Job Risk Assessment Form
JOB SAFETY ANALYSIS JSA Full Scale
Task Risk Assessment (TRA) INSTALLED&DISMANTLING
OFSCAFFOLDINGJobtitle/task: JRA:....../JRA.IADS/III/13
NO. JobSequences1 PJSM(PreJobSafetyMeeting)(Penjabaranlangkah/tahapankerjasebelummemulaipekerjaan)2 ToolsandEquipmentpreparation(Persiapanperlengkapan&peralatan)3 RigUp/installedofscaffolds(Pemasanganperancah)4 Remove/dismantleofscaffolds(Pembongkaranperancah)5 Scaffoldsmaterialshandling(Penataanmaterialperancah)6 HouseKeeping(PembersihanArea)
Job Risk Assessment Form
JOB SAFETY ANALYSIS JSA Full Scale
Task Risk Assessment (TRA) INSTALLED&DISMANTLING
OFSCAFFOLDINGJobtitle/task: JRA:....../JRA.IADS/III/13
No AssessmentTeam MeetingDate Signature ReviewTeamReviewDate Signature
NOTE:MinimalRequirementMembertoConductJSAis3(Three)Parties,ex:Maintenance,ProductionandEHSReferenceDocumentsrequired:RiskAssessmentInputsandReferenceDocuments:
Job Risk Assessment Form
JOB SAFETY ANALYSIS JSA Full Scale
Task Risk Assessment (TRA)
JOBTITLE/TASK:
INSTALLED&DISMANTLINGOFSCAFFOLDING
Date:March7th,2013
SECTION:
1.Engineering
SUPERVISOR:
ANALYSISBY:ENG/PROD/EHS NEW REVISED
S:SeverityL: LikelihoodR:Risk
PLANT/LOCATION:
DEPARTMENT:Engineering
REVIEWEDBY:
REQUIREDANDRECOMMENDEDPERSONALPROTECTIVEEQUIPMENT(PPE)FULLBODYHARNESS
APPROVEDBYNote:LOWResidualrisktobeapprovedbyProd.SuperintendentHIGH or MEDIUM Residual risk to be approved by Prod.Manager/OIM
N0 TASKSTEP HAZARD HAZARDEFFECT CONTROLInitialRisk
ACTIONSResidualRisk
S L Risk S L Risk
1 PJSM(PreJobSafetyMeeting)(Penjabaranlangkah/tahapankerjasebelummemulaipekerjaan)
NA
NA
PermitToWork(PTW)(SuratIzinMemulaiPekerjaan)
JobSafetyAnalysis(JSA)(AnalisaKeselamatanKerja)
1
A
L
MakesureallManPowerhavegivensafetybriefingaboutjobandhowtominimizeriskof accident at each step of work beforestarttowork.(Pastikan bahwa semua pekerja telahmendapatkan pengarahan tentangpekerjaan dan bagaimana meminimalisirresiko dari bahaya sebelum memulaipekerjaan)
1
B
L
Job Risk Assessment Form
N0 TASKSTEP HAZARD HAZARDEFFECT CONTROLInitialRisk
ACTIONSResidualRisk
S L Risk S L Risk
2
ToolsandEquipmentpreparation(Persiapanperlengkapan&peralatan)
SlipandTrip(Terpeleset,dantersandung)
Pinchpointandimpactinjury(Terjepitdanmegakibatkanluka)
Ergonomicissue(Salahposisibekerjadanpengangkatanmanual)
Personalinjury(Lukapadaorang/pekerja)
Personalinjury(Lukapadaorang/pekerja)
Backinjury(Lukadansakittulangbelakang)
PermitToWork(PTW)(SuratIzinMemulaiPekerjaan)
JobSafetyAnalysis(JSA)(AnalisaKeselamatanKerja)
ManualHandlingProcedure(ProsedurPenangananManual)
2 C M
ObtainedPTWandJSAinplace(PermitdanJSAtersediadilapangan)
Propermanualhandlingpractice(Melakukandengantatacarapengangkatanyangbenar)
ProperPPEMandatoryisrequired(Alatpelindungdiriyangwajib
dipersyaratkan)
2 B L
3 Slip,Trip,andfall(Terpeleset,tersandung,danterjatuh)
Pinchpoint(Terjepit)
Ergonomicissue(Salahpengangkatan)
Scratchbysharpobject(Tertusukbendatajam)
Personalinjury(Lukapadaorang/pekerja)
Equipmentdamage(Peralatanrusak)
Personalinjury(Lukapadaorang/pekerja)
Personalinjury(Lukapadaorang/pekerja)
Personalinjury(Lukapadaorang/pekerja)
PermitToWork(PTW)(SuratIzinMemulaiPekerjaan)
JobSafetyAnalysis(JSA)(AnalisaKeselamatanKerja)
ManualHandlingProcedure(ProsedurPenangananManual)
Personalcertificationasascaffolder(Personilbersertifikat
2 C M
ObtainedPTW,JSAinplace(Permit,PTW&JSAtersediadilapangan)
Ensuretheworksiteisfreefromtriphazardbeforethejobsstart.(Pastikanareakerjaamandaribahayatersadungdanterpelesetsebelumpekerjaandimualai)
Makesurepersonalinrightpositionduringdismantlingofscaffolds(Pastikansemuapersoneldalamposisiyangbenarselamapembongkaranperancah)
Propermanualhandlingpractice(Melakukandengantatacarapengangkatabyangbenar) ProperPPEMandatoryisrequired
(Alatpelindungdiriwajibdipersyaratkan)
1 B L
Job Risk Assessment Form
N0 TASKSTEP HAZARD HAZARDEFFECT CONTROLInitialRisk
ACTIONSResidualRisk
S L Risk S L Risk
sebagaiscaffolder)
4 Remove/dismantleofscaffolds(Pembongkaranperancah)
Slip,Trip,andfall(Terpeleset,tersandung,danterjatuh)
Pinchpoint(Terjepit)
Ergonomicissue(Salahpengangkatan)
Scratchbysharpobject(Tertusukbendatajam)
Personalinjury(Lukapadaorang/pekerja)
Equipmentdamage(Peralatanrusak)
Personalinjury(Lukapadaorang/pekerja)
Personalinjury(Lukapadaorang/pekerja)
Personalinjury(Lukapadaorang/pekerja)
PermitToWork(PTW)(SuratIzinMemulaiPekerjaan)
JobSafetyAnalysis(JSA)(AnalisaKeselamatanKerja)
ManualHandlingProcedure(ProsedurPenangananManual)
Personalcertificationasascaffolder(Personilbersertifikatsebagaiscaffolder)
2 C M
ObtainedPTW,JSAinplace(Permit,PTW&JSAtersediadilapangan)
Ensuretheworksiteisfreefromtriphazardbeforethejobsstart.(Pastikanareakerjaamandaribahayatersadungdanterpelesetsebelumpekerjaandimualai)
Makesurepersonalinrightpositionduringdismantlingofscaffolds(Pastikansemuapersoneldalamposisiyangbenarselamapembongkaranperancah)
Propermanualhandlingpractice(Melakukandengantatacarapengangkatabyangbenar) ProperPPEMandatoryisrequired
(Alatpelindungdiriwajibdipersyaratkan)
1 B L
5 Scaffoldsmaterialshandling(Penataanmaterialperancah)
Slip,Trip,andfall(Terpeleset,tersandung,danterjatuh)
Pinchpoint(Terjepit)
Ergonomicissue(Salah
Personalinjury(Lukapadaorang/pekerja)
Equipmentdamage(Peralatanrusak)
Personalinjury(Lukapadaorang/pekerja)
Personalinjury(Lukapada
PermitToWork(PTW)(SuratIzinMemulaiPekerjaan)
JobSafetyAnalysis(JSA)(AnalisaKeselamatanKerja)
ManualHandling
2 B L
ObtainedPTW,JSAinplace(Permit,PTW&JSAtersediadilapangan)
Ensuretheworksiteisfreefromtriphazardbeforethejobsstart.(Pastikanareakerjaamandaribahayatersadungdanterpelesetsebelumpekerjaandimualai)
Makesurepersonalinrightpositionduringhandlingmaterial(Pastikansemuapersoneldalamposisiyangbenarselamamenanganimaterial)
1 B L
Job Risk Assessment Form
N0 TASKSTEP HAZARD HAZARDEFFECT CONTROLInitialRisk
ACTIONSResidualRisk
S L Risk S L Risk
pengangkatan) Scratchbysharpobject(Tertusukbendatajam)
orang/pekerja)
Personalinjury(Lukapadaorang/pekerja)
Procedure(ProsedurPenangananManual)
Propermanualhandlingpractice(Melakukandengantatacarapengangkatabyangbenar) ProperPPEMandatoryisrequired
(Alatpelindungdiriwajibdipersyaratkan)
6 Housekeepinganddemobilizationalltoolsandequipment.(Kebersihandankerapihan,sertamengembalikansemuaperalatanyangdigunakan)
Slip,Trip,andfallhazards(Bahayatersandungdanterpeleset)
Pinchpointandimpactinjury.(Terjepitdanmengakibatkanluka)
Personal&backpaininjury(Lukadansakittulangbelakang/keseleo)
PersonalInjury(Personalcidera/terluka)
PermitToWork(PTW)(Suratijinkerja)
JobSafetyAnalysis(JSA)(Analisakeselamatankerja)
ManualHandlingProcedure(Tatacarapengangkatanmanual)
2 B L
ObtainedPTW,JRA,androadmapinplace
(Permit,JRA,danjalurkendaraantersediadilapangan) Ensuretheworksiteisfreefromtriphazardbeforethejobsstart.(Pastikanareakerjaamandaribahayatersandungdanterpelesetsebelumpekerjaandimualai)
ProperPPEMandatoryisrequired(Alat pelindung diri yang wajibdipersyaratkan)
1 B L
Job Risk Assessment Form
LowHigh
Yes
Medium
No
Assign a JSA Team Leader
User invite the JSA Team
Identify the Step Required (Task Step)
Identify hazards for all steps of the task
Identify hazards Effect
Evaluate the Initial Risk
Describe the Existing control
Determine the action for Risk Reduction measure :
Reduce likelihood of event occurring Reduce severity of consequences
Evaluate the Residual Risk (i.e. the risk assuming all controls and Action
are in place and effective)
Is the Residual Risk High,
Medium or Low?
Are additional control measures
required?
Complete any actions before starting work
Ensure the JSA results are communicated to those doing the work
Proceed with work once actions have been closed-out
Note: JSA Pictograms can be used in Safety Toolbox Talks
Job Risk Assessment Form