfill and compaction behind the curb.
17.15” RCP (Class III) Pipe—613(A)Linear Foot payment shall be full compensation for joining and finishing the interiorof the pipe so that it is watertight and smooth.
18.15” RCP End Section—613(M)Per Each payment shall be full compensation for joining and finishing the pipeconnection so that it is watertight and smooth.
19.18” RCP (Class III) Pipe—613(A)Linear Foot payment shall be full compensation for joining and finishing the interiorof the pipe so that it is watertight and smooth.
20.18” RCP End Section—613(M)Per Each payment shall be full compensation for joining and finishing the pipeconnection so that it is watertight and smooth.
21.Trench Excavation, Including Aggregate Backfill—613(V)Cubic Yard payment shall be full compensation for excavation, bedding, backfillingand compacting unclassified material, as well as for supplying and installing Type AAggregate Base full-depth beneath the pavement section where the trench is underpavement.
22.4” PVC Sewer Service—615(B)
Cherokee Nation Property Management BBK/A&E., P.L.L.C.777 W. Cherokee St. 10035 N. 177
thEast Ave.
Catoosa, OK 74015 Owasso, OK 74055-7841PSA No. 15E0472.01 918-798-5979
7/24/2015
Page 3
Per Each payment shall be full compensation for the service lateral to thetermination point indicated on the plans, trenching, backfill, 8” x 4” PVC tee, andtermination marker.
23.8” PVC Sewer Pipe, Including Trench & Backfill—615(A)Linear Foot payment shall be full compensation for excavation, bedding, backfillingand compacting unclassified material, as well as for supplying and installing Type AAggregate Base full-depth beneath the pavement section where the pipe is underthe pavement. Payment shall include compensation for deflection and leakagetesting.
24.4’ Diameter Manhole with Concrete Collar—611(A)Per Each payment shall be full compensation for excavation, backfill, compaction,grouting, adjusting frame to grade, concrete collar, and leakage testing.
25.3” PVC Force Main, Including Trench & Backfill—615(A)Linear Foot payment shall be full compensation for excavation, bedding, backfillingand compacting unclassified material, as well as for supplying and installing Type AAggregate Base full-depth beneath the pavement section where the pipe is underthe pavement. Payment shall include compensation for pressure testing.
26.8” x 3” Wye on Existing Sewer—615Lump Sum payment shall be full compensation for excavation, backfill, cutting andremoval of 8” pipe, 8” pipe couplings, 8” x 3” wye, and 3” x 45° bend.
27.Lift Station with AppurtenancesLump Sum payment shall be full compensation for installation of wet well, pumps,valves, piping, control panel, electrical conductors and conduits, generator, acoustichousing, electric transfer switch, gas service connection, fencing, and gates.Equipment to be supplied by Owner in accordance with Quotation Number 2015-7-23 by Boone & Boone Sales. All labor and other materials to be supplied by theContractor.
28.8” PVC Water Pipe, Including Trench & Backfill—616(B)Linear Foot payment shall be full compensation for excavation, bedding, backfillingand compacting unclassified material, as well as for supplying and installing Type AAggregate Base full-depth beneath the pavement section where the pipe is underthe pavement. Payment shall include compensation for disinfection and pressuretesting.
29.Fire Hydrant—616(G)Per Each payment shall be full compensation for excavation, backfilling, blocking,drainage stone, 8” x 6” tee, and 6” connector pipe.
30.Pressurized Connection to Existing Water (complete)—616Per Each payment shall be full compensation for tapping sleeve and bolts, fortapping machine and tap, and for blocking.
31.8” Gate Valve with Box—616(D)Per Each payment shall be full compensation for valve box and cap, and backfill andcompaction.
32.8” Vertical Bend with Blocking—616
Cherokee Nation Property Management BBK/A&E., P.L.L.C.777 W. Cherokee St. 10035 N. 177
thEast Ave.
Catoosa, OK 74015 Owasso, OK 74055-7841PSA No. 15E0472.01 918-798-5979
7/24/2015
Page 4
Per Each payment shall be full compensation for ductile iron fitting with restraints,concrete blocking, and backfill and compaction.
33.Tee or Cap with Blocking—616Per Each payment shall be full compensation for ductile iron fitting with restraints,concrete blocking, and backfill and compaction.
34.5/8” Water Service Leader, Meter, Setter, and Box—616(F)Per Each payment shall be full compensation for trenching, backfill, compaction,corporation stop and tap, service clamp, copper service line, meter setter, and metercan.
35.6” Sch. 40 Gas Conduit (Empty)Per Linear Foot payment shall be full compensation for excavation, backfilling andcompacting unclassified material, as well as for supplying and installing Type AAggregate Base full-depth beneath the pavement section where the pipe is underthe pavement.
36.Fence – Cedar 6’—624Per linear foot payment shall be full compensation for 4 x 4 cedar posts set 3’ intoground at 8’ maximum spacing, for 2 x 4 cedar top and bottom rails, and for 1 x 6 or1 x 4 cedar fence planks.
37.Mobilization—641Lump Sum payment for mobilization shall be full compensation for Contractor’spreparatory operations.
38.Construction Staking—642Lump Sum payment for staking shall be full compensation for all staking required bythe Contractor, as well as for all re-staking caused by the Contractor’s forces.
39.Materials Testing (by Owner, N.I.C.)Paving materials and dirt subgrade and backfill shall be tested for compliance withthe Project Plans and Specifications at least as often as the frequency specified, oras directed by the Engineer or the Owner. It shall be the Contractor’s responsibilityto give timely notice to the Testing Lab when testing will be required. The Ownershall pay for testing services. The Contractor shall bear the costs for retesting untilacceptable test results are achieved.
40.Sheet Aluminum Signs—850(A)Per Square Foot payment shall be full compensation for sign and attachmenthardware.
41.Sign Post—851Per Linear Foot payment shall be full compensation for setting post.
42.Remove Power Line from Site (by OG&E, N.I.C.)OG&E power company shall remove the existing overhead electric lines from thesite and extend them underground in easements provided by the Owner. TheContractor shall coordinate its activities with OG&E so as to minimize conflicts. Noseparate payment shall be made for this service.
43.Superpave, Type S3 (PG 70-28 OK)—411(B)Per Ton payment shall be full compensation for supplying and installing Superpaveas specified.
Cherokee Nation Property Management BBK/A&E., P.L.L.C.777 W. Cherokee St. 10035 N. 177
thEast Ave.
Catoosa, OK 74015 Owasso, OK 74055-7841PSA No. 15E0472.01 918-798-5979
7/24/2015
Page 5
44.Superpave, Type S4 (PG 70-28 OK)—411(C)Per Ton payment shall be full compensation for supplying and installing Superpaveas specified.
45.Aggregate Base Type A—303(A)Per Cubic Yard payment shall be full compensation for supplying and installingAggregate Base under curbs and pavement to the thickness specified.
47.Portland Cement Concrete Pavement—414(A)Per Cubic Yard payment shall be full compensation for supplying and installing PCCPavement as specified. Substandard concrete due to improper materials orworkmanship shall not be compensated at full price by the Owner.
48.Aggregate Base Type A—303(A)Per Cubic Yard payment shall be full compensation for supplying and installingAggregate Base under curbs and pavement to the thickness specified.
NOTE:All Contractor costs for completion of this project, including overhead and incidentalitems, shall be included in the costs for the listed pay items. No additionalcompensation shall be made for other costs not listed, but incurred by the Contractor(unless there is a change in the scope due to unforeseen conditions or acts of God.)
Typical Installation
WG30, WG50, WG30H, WG50H and WG75H48" Duplex Grinder Pump Package
with Remote Mounted Control Panel
Notes: Intermediate Rail Support Required for Basins Over 16 Feet Additional Top Holddown Must Be Used for Basins Over 16 Feet
(Models B20RO-4872 thru B20RO-48192)
ES-2278B | © 2013 Pentair Ltd. | 07/10/13
Image used for illustration purposes only
SP
EC
SH
EET
1 OF 5
STANDBY POWER RATING
QT025A | 2.4L | 25 kWINDUSTRIAL SPARK-IGNITED GENERATOR SETEPA Certified Stationary Emergency
25 kW, 31 kVA, 60 Hz
Generator Set
PROTOTYPE & TORSIONALLY TESTED PROVIDES A PROVEN UNIT
UL2200 TESTED ENSURES A QUALITY PRODUCT
RHINOCOAT PAINT SYSTEM IMPROVES RESISTANCE TO ELEMENTS
Engine
EPA COMPLIANT ENVIRONMENTALLY FRIENDLY
INDUSTRIAL TESTED, GENERAC APPROVED ENSURES INDUSTRIAL STANDARDS
POWER-MATCHED OUTPUT ENGINEERED FOR PERFORMANCE
INDUSTRIAL GRADE IMPROVES LONGEVITY AND RELIABILITY
Alternator
TWO-THIRDS PITCH ELIMINATES HARMFUL 3RD HARMONIC
LAYER WOUND ROTOR & STATOR IMPROVES COOLING
CLASS H MATERIALS HEAT TOLERANT DESIGN
DIGITAL 3-PHASE VOLTAGE CONTROL FAST AND ACCURATE RESPONSE
Controls
ENCAPSULATED BOARD W/ SEALED HARNESS EASY, AFFORDABLE REPLACEMENT
4-20mA VOLTAGE-TO-CURRENT SENSORS NOISE RESISTANT 24/7 MONITORING
SURFACE-MOUNT TECHNOLOGY PROVIDES VIBRATION RESISTANCE
ADVANCED DIAGNOSTICS & COMMUNICATIONS HARDENED RELIABILITY
Features Benefits
EPA Emissions Compliance Stationary Emergency
EPA Emissions Engine Reference See Emissions Data Sheet
Cooling System
Cooling System Type Pressurized Closed
Water Pump Flow -gpm 11
Fan Type Pusher
Fan Speed (rpm) 2150
Fan Diameter mm (in) 457 (18)
Coolant Heater Wattage 1500
Coolant Heater Standard Voltage 120 VAC
Fuel System
Fuel Type Natural Gas, Propane Vapor
Carburetor Down Draft
Secondary Fuel Regulator Standard
Fuel Shut Off Solenoid Standard
Operating Fuel Pressure (Standard) 5” - 14” H2O*
Engine Electrical System
System Voltage 12 VDC
Battery Charging Alternator (Amps) 30
Battery Size See Battery Index 0161970SBY
Battery Voltage 12 VDC
Ground Polarity Negative
ALTERNATOR SPECIFICATIONS
Standard Model 390mm
Poles 4
Field Type Revolving
Insulation Class - Rotor H
Insulation Class - Stator H
Total Harmonic Distortion <5%
Telephone Interference Factor (TIF) <50
Load Capacity - Standby 100%
Standard Excitation Brush Type
Bearings Sealed Ball
Coupling Flexible Disc
Prototype Short Circuit Test Yes
Voltage Regulator Type Full Digital
Number of Sensed Phases 3
Regulation Accuracy (Steady State) ±0.25%
Connecting Rods Forged
Cylinder Liners No
Ignition High Energy
Electronic
+/- 0.25%
Number of Main Bearings 5
Make Generac
Cylinder # 4
Type In-line
Displacement - L (cu In) 2.4
Bore - mm (in) 86.61 (3.41)
Stroke - mm (in) 100.08 (3.94)
Compression Ratio 9.5:1
Intake Air Method Nuturally Aspirated
Cylinder Head Aluminum
Piston Type Aluminum Alloy
Crankshaft Type Cast
Engine Governing
Governor
Frequency Regulation (Steady State)
Lifter Type Overhead Cam
Intake Valve Material Steel Alloy
Exhaust Valve Material Hardened Steel
Hardened Valve Seats yes
ENGINE SPECIFICATIONS
General
QT025A | 2.4L | 25 kWINDUSTRIAL SPARK-IGNITED GENERATOR SETEPA Certified Stationary Emergency
2 OF 5
APPLICATION AND ENGINEERING DATA
SP
EC
SH
EET
Lubrication System
Oil Pump Type Gear
Oil Filter Type Full-Flow sping-on Cartridge
Crankcase Capacity - L (qts) 3.8 (4)
*Fuel pressure must remain within specified range and not drop more than 1in. w.c from static (no-load) to full load.
CODES AND STANDARDS COMPLIANCE (WHERE APPLICABLE)
NFPA 99 BS5514
NFPA 110 SAE J1349
ISO 8528-5 DIN6271
ISO 1708A.5 IEEE C62.41 TESTING
ISO 3046 NEMA ICS 1
UL2200
Rating Definitions:Standby – Applicable for a varying emergency load for the duration of a utility power outage with no overload capability. (Max. load factor = 70%)
Propane Vapor
Propane Vapor - ft/hr (m/hr)
POWER RATINGS
Natural Gas
25 kW Amps:
25 kW Amps:
25 kW Amps:
25 kW Amps:
Percent Load
25%
50%
75%
100%
Natural Gas - ft/hr (m/hr)
Percent Load ft3/hr
25%
50%
75%
100%
* Fuel supply installation must accommodate fuel consumption rates at 100% load.
Single-Phase 120/240 VAC @1.0pf
Three-Phase 120/208 VAC @0.8pf
Three-Phase 120/240 VAC @0.8pf
Three-Phase 277/480 VAC @0.8pf
FUEL CONSUMPTION RATES*
COOLING
sKVA vs. Voltage Dip
480 VAC 208/240 VAC
Alternator kW 10% 15% 20% 25% 30% 35% 10% 15% 20% 25% 30% 35%
Standard
Amps:
Amps:
Amps:
Amps:
STARTING CAPABILITIES (sKVA)
Standby
Air Flow (inlet air combustion and radiator) ft3/min (m3/min)
System Coolant Capacity gal (Liters)
Heat Rejection to Coolant BTU/hr
Max. Operating Ambient Temperature ºF (ºC)
Max. Ambient Temperature ºF (ºC)
Maximum Radiator Backpressure in H2O
Deration – Operational characteristics consider maximum ambient conditions. Derate factors may apply under atypical site conditions. Please consult a Generac Power Systems Industrial Dealer for additional details. All performance ratings in accordance with ISO3046, BS5514, ISO8528 and DIN6271 standards.
Standby
Flow at Rated Power cfm (m 3/min) 70
Standby
Rated Engine Speed rpm 1800
Horsepower at Rated kW** hp 40
Piston Speed ft/min
BMEP psi
** Refer to “Emissions Data Sheet” for maximum bHP for EPA and SCAQMD permitting purposes.
Standby
Exhaust Flow (Rated Output) cfm (m 3/min) 220 (6.2)
inHg (Kpa) 1.5 (5.1)
Exhaust Temp (Rated Output - post silencer) ºF (ºC) 975 (524)
Exhaust Outlet Size (Open Set) mm (in) 63.5 (2.5)
1182
120
Max. Backpressure (Post Turbo)
COMBUSTION AIR REQUIREMENT
ENGINE EXHAUST
104
87
75
38
104
87
75
38
140
220
300
380
1500 (42.48)
2.5 (9.46)
95,000
122 (50)
104 (40)
0.5
QT025A | 2.4L | 25 kW
3 OF 5
OPERATING DATA
SP
EC
SH
EET
INDUSTRIAL SPARK-IGNITED GENERATOR SETEPA Certified Stationary Emergency
25 16 25 33 41 49 57 12 19 25 31 37 43
ft3/hr
56
87
119
151
m3/hr
3.9
6.2
8.5
10.8
m3/hr
1.6
2.5
3.4
4.3
QT025A | 2.4L | 25 kWINDUSTRIAL SPARK-IGNITED GENERATOR SETEPA Certified Stationary Emergency
4 OF 5
STANDARD FEATURES AND OPTIONS
SP
EC
SH
EET
GENERATOR SET
Genset Vibration Isolation Std
Extended warranty Opt
Gen-Link™ Communications Software Opt
Steel Enclosure Opt
Aluminum Enclosure Opt
ENGINE SYSTEM
General
Oil Drain Extension Std
Critical Exhaust Silencer Std
Air cleaner Std
Fan guard Std
Radiator duct adapter Std
Fuel System
Fuel lockoff solenoid Std
Secondary Fuel Regulator Std
Flexible fuel lines Std
Cooling System
120VAC Coolant Heater Std
Closed Coolant Recovery System Std
UV/Ozone resistant hoses Std
Factory-Installed Radiator Std
Radiator Drain Extension Std
Engine Electrical System
Battery charging alternator Std
Battery cables Std
Battery tray Std
Solenoid activated starter motor Std
10A UL float/equalize battery charger Std
Rubber-booted engine electrical connections Std
ALTERNATOR SYSTEM
UL2200 GENprotect™ Std
Main Line Circuit Breaker Std
CONTROL SYSTEM
Control Panel
Digital H Control Panel - Dual 4x20 Display Std
Programmable Crank Limiter Std
21-Light Remote Annunciator Opt
Remote Relay Panel (8 or 16) Opt
7-Day Programmable Exerciser Std
Special Applications Programmable PLC Std
RS-232 Communications Std
RS-485 Communications Std
All-Phase Sensing DVR Std
Full System Status Std
Utility Monitoring (Req. H-Transfer Switch) Std
2-Wire Start Compatible Std
Power Output (kW) Std
Power Factor Std
Reactive Power Std
All phase AC Voltage Std
All phase Currents Std
Oil Pressure Std
Coolant Temperature Std
Coolant Level Std
Fuel Pressure Std
Engine Speed Std
Battery Voltage Std
Frequency Std
Isochronous Governor Control Std
-40deg C - 70deg C Operation Std
Waterproof Plug-In Connectors Std
Audible Alarms and Shutdowns Std
Not in Auto (Flashing Light) Std
Auto/Off/Manual Switch Std
E-Stop (Red Mushroom-Type) Std
NFPA 110 Level I and II (Programmable) Std
Remote Communication - RS232 Std
Alarms (Programmable Tolerances, Pre-Alarms and Shutdowns)
Low Fuel Pressure Std
Oil Pressure (Pre-programmed Low Pressure Shutdown) Std
Coolant Temperature (Pre-programmed High Temp Shutdown) Std
Coolant Level (Pre-programmed Low Level Shutdown) Std
Engine Speed (Pre-programmed Overspeed Shutdown) Std
Voltage (Pre-programmed Overvoltage Shutdown) Std
Battery Voltage Std
W L
H
WL
H
QT025A | 2.4L | 25 kW
Rev. E 05/13/15Generac Power Systems, Inc. | P.O. Box 8 | Waukesha, WI 53187P: (262) 544-4811 © 2015 Generac Power Systems, Inc. All rights reserved. All specifications are subject to change without notice.
5 OF 5
DIMENSIONS AND WEIGHTS*
OPEN SET (Includes Exhaust Flex)
L x W x H in (mm) 77 (1956) x 34 (864) x 43 (1092)
LEVEL 1 ACOUSTIC ENCLOSURE
L x W x H in (mm) 77 (1956) x 34 (864) x 46 (1168)
Specification characteristics may change without notice. Please consult a Generac Power Systems Industrial Dealer for detailed installation drawings.
YOUR FACTORY RECOGNIZED GENERAC INDUSTRIAL DEALER
SP
EC
SH
EET
INDUSTRIAL SPARK-IGNITED GENERATOR SETEPA Certified Stationary Emergency
Sound Level (dBA*) 83
Sound Level (dBA*) 60
Part No 0173110SBY
*All measurements are approximate and for estimation purposes only. Sound levels measured at 23 ft (7M) and does not account for ambient site conditions.
Weight (lbs) 1163
Weight (lbs) 1414