CLIPPERSHIP WHARF (2015 - Present) East Boston, MA Description: 478 Unit Mutlifamily Dwelling Development with Retail Type: Condominiums and Apartments Parking: Approximatly 300 Parking Spaces Size: 660,000 SQ FT 4 Buildings Height: 6 Stories Construction Type: Wood framed (3A) over concrete podium (1A) Construction Cost: $220,000,000 Project Role: Senior Project Manager Project Status: In Construction LEED: Platinum (Target) 480 MAIN @ MALDEN SQUARE (2013 - 2015) Malden, MA Description: 195 Unit Multifamily Dwelling Development with Retail Type: Apartments Parking: Approximatly 175 Parking Spaces Size: 243,611 SQ FT Height: 6 Stories Construction Type: Wood framed (3A) over concrete podium (1A) Construction Cost: $35,000,000 Project Role: Project Manager Project Status: Complete ARLINGTON 360 (2011 - 2013) Arlington, MA Description: 176 Unit Multifamily Dwelling Development Type: Condominiums and Apartments Parking: Approximatly 344 Parking Spaces Size: 220,000 SQ FT 9 Buildings (7 Rental - 2 For Sale) Height: 5 Story Building (Rental) Two-story townhomes (Rental) Three-story townhomes (For Sale) Construction Type: Wood framed (5A) over concrete podium (1A) Construction Cost: $45,000,000 Project Role: Project Manager - Construction Administration Project Status: Complete Awards: “Editor’s Choice Award – Best of the Best” – Multi Family Executive “Grand Award for Best Reuse of Land” – Multi Family Executive BARSTOW VILLAGE (2011 - 2012) Hanover, MA Description: 66 Unit Mullifamily Dwelling Development Type: Senior Living Apartments Parking: Approximatly 77 Parking Spaces Size: 54,876 SQ FT Height: 3 Stories Construction Type: Wood framed (5A) Construction Cost: $7,655,000 Project Role: Project Manager - Construction Administration Project Status: Complete LEED: LEED GOLD NEPONSET LANDING (2006 - 2007) Quincy, MA Description: 280 Unit Mutlifamily Dwelling Development Type: Apartments Parking: Approximatly 435 Parking Spaces Size: 344,609 SQ FT Height: 12 Stories Construction Type: Steel and Concrete Composite Construction (1A) Construction Cost: $55,000,000 Project Role: Project Manager - Construction Administration Project Status: Complete

Job list (2016_SEP_29)

Embed Size (px)

Citation preview

Page 1: Job list  (2016_SEP_29)

CLIPPERSHIP WHARF (2015 - Present) East Boston, MA

Description: 478 Unit Mutlifamily Dwelling Development with Retail

Type: Condominiums and Apartments

Parking: Approximatly 300 Parking Spaces

Size: 660,000 SQ FT

4 Buildings

Height: 6 Stories

Construction Type: Wood framed (3A) over concrete podium (1A)

Construction Cost: $220,000,000

Project Role: Senior Project Manager

Project Status: In Construction

LEED: Platinum (Target)

480 MAIN @ MALDEN SQUARE (2013 - 2015) Malden, MA

Description: 195 Unit Multifamily Dwelling Development with Retail

Type: Apartments

Parking: Approximatly 175 Parking Spaces

Size: 243,611 SQ FT

Height: 6 Stories

Construction Type: Wood framed (3A) over concrete podium (1A)

Construction Cost: $35,000,000

Project Role: Project Manager

Project Status: Complete

ARLINGTON 360 (2011 - 2013) Arlington, MA

Description: 176 Unit Multifamily Dwelling Development

Type: Condominiums and Apartments

Parking: Approximatly 344 Parking Spaces

Size: 220,000 SQ FT

9 Buildings (7 Rental - 2 For Sale)

Height: 5 Story Building (Rental)

Two-story townhomes (Rental)

Three-story townhomes (For Sale)

Construction Type: Wood framed (5A) over concrete podium (1A)

Construction Cost: $45,000,000

Project Role: Project Manager - Construction Administration

Project Status: Complete

Awards: “Editor’s Choice Award – Best of the Best” – Multi Family Executive

“Grand Award for Best Reuse of Land” – Multi Family Executive

BARSTOW VILLAGE (2011 - 2012) Hanover, MA

Description: 66 Unit Mullifamily Dwelling Development

Type: Senior Living Apartments

Parking: Approximatly 77 Parking Spaces

Size: 54,876 SQ FT

Height: 3 Stories

Construction Type: Wood framed (5A)

Construction Cost: $7,655,000

Project Role: Project Manager - Construction Administration

Project Status: Complete

LEED: LEED GOLD

NEPONSET LANDING (2006 - 2007) Quincy, MA

Description: 280 Unit Mutlifamily Dwelling Development

Type: Apartments

Parking: Approximatly 435 Parking Spaces

Size: 344,609 SQ FT

Height: 12 Stories

Construction Type: Steel and Concrete Composite Construction (1A)

Construction Cost: $55,000,000

Project Role: Project Manager - Construction Administration

Project Status: Complete

Page 2: Job list  (2016_SEP_29)

THE WATERMARK 2007 Portland, ME

Description: 121 Unit Mutlifamily Dwelling Development with Retail

Type: Condominiums

Parking: Approximatly 105 Parking Spaces

Size: 163,361 SQ FT

Height: 5 Stories

Construction Type: Wood framed (5A) over concrete podium (1A)

Construction Cost: $60,000,000

Project Role: Job Captian

Project Status: Not Built

PARKWAY HEIGHTS (2005 - 2007) Everett, MA

Description: 75 Unit Mutlifamily Dwelling Development

Type: Condominiums

Parking: Approximatly 148 Parking Spaces

Size: 147,000 SQ FT

Height: 5 Stories over 3 stories of parking

Construction Type: "Epicore" concete deck system and panelized metal wall system (2A) over concrete podium (1A)

Construction Cost: $15,000,000

Project Role: Project Manager - Construction Administration

Project Status: Complete

Charlestown Condominiums 2007 Charlestown, MA

Description: 374 Unit Mutlifamily Dwelling Development with Retail

Type: Condominiums

Parking: Approximatly 423 Parking Spaces

Size: 697,300 SQ FT

Height: 20 Stories

Construction Type: Steel and Concrete Composite Construction (1A)

Construction Cost: $95,000,000

Project Role: Project Architect

Project Status: Not Built

Curry College Theatre (2005-2006) Milton, MA

Description: Academic Building and 169 seat Black Box Theatre

Size: 30,000 SQ FT

Height: 1 Story Theatre

Construction Type: Block and Plank with Brick Veneer

Construction Cost: $10,000,000

Project Role: Theatre Design

Project Status: Complete

ASHER'S PATH (2005 - 2006) MASHPEE, MA

Description: 56 Unit Mutlifamily Dwelling Development

Type: Apartments

Parking: Approximatly 56 Parking Spaces

Size: 44,218 SQ FT

Height: 2 Stories

Construction Type: Wood framed (5A)

Construction Cost: $5,000,000

Project Role: Project Designer

Project Status: Complete

NATIONAL AMUSEMENTS 2005 Boston, MA

Description: 150 Key Hotel with Spa, Restaurant, and Bar

Parking: Approximatly 150 Parking Spaces

Size: 111,146 SQ FT

Height: 7 Stories

Construction Type: Block and Plank Construction (2A)

Construction Cost: Unknown

Project Role: Project Architect

Project Status: Not Built

Page 3: Job list  (2016_SEP_29)

DENNIS SENIOR APARTMENTS (2003-2005) Dennis, MA

Description: 46 Unit Mutlifamily Dwelling Development

Type: Senior Living Apartments

Parking: Approximatly 52 Parking Spaces

Size: 40,650 SQ FT

Height: 2 Stories

Construction Type: Wood Framed (5A)

Construction Cost: $4,800,000

Project Role: Project Architect - Construction Administration

Project Status: Complete

WESTPORT VILLAGE APARTMENTS (2003-2005) Westport, MA

Description: 48 Unit Mutlifamily Dwelling Development

Type: Senior Living Apartments

Parking: Approximatly 71 Parking Spaces

Size: 43,050 SQ FT

Height: 2 Stories

Construction Type: Wood Framed (5A)

Construction Cost: $5,000,000

Project Role: Project Architect - Construction Administration

Project Status: Complete

SHERBORN SENIOR LIVING (2002-2004) Sherborn, MA

Description: 24 Unit Mutlifamily Dwelling Development

Type: Senior Living Apartments

Parking: Approximatly 37 Parking Spaces

Size: 47,000 SQ FT

Height: 3 Stories

Construction Type: Wood Framed (5A)

Construction Cost: $4,000,000

Project Role: Project Manager - Construction Administration

Project Status: Complete

SEAVIEW RETREAT 2001 Rowley, MA

Description: 12-Bed Addition

Type: Extended Care Facility

Size: 17,000 SQ FT

Height: 3 Stories

Construction Type: Block and Plank Construction (2A)

Construction Cost: Unknown

Project Role: Project Architect

Project Status: Not Built

WHEEL HOUSE APARTMENTS (2001 - 2002) Roxbury, MA

Description: 12 Unit Mutlifamily Dwelling Development

Type: Apartments

Size: 15,000 SQ FT

Height: 3 Stories

Construction Type: Wood Framed (5A)

Construction Cost: Unknown

Project Role: Project Architect

Project Status: Not Built

Page 4: Job list  (2016_SEP_29)

LINWOOD MILL APARTMENTS (2010 - 2012) Whitinsville, MA

Description: 75 Unit Multifamily Dwelling Development with Retail

Historic Restoration / Adaptive Resuse

Type: Senior Living Apartments

Parking: Approximatly 161 Parking Spaces

Size: 243,611 SQ FT

Height: Existing - 5 Stories

Construction Type: Existing Heavy Timber (4A)

Construction Cost: $10,500,000

Project Role: Project Architect - Construction Administration

Project Status: Complete

Awards: "Paul E. Tsongas Award" - Preservation Massachusetts

"Prism Award GOLD – Best Affordable Development" – BRAGB

"Best Historic Mill or Factory Rehabilitation - 2014 Judge Award" - NHRA

SILVER LEAF TERRACE (2008 - 2011) Leicester, MA

Description: 216 Unit Multifamily Dwelling Development with 3,500 SQ FT Community Building Addition

Moderate Rehabilitation

Type: Apartments

Parking: Approximatly 200 Parking Spaces

Size: 210,000 SQ FT

7 Buildings

Height: Existing - 3 Stories

Construction Type: Existing Wood Construction

Construction Cost: $7,500,000

Project Role: Project Architect - Construction Administration

Project Status: Complete

Awards: "Quality Award for Outstanding Turnaround of a Troubled Property" - NEAHMA

NEW BRUNSWICK APARTMENTS (2002 - 2004) New Brunswick, NJ

Description: 206 Unit Multifamily Dwelling Development

Moderate Rehabilitation

Type: Apartments

Size: 226,377 SQ FT

13 Buildings

Height: Existing - 2 Story Townhomes

Existing 3-Story Flat Style Buildings

Construction Type: Existing Wood Construction

Construction Cost: $4,000,000

Project Role: Project Architect - Construction Administration

Project Status: Complete

The Lofts at 30 Pine (2014 - Present) Gardner, MA

Description: 55 Unit Multifamily Dwelling Development with Parking Deck

Historic Restoration / Adaptive Resuse

Type: Senior Living Apartments

Parking: Approximatly 111 Parking Spaces

Size: 74,689 SQ FT

Height: Existing - 4 Stories

Construction Type: Existing Heavy Timber (4A)

Construction Cost: $13,000,000

Project Role: Senior Project Manager

Project Status: Complete

Kennedy Building (2014 - Present) Hanover, MA

Description: 37 Unit Multifamily Dwelling Development with Health Center

Historic Restoration / Adaptive Resuse

Type: Apartments

Parking: Approximatly 63 Parking Spaces

Size: 58,375 SQ FT

Height: Existing - 3 Stories plus basement

Construction Type: Existing Steel Column and Joist Construction

Construction Cost: $6,000,000

Project Role: Project Architect

Project Status: Pre-Construction

Page 5: Job list  (2016_SEP_29)

WINTER STREET SCHOOL APARTMENTS (2014 - Present) Haverhill, MA

Description: 12 Unit Multifamily Dwelling Development

Historic Restoration / Adaptive Resuse

Type: Apartments

Parking: Approximatly 8 Parking Spaces

Size: 19,736 SQ FT

Height: Existing - 3 Stories plus basement

Construction Type: Existing wood framing

Construction Cost: $2,500,000

Project Role: Senior Project Manager

Project Status: Complete

98 ESSEX (2014 - Present) Haverhill, MA

Description: 62 Unit Multifamily Dwelling Development with Retail

Historic Restoration / Adaptive Resuse

Type: Apartments

Parking: Approximatly 84 Parking Spaces

Size: 91,300 SQ FT

Height: Existing - 8 Stories plus basement

Construction Type: Existing concrete framing

Construction Cost: $15,000,000

Project Role: Project Architect

Project Status: Pre-Construction

HUDSON TERRACE APARTMENTS (2010 - 2012) Hudson, NY

Description: 167 Unit Multifamily Dwelling Development with Office Addition

Moderate Rehabilitation

Type: Apartments

Size: 170,580 SQ FT

13 Buildings

Height: Existing - 3 Stories

Construction Type: Existing wood framing

Construction Cost: $8,000,000

Project Role: Project Architect - Construction Administration

Project Status: Complete

SAUNDERS SCHOOL APARTMENTS (2010 - 2012) Lawrence, MA

Description: 16 Unit Multifamily Dwelling Development

Historic Restoration / Adaptive Resuse

Type: Homeless Housing

Parking: Approximatly 32 Parking Spaces

Size: 16,425 SQ FT

Height: Existing - 3 Stories plus basement

Construction Type: Existing metal joist and brick masony construction

Construction Cost: $3,000,000

Project Role: Project Manager - Construction Administration

Project Status: Complete

AVALON @ ST. PAUL'S 2008 Garden City, NY

Description: 108 Unit Multifamily Dwelling Development

Historic Restoration / Adaptive Resuse & New Construction

Type: Apartments

Parking: Approximatly 227 Parking Spaces

Height: Existing - 5 Stories plus basement

Construction Type: Existing metal joist and brick masony construction

Project Role: Job Captain

Project Status: Not Built

Page 6: Job list  (2016_SEP_29)

TOURISTER MILL Warwick, RI

Description: 316 Unit Multifamily Dwelling Development

Historic Restoration / Adaptive Resuse & New Construction

Type: Apartments

Parking: Approximatly 227 Parking Spaces

Size: 597,803 SQ FT

25 Buildings (Existing & New)

Height: Existing - Varies

Construction Type: Existing Heavy Timber (4A)

Project Role: Job Captain

Project Status: Not Built

MIDDLEBURY ARMS APARTMENTS (2010 - 2012) Midleboro, MA

Description: 64 Unit Multifamily Dwelling Development

Moderate Rehabilitation

Type: Apartments

Size: 102,476 SQ FT

4 Buildings

Height: Existing - 2 Stories plus basement

Construction Type: Existing wood framing

Construction Cost: $8,000,000

Project Role: Senior Project Manager

Project Status: Complete

ST. THERESA HOUSE (2004 - 2005) Lynn, MA

Description: 32 Unit Multifamily Dwelling Development

Historic Restoration / Adaptive Resuse & Addition

Type: Senior Living Apartments

Size: 34,784 SQ FT

Height: Existing - 5 Stories

Construction Type: Existing Brick Masonry and Terracotta Construction

Construction Cost: $3,800,000

Project Role: Project Manager - Construction Administration

Project Status: Complete

THE VILLAGE AT LAKEVIEW (2001 - 2002) Edgewood, MD

Description: 221 Unit Multifamily Dwelling Development and New Community Building

Moderate Rehabilitation

Type: Apartments

Size: 218,000 SQ FT

15 Buildings

Height: Existing - 3 Stories

Construction Type: Existing wood framing

Construction Cost: $4,200,000

Project Role: Project Manager - Construction Administration

Project Status: Complete

MERRIMACK STREET 2012 Haverhill, MA

Description: 19 Unit Multifamily Dwelling Development

Historic Restoration / Adaptive Resuse & Addition

Type: Apartments

Size: 48,000 SQ FT

Height: Existing - 4 Stories

Construction Type: Existing Wood Framed with Brick Masonry and Terracotta Construction

Construction Cost: Unknown

Project Role: Project Architect

Project Status: Not Built

Page 7: Job list  (2016_SEP_29)

NEWBERRY ESTATES (2011 - 2013) Midleboro, MA

Description: 200 Unit Multifamily Dwelling Development

Moderate Rehabilitation

Type: Apartments

Parking: Approximatly 220 Parking Spaces

Size: 156,492 SQ FT

14 Buildings

Height: Existing - 2 Stories

Construction Type: Existing wood framing

Construction Cost: $5,250,000

Project Role: Project Architect

Project Status: Complete

Hollbrook, MA

Description: 12,500 SQ FT Office Fit-out

Office Fit-Out

Type: Office Space

Parking: Approximatly 5 Parking Spaces

Size: 12,500 SQ FT

Height: Existing - 2 Stories

Construction Type: Existing steel joist framing

Construction Cost: Unknown

Project Role: Project Architect

Project Status: Not Built

LAMPLIGHTER VILLAGE (2008 - 2011) Canton, MA

Description: 81 Unit Multifamily Dwelling Development

Moderate Rehabilitation

Type: Apartments

Parking: Approximatly 75 Parking Spaces

Size: 60,000 SQ FT

5 Buildings

Height: Existing - 2 Stories

Construction Type: Existing wood framing

Project Role: Project Architect

Project Status: Complete

TENT CITY Rochester, NY

Description: 83 Unit Multifamily Dwelling Development

Historic Restoration / Adaptive Resuse

Type: Apartments

Parking: Approximatly 101 Parking Spaces

Size: 117,617 SQ FT

Height: Existing - 4 Stories

Construction Type: Existing Heavy Timber (4A)

Construction Cost: $19,000,000

Project Role: Project Architect

Project Status: Not Built

CHELSEA VILLAGE APARTMENTS Chelsea, MA

Description: Window and Mechanical System Replacement

Type: Apartments

Height: Existing - 7 Stories

Construction Cost: $1,350,000

Project Role: Project Manager - Construction Administration

Project Status: Complete

GREENHOUSE APARTMENTS Chelsea, MA

Description: Waterproofing Repairs

Type: Apartments

Height: Existing - 6 Stories

Project Role: Job Captain

Project Status: Complete

DELLBROOK CONSTRUCTION HEADQUARTERS

Page 8: Job list  (2016_SEP_29)

ROCKLAND PLACE APARTMENTS 2005 Rockland, MA

Description: 210 Unit Multifamily Dwelling Development

Moderate Rehabilitation

Type: Apartments

Parking: Approximatly 75 Parking Spaces

Size: 8 Buildings

Height: Existing - 3 Stories

Construction Type: Existing wood framing

Project Role: Project Architect

Project Status: Not Built

BRESLYN HOUSE (2005 - 2006) Philadelphia, PA

Description: 60 Unit Multifamily Dwelling Development

Moderate Renovations

Type: Apartments

Sixe: 5 Buildings

Height: Existing - 3 Stories plus basement

Cost: $800,000

Project Role: Senior Project Manager

Project Status: Complete

HOTEL RAYMOND (2003 - 2004) Fitchburg, MA

Description: 74 Unit Multifamily Dwelling Development

Moderate Renovations

Type: Apartments

Height: Existing - 5 Stories

Cost: $550,000

Project Role: Project Architect - Construction Administration

Project Status: Complete

COBBS CREEK APARTMENTS (2005 - 2006) Philadelphia, PA

Description: 85 Unit Multifamily Dwelling Development

Moderate Renovations

Type: Apartments

Size: 147,652 SQ FT

Height: Existing - 3 Story plus basement

Cost: $2,125,000

Project Role: Senior Project Manager

Project Status: Compelte

MIDDLEBORO SKILLED CARE CENTER 2002 Middleboro, MA

Description: 150 Unit Multifamily Dwelling Development

Moderate Renovations

Type: Skilled Care Center

Height: Existing - 1 Story

Project Role: Project Architect

Project Status: Not Renovated

BROWNS MILLS APARTMENTS (2001 - 2002) Browns Mills, NJ

Description: 150 Unit Multifamily Dwelling Development

Moderate Rehabilitation

Type: Apartments

Size: 15 Buildings

Height: Existing - 2 Stories

Cost: $3,000,000

Construction Type: Existing wood framing

Project Role: Project Manager - Construction Administration

Project Status: Complete

Page 9: Job list  (2016_SEP_29)

PIPERBROOK APARTMENTS (2005 - 2006) West Hartford, CT

Description: 96 Unit Multifamily Dwelling Development

Moderate Rehabilitation

Type: Apartments

Size: 11 Buildings

Height: Existing - 2 Stories

Construction Type: Existing wood framing

Project Role: Project Architect

Project Status: Not Renovated

THE GREENERY AT BRIGHTON 2002 Brighton, MA

Description: 200 Bed Skilled Nursing Center

Adaptive Reuse

Type: Nursing Center

Height: Existing - 3 Stories

Cost: $800,000

Project Role: Senior Project Manager

Project Status: Not Renovated

DURFEE STREET LOFTS 2011 Fall River, MA

Description: 43 Unit Multifamily Dwelling Development

Historic Restoration / Adaptive Resuse

Type: Apartments and Artist Lofts

Parking: Approximately 61 Parking Spaces

Height: Existing - 4 Stories plus basement

Four Building with new link construction

Construction Type: Existing Heavy Timber (4A)

Project Role: Job Captain

Project Status: Not Built

THE 903 RESIDENCES 2009 Providence, RI

Description: 330 Unit Mutlifamily Dwelling Development

Waterproofing Repairs

Type: Apartments

Parking: Approximately 595 Parking Spaces

Height: Existing - 4 Stories

Project Role: Job Captain

Project Status: Not Renovated

VETERAN'S INC. 2015 Worcester, MA

Description: Veteran Housing - 74 Dormitory Beds and 11 Micro Unit Lofts

Historic Restoration / Adaptive Resuse

Type: Dormitoy and Micro-Unit Apartments

Size: Approximately 80,000 SQ FT

Height: Existing - 4 Stories plus basement

Project Role: Project Architect

Project Status: Not Built