Joint National Training Capability - Corporate Board FY 10 JNTC Budget. Al Lawver JNTC Program Director. Objectives. Consensus brief for the FY 10 JNTC budget. Budget Analysis Assumptions. All known Congressional cuts are included in the FY 10 JNTC President’s Budget (PB). - PowerPoint PPT Presentation
Citation preview
25 Aug 2009 1
USJFCOM
UNCLASSIFIED
Joint National Training Capability
-Corporate Board
FY 10 JNTC Budget
Al LawverJNTC Program Director
25 Aug 2009 2
USJFCOM
UNCLASSIFIED
Objectives
• Consensus brief for the FY 10 JNTC budget.
25 Aug 2009 3
USJFCOM
UNCLASSIFIED
Budget Analysis Assumptions
• All known Congressional cuts are included in the FY 10 JNTC President’s Budget (PB).
– The HAC-D committee has marked all JNTC O&M growth ($4.965M). SAC-D has not reported out.
– Based on previous years’ experience, up to a 4% DoD wide reduction to T2 O&M and RDTE is likely.
• The JTCP Program has received $1.065M in FY 09 end of year funding.
• Service JNTC funding is in accordance with the T2 POM, as modified by cuts.
• The Services will receive quarterly allocations of JTCP funds directly from OSD in accordance with the agreed business rules.
25 Aug 2009 4
USJFCOM
UNCLASSIFIED
JTCP Reallocation Business Rules• Receiving Service (Army, Navy, USMC, USAF, SOCOM) is responsible for
obligation and expenditure of the reallocated funds.
• Funding not executed must be returned to the Program Director for any reallocation decision. At years end, all unexecuted funds must be returned NLT 30 July to be sure they can be reallocated before the end of the FY. Case by case exceptions will be made for event funds required in the 4th quarter; the PD should be notified as early as possible if any JTCP funds cannot be fully executed.
• As funds are executed, results of Service JTCP efforts will be reported as part of the JNTC quarterly report. Financial reporting will be IAW OSD requirements. These reports do not replace any reporting status required by the TD JTCP coordinator.
• The FAD will contain instructions that the funds will be used for the JTCP event support coordinated at the JTCC except as approved by the PD. Any changes to the JTCP plan that affect the funding allocation must be approved by the Program Director and the TD JTCP coordinator.
• Any changes to the quarterly spend plan must be coordinated with the Program Director, who will request changes to OSD via the JWFC business office.
25 Aug 2009 5
USJFCOM
UNCLASSIFIED
Terms of Reference for JFCOM Funding
Centrally Managed Capabilities : Support for JNTC national capabilities that are provided by JFCOM JFT.
– JAAR-RL, joint instrumentation development, JTEN expansion, KM/IM capabilities, CDS, JTEN Test Bed, network development efforts (e.g. Alternate JTEN, NexGen JTEN), JTDS, joint architectures and standards development, JATTL support contract, exercise control lab equipment and maintenance, and joint model and federation development.
TD JST Support: JFCOM JST contract support to JNTC.
– JFCOM contract support for Accreditation/Certification, event technical support and model integration, program assessment, and mitigation.
Events/Other Programs: Resources for Service and COCOM accredited programs, events, and other agencies
– TENA, FITE JCTD, BCTP, C-IED, SOF MRX Planners, and joint models technical integration and event support.
25 Aug 2009 6
USJFCOM
UNCLASSIFIED
Terms of Reference for JFCOM Funding
JNTC Management : JNTC funded labor for 34 military, 58 government, 10 other government civilians, and 31 contract FTEs from JST and non-JFCOM contracts; administrative expenses. (Fixed Cost)
JTEC : JATTL Lab building lease, guard services, utilities, and equipment maintenance contracts. (Fixed Cost)
JTEN Maintenance: NOSC, JTEN operations and maintenance, and network security. (Fixed Cost)
IW PBRs: POM 10 IW funds (O&M, RDTE, and OP) not specifically funding Service PBRs.
OPFOR PBRs: All OPFOR supporting the programs (O&M, RDTE, and OP) including O&M sustainment costs.
25 Aug 2009 7
USJFCOM
UNCLASSIFIED
FY10 JNTC Congressional Appropriation
OP $21,727,000
14%
RDTE $30,279,500
20%
O&M $100,971,800
62%
Total Program: $154,605,811 JFCOM Total: $97,748,551
Services Total: $56,857,260
25 Aug 2009 8
USJFCOM
UNCLASSIFIED
FY10 PEP Stakeholder Distribution
JFCOM$92,348,551
60%
Service Direct
$50,940,870 31%
USAF JNTC OPFOR OP $4,177,000
3%
JFCOM OPFOR OP $5,400,000,
4%
Total Program: $154,605,811 JFCOM Total: $97,748,551
Services Total: $56,857,260
25 Aug 2009 9
USJFCOM
UNCLASSIFIED
FY10 JNTC Program Distribution
Total Program: $154,605,811 JFCOM Total: $97,748,551
Services Total: $56,857,260
Navy $11,923,500
8%
USAF $18,497,000
12%
Army $14,067,929
9%
JFCOM OM $60,118,551
38%
JFCOM RDTE $22,850,000
15%
JFCOM OP $14,780,000, 10%
JFCOM Total $97,748,551
62%
USAF AP/OP $6,947,000
4%USMC
$5,421,831 4%
25 Aug 2009 10
USJFCOM
UNCLASSIFIED
Total Program: $154,605,811 JFCOM Total: $97,748,551
Services Total: $56,857,260
Centrally Managed Capability
$14,442,069 15%
Events/Other Programs
$5,164,340 5%
Support Elements
$4,842,000 5%
TD JST Support $7,542,000
8%JTEC
$1,835,000 2% JNTC Management
& Overhead $16,984,500, 18%
Service PBRs
$20,745,216 21%
Army $4,104,508, 4%
Navy $3,821,000, 4%
USAF $3,219,354, 3%
USMC $3,219,354, 3%
SOCOM $6,381,000, 7%
IW $5,086,666
5%
OPFOR $14,709,875
15%
JTEN Maintenance $5,800,250
6%
Internal Core JFCOM
Funding
$46,603,819 (48%)
Service/ COCOM
Training Programs
$50,548,097 (52%)
FY10 JFCOM JNTC Distribution
25 Aug 2009 11
USJFCOM
UNCLASSIFIED
FY10 Program ManagementProgram Management: $16,984,500Administrative Costs1: $4,310,819JFCOM Total: $97,748,551
GS Labor $6,100,000
36%
ISSA $2,565,819
15%
Other GS Labor $1,620,000
10%
JNTC Travel $500,000
3%
Lease, Shipping, Communications
$1,245,000 7%
PM Contract Labor
$4,953,681 29%
Note: 1. Administrative costs are used in operating an organization including rent, management salaries, utilities, security, travel, etc.
25 Aug 2009 12
USJFCOM
UNCLASSIFIED
FY 10 Budget Cuts ($K)
FY 10 Baseline
POM 10 INC
FY 10 Pres Bud
PBD 707 $5.7M
REDUCFY 10 ADJ
PBD 610 & 800
REDUCPBD 802 REDUC
Revised FY 10
JNTC 58,580.0 2,340.0 60,920.0 (1,874.6) 59,045.4 (1,053.2) (355.3) 57,636.9
IW 0.0 2,625.0 2,625.0 (80.8) 2,544.2 (47.1) (15.4) 2,481.7
Total 58,580.0 4,965.0 63,545.0 (1,955.5) 61,589.5 (1,100.3) (370.7) 60,118.5
The HAC-D has cut all growth for FY 10 which means the POM 10 O&M increase of $4,965K is at risk. The SAC-D had no reductions. Conference committee will make the final decision, which will be part of the FY 10 Appropriations Bill.
The JTCP Program has received $1.065M in FY 09 end of year funding.
25 Aug 2009 13
USJFCOM
UNCLASSIFIED
FY 10 Budget Issues
• FY 10 draft budget of 11 August accepted by SOCOM, Navy, USAF, JCS J7.
• Three remaining issues –
– USMC: JFCOM funds directly supporting pre-deployment training (PBR 2732 -USMC MRX JTF-FC Host Nation Role Players and PBR 3411- USMC SOF Role Players at MAGTFTC) received no allocation of funds.
– Army: JISR training at the CTCs was not funded.
– JWFC TD: No funding for procurement of NexGen JTEN equipment. This pushes the problem to the right and creates an insurmountable problem in the FY 12 - 13 timeframe. High risk that some persistent sites will become non-functional without ATM equipment replacement.
25 Aug 2009 14
USJFCOM
UNCLASSIFIED
FY 10 Budget Issues Resolutions
• USMC: Two PBRs for JFCOM funds directly supporting pre-deployment training were not allocated funding. (PBR 2732 -USMC MRX JTF-FC Host Nation Role Players and PBR 3411- USMC SOF Role Players at MAGTFTC). – Action: The PD has fully funded PBR 2732.
• Army: JISR training at the CTCs was not funded. – Action: The PD has funded PBR 3415 at $1.085M with FY 09 EOY
funds and FY 10 IW funds. Army will fund an additional $915K.
• JWFC TD: No funding for procurement of NexGen JTEN equipment. This pushes the problem to the right and creates an insurmountable problem in the FY 12 - 13 timeframe. High risk that some persistent sites will become non-functional without ATM equipment replacement.– Action: The PD recommends redistribution of JFCOM OP to allocate
$4M on PBR 2690 NexGen Equipment procurement. Details are in a separate brief. This will impact FY 10 JTEN expansion and USMC and Army procurement plans as allocated in the 11 August draft budget.
25 Aug 2009 15
USJFCOM
UNCLASSIFIED
Questions