Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
Jordan
Acknowledgments
The (I)NDC Content Briefs were produced by the Climate Policy
Team of the World Bank Climate Change Group. The team was led
by Sebastian Wienges and Ana Bucher under the supervision of
Stephen Alan Hammer. Detail analysis of country (I)NDC was
provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation
components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation
components). The team is grateful for all comments and
suggestions received from regional and sector specialists
regarding the presentation and synthesis of relevant information.
© 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org
Climate Policy Team | World Bank Group
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
Introduction In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WBCPT) has
reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief
aims to provide a summary analysis of existing and instead country mitigation and adaptation
policies and plans, commitments and targets, implementation strategies and sector priorities,
associated costs and conditionalities, and stated gaps and needs, among other issues.
The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions.
The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify
and familiarize with a range of country priorities in terms of sectoral engagement, and needs in
terms of capacity building, technology transfer, and financing. Based on this comprehensive
mapping exercise, the WBG will develop a useful, easytouse, and interactive database and briefs
of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including
the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks
(CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices
(GPs), regions, and country units for the identification of potential development opportunities,
analytical studies and technical assistance to support countries' implementation of planned policies
and actions. Indepth summaries of (I)NDCs by sectors and regions will be prepared at a later stage.
In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions
which include preparation of adaptation plans. The Adaptation section of a large number of
submitted (I)NDCs, aims to increase development planning and scale the ability of countries to
adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse
gas emissions development, in a manner that does not threaten sustainable development. In
addition to requested finance, the implementation of country commitments is largely tied to
significant amounts of external assistance to support development and execution of adaptation
plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,
the process will ensure increased resilience is recognized under the UNFCCC and climate finance
mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.
Climate Policy Team | World Bank Group
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
Table of Contents
I Overall Planning and Preparation Process
II Mitigation
Economywide Targets
Economywide Policies
Mitigation Actions and Policies
III Adaptation
Adaptation Targets
Adaptation Context
Adaptation Actions and Policies
Acronyms
BAU Business as Usual NAMA Nationally Appropriate MitigationActions
CIFPPCR Climate Investment Funds PilotProgram for Climate Resilience
NAP National Adaptation Plan
DRM Disaster Risk Management NAPA National Adaptation Programmesof Action
INDC Intended Nationally DeterminedContributions
REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries
LEDS Low Emission DevelopmentStrategy
LULUCF Land Use and Land Use Changeand Forestry
|
|
|
Climate Policy Team | World Bank Group
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
Overall Planning and
Preparation Process
How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?
Political decision of adoption of INDC at:Head of state level
Interministerial level
Parliament
Ministry Level
Technical development of INDC through a participatory processStakeholder involvement
Multisector commision YES
Have development benefits been assessed and considered in the planningprocess?
Are there climate policies and actions already in place/under development?
LEDS YES
NAMAS
NAPA
Climate Policy Team | World Bank Group
$N/A
(in Billion USD)
TOTAL COST OF
IMPLEMENTATION (mitigation and adaptation)
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
Existing policies:National strategy and action plan for transitioning towards the green economy in Jordan (2016-2025)
National Biodiversity Strategy and Action Plan (2015-2020)
National Strategy and Action Plan to Combat Desertification (2015-2020)
National Climate Change Policy of the Hashemite Kingdom of Jordan 2013-2020
Has the INDC development been supported by a development partner?Technical support GERMANY THROUGH GIZ
Financial support EU THROUGH CLIMASOUTH
Implementation Plans and Needs
Specific requests for international provision of means of implementation:
Technology Transfer YES
Financial support YES
Capacity Building YES
Does the INDC intend the private sector to be involved in theimplementation of the NDC?
YES
Are carbon pricing/international market mechanisms intended?YES
Are there any barriers identified?
Link list:• Jordan INDC Factsheet (projected per capita emissions): http://www.climateenergycollege.net/files/site1/factsheets/Jordan_INDCFactsheet_UoMPRIMAP_GWPAR4.pdf
Climate Policy Team | World Bank Group
-1.5%
$0.542 billion
additional -12.5%
$5.157 billion
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
Mitigation
ECONOMY-WIDE TARGETS
Conditionality: INDC page link
Unconditional part of mitigation target:Estimated costs for implementation:
Conditional part of mitigation target:Estimated costs for implementation:
Coverage of Gases: CO , CH , N O, SF , PFCs, HFCs
Other Targets:
POLICIES:
Improve incentives for renewables and renewable electricity tariff
National Strategy and Action Plan for Transitioning towards the Green Economy in Jordan 2016-2025; Second Energy Efficiency and Renewable Energy Policy for the Jordanian Water Sector(2015)
Green building codes
Energy Efficiency and Renewable Energy Policy for the Jordanian Water Sector (2015)
TARGET YEAR
2030TARGET TYPE
-14%Relative Emission Reduction
Compared to BAU (%)
2006
5.70(in Billion USD)
COST OFIMPLEMENTATION
2 4 2 6
Climate Policy Team | World Bank Group
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESENERGY Plans:
Renewable Energy
Gas
Energy: General P. 6
Renewable Energy: Solar P. 6
Renewable Energy: Wind P. 7
Energy Efficiency P. 6
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
Raising awareness about the incentivesprovided by the renewable energy
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGYTargets: INDC page link
11% renewables in the total energy mix by 2025 P. 6
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Policies: INDC page link
Improve incentives for renewables and renewable electricity tariff P. 6
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
GASTargets: INDC page link
39% natural gas by 2025 in the energy mix P. 6
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: SOLARPlans: INDC page link
The provision of short-term support for the purchase of solar water heaters;expand the use of solar cooling in commercial and industrial facilities
P. 6
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: WINDPlans: INDC page link
Encourage investment in wind energy projects P. 7
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
ENERGY
EFFICIENCYPolicies: INDC page link
Energy Efficiency and Renewable Energy Policy for the Jordanian WaterSector (2015)
P. 8
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Plans: INDC page link
Energy efficiency improvement in all sectors P. 6
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESTRANSPORT Plans:
Transport: General
Transportation Fuels P. 7
Public Transport
BRT P. 6
Rail P. 6
Vehicle Fleet
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
PUBLIC
TRANSPORTTargets: INDC page link
25% commuters using public transport by 2025 P. 6
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
BRTPlans: INDC page link
Increased share of BRT P. 6
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RAILPlans: INDC page link
Increased share of railway networks P. 6
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
VEHICLE FLEETActions: INDC page link
Zero Emission Electric Vehicle Program P. 7
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
SOLID WASTETargets: INDC page link
Reduce solid waste disposed in landfills to 60% by 2025; 40% solid wastere-used by 2025
P. 7
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESINDUSTRIES Plans:
Industries: General P. 7
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESECONOMY-WIDE
Policies: INDC page link
National Strategy and Action Plan for Transitioning towards the GreenEconomy in Jordan 2016-2025; Second Energy Efficiency and RenewableEnergy Policy for the Jordanian Water Sector (2015)
P. 8
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
BUILDINGSPolicies: INDC page link
Green building codes P. 6
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
AFFORESTATIONTargets: INDC page link
25% afforestation of barren forest areas in the rain belt areas P. 8
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
N/A
N/A
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
Adaptation
ADAPTATION TARGETS
ADAPTATION CONTEXT
Existing National Development/Resilience Policies and Plans
National Communications
NAPs
NAPAS
CIF-PPCRs
Sectoral Strategies
NATIONAL STRATEGY AND ACTIONPLAN TO COMBATDESERTIFICATION (2015-2020)
NATIONAL BIODIVERSITYSTRATEGY AND ACTION PLAN(2015-2020)
Cross-cutting
NATIONAL CLIMATE CHANGEPOLICY OF THE HASHEMITEKINGDOM OF JORDAN (2013-2020)
NATIONAL STRATEGY AND ACTIONPLAN FOR TRANSITIONINGTOWARDS THE GREEN ECONOMYIN JORDAN (2016-2025)
Conditionality:
Unconditional part of adaptation implementation
Conditional part of adaptation implementation
Conditional upon international provision of meansof implementation
YES
TARGET YEAR
2030N/A
(in Billion USD)
COST OFIMPLEMENTATION
Climate Policy Team | World Bank Group
n/a
goj and strategic partners, mainly rscn, royalbotanic garden, and iucn-rowa
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 3.00 million
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
ENVIRONMENT
ECOSYSTEM AND
BIODIVERSITY
Actions:
CONDITIONAL ACTIONS: INDC page link
Conducting a comprehensive review of the National Network of ProtectedAreas by 2020;
Establishing, in partnership with RSCN, a specialized unit to implementthe adaptation strategies, liaise with different national stakeholders andformulate a range of ecosystem adaptation projects within Jordan by2025;
Undertaking more research on vulnerable ecosystems and communitiesand appropriate adaptation priorities by 2030;
Enhancing the resilience of local communities impacted by climatechange in areas within and surrounding PAs by 2030;
Embarking on land use planning as a tool for adaptation to climatechange by 2030.
P. 14
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
AIR QUALITY
MANAGEMENTActions:
CONDITIONAL ACTIONS: INDC page link
Adopting more effective and rapid electronic exchange of surveillancedata for rapid intervention, and establish, with the relevant ministry(ies),access to real-time air quality monitoring data to establish the linkbetween respiratory diseases and air pollution and climate change;
Introducing new indicators that are useful for protecting health, such asAir Quality Index, UV index, in cooperation with the relevant institutions.
P. 14
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
AGRICULTURE
IRRIGATION
Actions:
CONDITIONAL ACTIONS: INDC page link
Implementation of supplemental irrigation, water harvesting techniques,maximizing treated waste water re-use in agriculture;
Maintenance of old Romanian wells for water harvesting purposes andestablishment of new wells in the rural area;
Establishment of desalinization units or sea water and use for agriculture;
Improve soil water storage to maximize plant water availability bymaximizing infiltration of rainfall.
P. 15
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
goj and external funders
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 160.00 million
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
CLIMATE SMART
AGRICULTUREActions:
CONDITIONAL ACTIONS: INDC page link
Raising awareness and declarations on Climate Intelligent Agricultureand promoting utilization of renewable energy and uses in agriculturaland food production sector for cooling and heating purposes;Model development of the soilless and hydroponic agriculture formedicinal and herbal plants and vegetables for water saving;
Establishment of an integrated national monitoring center for climateinformation and data based linking weather and climate informationfrom all deployed centers.
P. 15
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
LULUCF/FORESTRY
SUSTAINABLE
FOREST
MANAGEMENT
Actions:
CONDITIONAL ACTIONS: INDC page link
Urgent need for restoration of the degraded forest ecosystem, protectionof forest and reforestation to increase the green land area
P. 16
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 4000.00 million
Technology Transfer: drought monitoring system;
multiple water technologies.
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
WATER
WATER
MANAGEMENT
Actions:
CONDITIONAL ACTIONS: INDC page link
Executive Development Program for 2015-2025: groundwater protection,
surface water development, demand management, and water resourcesmonitoring system (quantity and quality).
P. 11
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 15.00 million
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
HEALTH
HEALTH SERVICES
AND ASSESSMENT
Actions:
CONDITIONAL ACTIONS: INDC page link
Strengthening the preparedness and resilience of the health sector andincreasing emergency rooms (ER) capacities;Building the needed capacities to conduct health vulnerabilityassessments;Utilizing effective tools (e.g. GIS or Health Mapper) to link environmentaland climatic factors to health outcomes.
P. 13
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
AWARENESS
RAISING AND
BEHAVIOR
CHANGE
Actions:
CONDITIONAL ACTIONS: INDC page link
Educating and informing the public of the needed measures to protecthealth from the adverse impacts of climate change.
P. 13
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISEASE
SURVEILLANCE
AND CONTROL
Actions:
CONDITIONAL ACTIONS: INDC page link
Developing climate-informed disease control programs and surveillancesystems using meteorological services to target vector control in time andspace;
Establishing an early warning system to trigger prompt public healthintervention when certain variables exceed a defined threshold.
P. 13
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISASTER RISK
MANAGEMENT (DRM)
DISASTER RELIEF
AND RECOVERY
Actions:
CONDITIONAL ACTIONS: INDC page link
Developing emergency and fast response plan to providing emergency reliefand aid to those affected by impacts of seasonal severe cold (mainly duringsnow storms) and hot conditions and support programs for incomes offamilies impacted by drought by 2020
P. 16
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
ministry of sustainable development
n/a
n/a
ministry of sustainable development
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
MIDDLE EAST AND NORTH AFRICA | Jordan | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
SOCIAL DEVELOPMENT
POVERTY
REDUCTION
Actions:
UNCONDITIONAL ACTIONS: INDC page link
Adopting poverty fight programs fostering providing housing for poorpeople and supporting micro-projects for poor communities in light ofunusual severe seasonal cold and hot weather conditions prevailed in thelast decade (the coldest/snowy condition of 2013/2014 in the last 10 yearsand a record hot year in the summer of 2015);
Developing emergency relief and aid to those affected by impacts ofseasonal heavy snow storms specially the unusual latest storms;Diversifying income sources for affected communities from severe hotand cold conditions;Proposing on the National Budget a cost of 90,000 JOD to providing solarenergy cells for poor household complexes and Nursing Homes to reduceelectricity bills and increase access to clean energy sources;Replacing 10 large engine vehicles of the Ministry’s fleet with hybrid cars;Assisting poor household complexes by installing water harvesting wells;Investigating role of severe hot and cold weather conditions on rates ofsociety crimes.
P. 16
Funder
Implementing Agency
Cost Estimation
CONDITIONAL ACTIONS: INDC page link
Enhancing codes of buildings for newly established residential complexestargeting poor families to include proper insulation;
Supporting care giving houses for the orphans, people with special needsand elderly people with measures to install solar energy and productionof own electricity needs.
P. 18
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group