1
Project: IB THERMAL POWER STATION 2x660 MW Date:13-April-2015 SUBJECT : JOB Safety Analysis for Raw water pipe erection No Reference w.r.t. JSA OPGC Comments BGRE Comments 01 Work Activity (Job Steps in sequence) to be included “Wrapping and coating of Underground Pipes” shall be included in the work activity and JSA of it shall be prepared as paint and LPG flame is used for the activity. “Excavation before erection is a sub-activity” and JSA for the activity shall be included. JSA for erection shall be prepared and mentioned. JSA for Pipe Welding shall be prepared and mentioned. JSA for Night work activity shall be prepared and mentioned, if planned or allowed. 02 Material Loading, Unloading, transportation and Stacking of Pipes Present Control Measures :- Inspection of vehicle (trailer), Lifting Equipments ( Hydraulic cranes), Lifting Gears/Appliances ( D- shackles, slings, Chain Pulley Blocks) shall be carried out before start of work. Respective checklists for above shall be filled up on daily basis. Third Party Inspection Certificates of Lifting Gears/Appliances, lifting equipments as per BOCW Act and Rules shall be included in the Page 1 of 1

JSA for Raw Water Pipe Erection Procedure

Embed Size (px)

DESCRIPTION

Job Safety Analysis for raw water pipe erection in power plant. JSA is a part of HIRA

Citation preview

Project:IB THERMAL POWER STATION 2x660 MW Date:13-April-2015SUBJECT: JOB Safety Analyss f!" Ra# #ate" $$e e"e%t!n No Reference w.r.t. JSAOPGC Comments BGRE Comments01Work Activity (Job Steps in sequence) to be included&W"a$$n' an( %!atn' !f Un(e"'"!)n( P$es* shall be included inthe work activity and !A o" it shall be prepared as paint and #P$ "la%eis used "or the activity&Excavation before erection is a sub-activity and JSA forthe activity shall be included.JSA for erection shall be prepared and mentioned.JSA for Pipe Welding shall be prepared and mentioned.JSA for Night or! activity shall be prepared and mentionedif planned or allo!ed.0"#aterial $oadin% &nloadin% transportation and Stackin% of 'ipes'resent (ontrol #easures)*+nspection of vehicle (trailer) $iftin% ,quipments ( -ydraulic cranes) $iftin% .ears/Appliances ( 0* shackles slin%s (hain 'ulley 1locks) shall be carried out before start of !ork.2espective checklists for above shall be 3lled up on daily basis.4hird 'arty +nspection (erti3cates of $iftin% .ears/Appliances liftin% equipments as per 15(W Act and 2ules shall be included in thePa'e 1 o" 1