58
Portfolio & work samples Portafolio y ejemplos de trabajo | B. Arch + M. Arch. | 613–581–1868 | [email protected] | 27 Goulburn Avenue, Ottawa ON K1N 8C7 | www.about.me/jgsoares Juan Gonzalo Soares architecture. urban design. sustainability.

Juan Gonzalo_Portfolio (11x8.5)

Embed Size (px)

Citation preview

Portfolio & work samplesPortafolio y ejemplos de trabajo

| B. Arch + M. Arch.| 613–581–1868| [email protected]| 27 Goulburn Avenue, Ottawa ON K1N 8C7| www.about.me/jgsoares

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

indexíndice

SOLAR p. 19HOUSE

SINGLE p. 13HOUSE

CONDO– p. 7MINIUM 2

ONCE p. 1OFFICES

EXPO p. 49DESIGN

URBAN p. 25DESIGN

SHARED p. 41MOBILITY

ADAPTIVE p. 31REUSE

The projects in this portfolio are the work of a young architectural graduate with profe-sional experience in Spain, recently relocated from Barcelona to Ottawa, and currently freelancing in the National Capital Region.

Fluent in English and Spanish and quickly improving his French; with knowledge and interests on sustainability, energy efficiency and other ways of practicing and understanding Architecture: light, temporary, community involved and ecologically responsible.

Willing to learn new things everyday and eager to build a career in Canada.

If you like what you see, please don’t hesitate to contact me.

1

ONCEOFFICES

projectproyecto

TAGGAT ARQUITECTURA LOGROÑO, 2012-13

descriptiondescripción

type / timelenghttipo / duración

New regional headquarters in Logroño for the Spanish National Association of Blind PeopleNueva sede regional de la ONCE en Logroño

A functional and capable office build-ing, with a tight budget but good spacial qualities and plenty of natural lightUn edificio de oficinas capaz y funcional, con un presupuesto ajustado pero buenas cualidades espaciales y abundancia de luz natural

Project for building permit / 5 months Proyecto de ejecución / 5 meses

Images and drawings courtesy of TAGGAT Arquitectura S.L.Imágenes y planos cortesía de TAGGAT Arquitectura S.L.

2

PLANTA BAJA03. DISTRIBUCIÓN, MOBILIARIO Y SUPERFICIES

1:10003

SUPERFICIE CONSTRUIDA PLANTA BAJA 537,3 m2SUPERFICIE UTIL PLANTA BAJA 484,1 m2

PROYECTO DE EJECUCIÓN

PLANO:

FECHA

Nº PLANO

ESCALA

FEBRERO 2014

JULIAN TORRES - RAUL GONZALOARQUITECTOS

TORRES Y GONZALO ARQUITECTOS S.L.P.ESTUDIO DE ARQUITECTURA

EDIFICIO DELEGACIÓN TERRITORIAL DE LA ONCE EN LA RIOJAC/ CHILE PARCELA 5-A DE LOGROÑO

TOTAL SUPERFICIE CONSTRUIDA DEL EDIFICIO 991,4 m2TOTAL SUPERFICIE UTIL DEL EDIFICIO 876,2 m2

SUPERFICIE CONSTRUIDA PLANTA PRIMERA 383,6 m2SUPERFICIE UTIL PLANTA PRIMERA 341,7 m2

SUPERFICIE CONSTRUIDA PLANTA BAJOCUBIERTA 70,5 m2SUPERFICIE UTIL PLANTA BAJOCUBIERTA 50,4 m2

PROYECTO DE EJECUCIÓN

PLANO:

FECHA

Nº PLANO

ESCALA

FEBRERO 2014

JULIAN TORRES - RAUL GONZALOARQUITECTOS

TORRES Y GONZALO ARQUITECTOS S.L.P.ESTUDIO DE ARQUITECTURA

EDIFICIO DELEGACIÓN TERRITORIAL DE LA ONCE EN LA RIOJAC/ CHILE PARCELA 5-A DE LOGROÑO

10. ALZADOS

1:10010

ALZADO OESTE - PRINCIPAL

ALZADO ESTE

ALZADO SUR ALZADO NORTE

OESTE

SURNORTE

ESTE

Ground floor planPlanta baja

Main elevationAlzado principal

3

PROYECTO DE EJECUCIÓN

PLANO:

FECHA

Nº PLANO

ESCALA

FEBRERO 2014

JULIAN TORRES - RAUL GONZALOARQUITECTOS

TORRES Y GONZALO ARQUITECTOS S.L.P.ESTUDIO DE ARQUITECTURA

EDIFICIO DELEGACIÓN TERRITORIAL DE LA ONCE EN LA RIOJAC/ CHILE PARCELA 5-A DE LOGROÑO

11. SECCIONES LONGITUDINALES A-A' - B-B'

1:10011

A A'

B'B

SECCION LONGITUDINAL A-A'

SECCION LONGITUDINAL A-A'

PROYECTO DE EJECUCIÓN

PLANO:

FECHA

Nº PLANO

ESCALA

FEBRERO 2014

JULIAN TORRES - RAUL GONZALOARQUITECTOS

TORRES Y GONZALO ARQUITECTOS S.L.P.ESTUDIO DE ARQUITECTURA

EDIFICIO DELEGACIÓN TERRITORIAL DE LA ONCE EN LA RIOJAC/ CHILE PARCELA 5-A DE LOGROÑO

12. SECCIONES TRANSVERSALES C-C' - D-D' - E-E' - F-F'

1:10012D'

D

C'

C

E'

E

F'

F

SECCION LUCERNARIO C-C'

SECCIÓN ACCESO E-E'

SECCION ESCALERA D-D'

SECCIÓN AUDITORIO F-F'

Longitudinal sectionSección longitudinal

Cross section through the stairsSección transversal por las escaleras

Cross section through the skylightSección transversal por el lucernario

4

5

ZAPATA DE HORMIGON ARMADO

HORMIGÓN DE LIMPIEZA 10 cm

AISLAMIENTO POLIESTIRENO EXTRUIDO 30+30 mm

SOLERA DE HORMIGÓN ARMADO 20 cm DOBLE MALLAZO #20.20.8

SOLERITA DE MORTERO NIVELACIÓN 7 cm

LÁMINA IMPERMEABLE DE POLIETILENO

LÁMINA ANTIIMPACTO

PARQUET FLOTANTE LAMINADO SINTÉTICO

ENCACHADO DE GRAVA 20 cm

JUNTA DE POLIESTIRENO EXPANDIDO 2 cm

LAMINA GEOTEXTIL

DOBLE LÁMINA IMPERMEABILIZANTE POLIMÉRICA DE 3 Y 4 kg/m²

BALDOSA AISLANTE CON POLIESTIRENO EXTRUIDO 50mm AUTOPROTEGIDA CON MORTERO MODIFICADO 2 cm

IMPRIMACIÓN OXIASFÁLTICA 0,3 kg/m²

ANTEPECHO TERMOARCILLA 14 cm ENFOSCADO AMBAS CARAS

ALBARDILLA ALUMINIO LACADO

BABERO PERIMETRAL DE CHAPA DE ACERO GALVANIZADO

FORJADO PLACAS ALVEOLARES 25+5

FALSO TECHO Y PARAMENTOS VERTICALES ACÚSTICOS

PERFIL VERTICAL GALVANIZADO

TERMOARCILLA ENFOSCADO AMBAS CARAS

AISLAMIENTO POLIESTIRENO EXTRUIDO 50 mm

PERFIL VERTICAL GALVANIZADO

RASTREL HORIZONTAL CADA 60 CMTS

TARIMA DE IPE JUNTA ABIERTA

CARGADERO DINTEL EN ACERO

CORTINERO ALUMINIO LACADO

REMATE MADERA FRISO LAMINADOCARPINTERIA ALUMINIO LACADO

VIERTEAGUAS FACHADA VENTILADA

2%

SALA DE USOS MÚLTIPLES

1:1056

56. DETALLE CONSTRUCTIVO DE FACHADA

SOLERA EXTERIOR 15 cmAPOYADA SOBRE ZAPATAMALLAZO 20.20.8

ADOQUIN PREFABRICADO DE HORMIGÓN COLOCADO CON MORTERO DE CEMENTO

ENCACHADO DE GRAVA 15 cm

1:1055

SOLERITA DE MORTERO DE NIVELACION 7 cm

AISLAMIENTO POLIESTIRENO EXTRUIDO 30+30 mm

PARQUET FLOTANTE LAMINADO

FORJADO UNIDIRECCIONAL 35

AISLAMIENTO POLIESTIRENO EXTRUIDO 30+30 mm

SOLERA DE HORMIGÓN ARMADO 20 cm DOBLE MALLAZO #20.20.8

SOLERITA DE MORTERO NIVELACIÓN 7 cm

LÁMINA IMPERMEABLE DE POLIETILENO

GRES TOMADO CON CEMENTO COLA

ENCACHADO DE GRAVA 20 cm

ZAPATA DE HORMIGON ARMADO

HORMIGÓN DE LIMPIEZA 10 cm

FALSO TECHO REGISTRABLE

YESO LAMINADO SOBRE RASTRELES GALVANIZADOS

AISLAMIENTO TERMICO

ENFOSCADO HIDROFUGO

1/2 ASTA LADRILLO GRESIFICADO BLANCO

CARGADERO ACERO

CORTINERO ALUMINIO LACADO

CARPINTERIA ALUMINIO OSCILOBATIENTECON ROTURA PUENTE TERMICO

2%

LAMINA GEOTEXTIL

DOBLE LÁMINA IMPERMEABILIZANTE POLIMÉRICA DE 3 Y 4 kg/m²

HORMIGÓN ALIGERADO PARA FORMACIÓN DE PENDIENTES

IMPRIMACIÓN OXIASFÁLTICA 0,3 kg/m²

ALBARDILLA HORMIGON BLANCO

LÁMINA IMPERMEABILIZANTE EN JUNTAS

PREFABRICADO HORMIGON

LÁMINA IMPERMEABILIZANTE EN JUNTAS

1/2 ASTA LADRILLO C.V. Y LADRILLO H.D.COLOCADO CON LLAVES

FORJADO UNIDIRECIONAL 35 cm

BALDOSA AISLANTE CON POLIESTIRENO EXTRUIDO 50mm AUTOPROTEGIDA CON MORTERO MODIFICADO 2 cm

ALERO COMPOSITE ALUMINIO

VIDRIO DOBLE HOJA CON CÁMARA 6-12-5

1/2 ASTA LADRILLO C.V. Y LADRILLO H.D.COLOCADO CON LLAVES

55. DETALLE CONSTRUCTIVO DE FACHADA OFICINAS

GRES TOMADO CON CEMENTO COLA

ANGULAR 60.40 EN ACERO GALVANIZADOPARA APOYO DE LA HOJA DE FABRICA

ANGULAR 60.40 EN ACERO GALVANIZADOPARA APOYO DE LA HOJA DE FABRICA

1:1055

SOLERITA DE MORTERO DE NIVELACION 7 cm

AISLAMIENTO POLIESTIRENO EXTRUIDO 30+30 mm

PARQUET FLOTANTE LAMINADO

FORJADO UNIDIRECCIONAL 35

AISLAMIENTO POLIESTIRENO EXTRUIDO 30+30 mm

SOLERA DE HORMIGÓN ARMADO 20 cm DOBLE MALLAZO #20.20.8

SOLERITA DE MORTERO NIVELACIÓN 7 cm

LÁMINA IMPERMEABLE DE POLIETILENO

GRES TOMADO CON CEMENTO COLA

ENCACHADO DE GRAVA 20 cm

ZAPATA DE HORMIGON ARMADO

HORMIGÓN DE LIMPIEZA 10 cm

FALSO TECHO REGISTRABLE

YESO LAMINADO SOBRE RASTRELES GALVANIZADOS

AISLAMIENTO TERMICO

ENFOSCADO HIDROFUGO

1/2 ASTA LADRILLO GRESIFICADO BLANCO

CARGADERO ACERO

CORTINERO ALUMINIO LACADO

CARPINTERIA ALUMINIO OSCILOBATIENTECON ROTURA PUENTE TERMICO

2%

LAMINA GEOTEXTIL

DOBLE LÁMINA IMPERMEABILIZANTE POLIMÉRICA DE 3 Y 4 kg/m²

HORMIGÓN ALIGERADO PARA FORMACIÓN DE PENDIENTES

IMPRIMACIÓN OXIASFÁLTICA 0,3 kg/m²

ALBARDILLA HORMIGON BLANCO

LÁMINA IMPERMEABILIZANTE EN JUNTAS

PREFABRICADO HORMIGON

LÁMINA IMPERMEABILIZANTE EN JUNTAS

1/2 ASTA LADRILLO C.V. Y LADRILLO H.D.COLOCADO CON LLAVES

FORJADO UNIDIRECIONAL 35 cm

BALDOSA AISLANTE CON POLIESTIRENO EXTRUIDO 50mm AUTOPROTEGIDA CON MORTERO MODIFICADO 2 cm

ALERO COMPOSITE ALUMINIO

VIDRIO DOBLE HOJA CON CÁMARA 6-12-5

1/2 ASTA LADRILLO C.V. Y LADRILLO H.D.COLOCADO CON LLAVES

55. DETALLE CONSTRUCTIVO DE FACHADA OFICINAS

GRES TOMADO CON CEMENTO COLA

ANGULAR 60.40 EN ACERO GALVANIZADOPARA APOYO DE LA HOJA DE FABRICA

ANGULAR 60.40 EN ACERO GALVANIZADOPARA APOYO DE LA HOJA DE FABRICA

Auditorium construction detailDetalle constructivo del auditorio

Offices construction detailDetalle constructivo de las oficinas

6

7

CONDO–MINIUM 2

projectproyecto

TAGGAT ARQUITECTURA OYÓN, 2013

descriptiondescripción

type / timelenghttipo / duración

22 dwelling units in lot 18 in Oyón22 viviendas en la U.E. 18 en Oyón

The second of four medium-rise buildings with shared underground parking and pool.The circulation and wet areas are organ-ized around a dense core, freeing the perimeter for ample terraces and big windows, ensuring natural light and un-obstructed viewsEl segundo de cuatro edificios de mediana altura con aparcamiento subterráneo com-partido y piscina.La circulación y zonas húmedas se organizan alrededor de un núcleo denso, liberando el perímetro para amplias terrazas y grandes ventanas, asegurando luz natural y vistas ininterrumpidas

Final as-built documentation / 2 months Documentación final de obra / 2 meses

Images and drawings courtesy of TAGGAT Arquitectura S.L.Imágenes y planos cortesía de TAGGAT Arquitectura S.L.

8

1:505

B

D

C

A

5. BLOQUE 2 - PLANTA BAJADISTRIBUCIÓN, COTAS Y SUPERFICIES

Ground floor planPlanta baja

9

1:506

6. BLOQUE 2 - PLANTA 1ªDISTRIBUCIÓN, COTAS Y SUPERFICIES

C

D

B

A

1:5010

B

A

10. BLOQUE 2 - PLANTA 5ªDISTRIBUCIÓN, COTAS Y SUPERFICIES1st floor plan

Planta primera5th floor plan

Planta 5ª

10

11

Main elevationAlzado principal

Terraces and windowsTerrazas y ventanas

ALZADO OESTE ALZADO ESTE

1:10013

13. ALZADOSBLOQUE 2. ALZADOS ESTE Y OESTEPLANO:

FECHA

Nº PLANO

ESCALA

ABRIL 2012

JULIAN TORRES - RAUL GONZALOARQUITECTOS

TORRES Y GONZALO ARQUITECTOS S.L.P.ESTUDIO DE ARQUITECTURA

PROYECTO MODIFICADO Nº 1 DEL PROYECTO ORIGINAL DE 88 VIVIENDAS, PARA LA FINALIZACION EXCLUSIVA DEL BLOQUE 2 DE 22 VIVIENDAS, EN LA U.E. 18 DE OYÓN (ÁLAVA)

PLANO:

FECHA

Nº PLANO

ESCALA

ABRIL 2012

JULIAN TORRES - RAUL GONZALOARQUITECTOS

TORRES Y GONZALO ARQUITECTOS S.L.P.ESTUDIO DE ARQUITECTURA

PROYECTO MODIFICADO Nº 1 DEL PROYECTO ORIGINAL DE 88 VIVIENDAS, PARA LA FINALIZACION EXCLUSIVA DEL BLOQUE 2 DE 22 VIVIENDAS, EN LA U.E. 18 DE OYÓN (ÁLAVA)

12

13

SINGLEHOUSE

projectproyecto

TAGGAT ARQUITECTURA OLLAURI, 2013

descriptiondescripción

type / timelenghttipo / duración

Single house on a sloped lot in OllauriVivienda unifamiliar en parcela inclinada enOllauri

A single house for a couple, in a topo-graphically complex lot situated over a century-old excavated wine caveUna vivienda unifamiliar para una pareja, en una parcela topográficamente compleja situ-ada sobre una centenaria bodega excavada

Complete project and construction super-vision / 4 months Proyecto ejecutivo y dirección de obra / 4 meses

Images and drawings courtesy of TAGGAT Arquitectura S.L.Imágenes y planos cortesía de TAGGAT Arquitectura S.L.

14

Semi-basement planPlanta -1

Main floor planPlanta principal

1017

22211011011092600

1244

80 390

402

105

500

136

110

347

185

314

669

390

218

115 180 75 180 75 180 79 50 180 130

830

430

910

027

9 35127

27 231 11 348

146 72 218 13 140

929

511

302

430

1152

150

9912

208

110

142

7291

37 510 9 290 37

946

5

150

9 276

43

150

8387

615 11 18412

411

777

113

150

47 47

150

280

150

52

311

680

884

45 72

100

144

1869

AI-03

S=35.5m²SALON-COMEDOR

S=16.3m²DORMITORIO

S=6.8m²VESTIBULO

S=7m²BAÑO

S=3m²DESPENSA

S=13.3m²COCINAS=30.2m²

PORCHE ACCESO

S=2.9m²ESCALERA

S=.9m²CALDERA

S=1m²ARMARIOS=2.8m²

ESCALERA

S=11.7m²DISTRIBUIDOR

S=26.8m²SALA MERENDERO

S=13m²SALA

S=5.4m²BAÑO 2

S=27.3m²TERRAZA

SUPERFICIE ÚTIL

PLANTA PRIMERA

SALON-COMEDOR 35.5M2DORMITORIOBAÑODESPENSACOCINAVESTIBULOESCALERA

16.3M27M23M2

13.3M26.8M22.9M2

CALDERAARMARIO

.9M21M2

TERRAZA 27.3M2

114M2

PLANTA BAJA

SUPERFICIE ÚTIL

5.4M211.7M2

2.8M2

SALA MERENDEROSALABAÑODISTRIBUIDORESCALERA

26.8M213M2

61.7M270

6

84

25

161

910

037

37

ESCALERA BODEGA 2M2

SUPERFICIE CONSTRUIDA

PLANTA PRIMERA

Y(1/2 porche) 118.6M2

PLANTA BAJA

SUPERFICIE CONSTRUIDA 75.2M2

TOTAL EDIFICIO

SUPERFICIE UTILSUPERFICIE CONSTRUIDA

175.7M2193.8M2

P-03

P-01

P-01

P-01

P-01

P-01

P-01

P-01

P-01 P-01

P-01

P-02

PE-03

AI-02

AI-01

AI-04

V-01

V-01

V-02 V-02

V-03 V-03

V-03

V-04V-04

V-04

V-05

V-05

V-06

150 49

156

520 251

78

S=2m²ESCALERA

224

135

9612

AI-03

358042

031:50

PLANTA BAJA Y PLANTA -103. COTAS, SUPERFICIES, MUEBLES Y CARPINTERIAS

Expediente:

12

-00

16

3-5

00

Docum

ento:

12

-00

00

51

4-0

04

-03

84

8

Página:

Arquitecto/s:

70

00

15

T

OR

RE

S Y

GO

NZ

AL

O A

RQ

UIT

EC

TO

S, S

: : :

: : : : : : : :30/0

3/1

2

{1 / 1

}

15

Main elevationAlzado principal

Side elevationAlzado lateral

Cross sectionSección transversal

1/50

04 ALZADOS 04

Expediente:

12

-00

16

3-5

00

Docum

ento:

12

-00

00

51

4-0

05

-04

05

4

Página:

Arquitecto/s:

70

00

15

T

OR

RE

S Y

GO

NZ

AL

O A

RQ

UIT

EC

TO

S, S

: : :

: : : : : : : :30/0

3/1

2

{1 / 1

}

1/50-1/100

05. SECCIONES Y PLANTA DE CUBIERTA 05

Expediente:

12

-00

16

3-5

00

Docum

ento:

12

-00

00

51

4-0

06

-04

36

1

Página:

Arquitecto/s:

70

00

15

T

OR

RE

S Y

GO

NZ

AL

O A

RQ

UIT

EC

TO

S, S

: : :

: : : : : : : :30/0

3/1

2

{1 / 1

}

16

1/10

17. DETALLE CONSTRUCTIVO DE FACHADA

17

Expediente:

12

-00

16

3-5

00

Docum

ento:

12

-00

00

51

4-0

18

-07

02

1

Página:

Arquitecto/s:

70

00

15

T

OR

RE

S Y

GO

NZ

AL

O A

RQ

UIT

EC

TO

S, S

: : :

: : : : : : : :3

0/0

3/1

2

{1 / 1

}

17

Construction detailDetalle constructivo

18

SOLARHOUSE

projectproyecto

ETSAV–UPC SANT CUGAT, 2008

descriptiondescripción

type / timelenghttipo / duración

collaborationscolaboraciones

Solar Fiction, project proposal for Solar Decathlon Europe 2010Solar Fiction, propuesta de proyecto para el Solar Decathlon Europe 2010

A solar house made with upcycled cargo containers. A flexible house, closed and sheltered in winter, open and dynamic in summer.An energy-aware house that works with sun, shade, humidity and airflowUna casa solar construída con contenedores de carga reciclados.Una casa flexible, cerrada y protegida en invierno, abierta y dinámica en verano.Una casa energéticamente consciente que trabaja con el sol, la sombra, la humedad y el flujo de aire

Idea contest proposal / 1 month Propuesta concurso de ideas / 1 mes

Group project (with M. Alcaraz, D. Balbás and M. Olazabal)Proyecto en grupo (con M. Alcaraz, D. Balbás y M. Olazabal)

20

Winter nighttime planPlanta invierno noche

Summer daytime planPlanta verano día

21

Cross sectionSección transversal

22

Interior rendered viewVista interior renderizada

Exterior rendered viewVista exterior renderizada

23

24

URBAN DESIGN

ETSAV–UPC SANT CUGAT, 2008

projectproyecto

descriptiondescripción

type / timelenghttipo / duración

collaborationscolaboraciones

UNITÀ MOBILE: New uses and flexible public spaces for the city of Trieste, ItalyUNITÀ MOBILE: Nuevos usos y espacios libres variables para Trieste, Italia

The project tries to improve Trieste’s ur-ban quality, while at the same time complementing and supporting other strategies for the transformation of the Porto Vecchio area.We propose the construction of a series of mobile floating platforms which allow different configurations of the seafrontEl proyecto intenta mejorar la calidad urbana de Trieste y al mismo tiempo complementar y apoyar otras estrategias para la transformación del ámbito concreto del Porto Vecchio.Se propone la construcción de una serie de plataformas flotantes móviles que permitan distintas configuraciones del frente marítimo

Class project / 4 months Proyecto de curso / 4 meses

Group project (with D. Balbás and C. Gambaro)Proyecto en grupo (con D. Balbás y C. Gambaro)

26

Aerial view over Molo del BersaglieriVista aérea sobre el Molo del Bersaglieri

Aerial view of the islandVista aérea de la isla

Panoramic view from Piazza UnitàPanorámica desde la Piazza Unità

27

Cross section through the dock’s poolSección por la piscina del muelle

Elevation of the island and container hotelAlzado de la isla y el container hotel

28

View of the market’s squareVista de la plaza del mercado

View under the dock’s textile roofVista bajo la cubierta textil del muelle

View of the dock’s dissociated forestVista del bosque disociado del muelle

View of the dock’s access rampVista de la rampa de acceso al muelle

29

30

ADAPTIVEREUSE

ETSAV–UPCSANT CUGAT, 2011-12

projectproyecto

descriptiondescripción

type / timelenghttipo / duración

collaborationscolaboraciones

Adoberíes: Reconnection. Vic (Spain)Adoberíes: Reconexión. Vic

The project proposes to act on the histori-cal site of the Adoberies Velles (leather manufacturing workshops) in Vic (Cata-lonia, Spain), rehabilitating the existing built volumes and implanting a mixed use program, including workshops and artist’s residences, in order to reconnect them with the urban fabric of the cityEl proyecto plantea la intervención sobre el conjunto histórico de las Adoberies Velles de Vic y sus alrededores, rehabilitando los diferentes volúmenes construidos e implan-tando en ellos un programa mixto de talleres y residencia para artistas, con el objetivo de reconectarlos a la trama urbana de la ciudad

M. Arch. Final Project / 8 months Proyecto Final de Carrera / 8 meses

Individual project (renders by L. Torres)Proyecto individual (renders realizados por L. Torres)

32

33

Urban analysisAnálisis urbanístico

1st floor planPlanta 1ª

Ground floor planPlanta baja

34

35

Longitudinal sectionSección longitudinal

Longitudinal section through access gallerySección longitudinal por galería de acceso

Cross sectionsSecciones transversales

36

River (south) facade elevationAlzado fachada río (sur)

River (south) facade current stateFotoalzado fachada río (sur)

Alley (north) facade elevationAlzado fachada calle (norte)

Construction detailsDetalles constructivos

37

38

Rendered view from the access galleryVista renderizad desde la pasarela de acceso

Rendered view from the riverVista renderizadadesde el río

39

Model picturesFotografías de la maqueta

40

SHAREDMOBILITY

URBAN IDEAS 2.0 CONTEST BARCELONA, 2012

projectproyecto

descriptiondescripción

type / timelenghttipo / duración

collaborationscolaboraciones

WikiMOB 2.0, sustainable urban mobility project, chosen amongst the ten finalists of the Urban Ideas 2.0 Contest for Urban EntrepreneursWikiMOB 2.0, proyecto de movilidad ur-bana sotenible, elegido entre los diez final-istas del concurso Ideas Urbanas 2.0 para Emprendedores Urbanos

What would happen with the urban gas stations of Barcelona when we make the transition away from fossil fuels?Can we repurpose these spaces into sus-tainable mobility hubs?How will this transformation affect the buildings and communities near them?¿Qué ocurrirá con las gasolineras urbanas de Barcelona cuando se abandonen los combus-tibles fósiles?¿Podemos reconvertir estos espacios en con-centradores de movilidad sostenible?¿Cómo afectará esta transformación a los edificios y comunidades cercanas?

Open idea contest / 1 month Concurso de ideas abierto / 1 mes

Group project (with D. Balbás and J. J. Teruel)Proyecto en grupo (con D. Balbás y J. J. Teruel)

42

43

Transport stops around the Mobility HubParadas de transporte alrededor del MobHub

Urban gas stations in BarcelonaGasolineras urbanas en Barcelona

A shift on street designUn cambio en el diseño de la vía pública

A shift on buildings and dwellersUn cambio en edificios y habitantes

44

A shift on mobilityUn cambio en la movilidad

A paradigm shiftUn cambio de paradigma

Longitudinal sectionSección longitudinal

45

Volumes, spaces and functionsVolúmenes, espacios y funciones

Cross sectionSección transversal

46

47

An attractive urban space in the middleUn espacio urbano atractivo en el centro

View from the east cornerVista desde la esquina este

48

projectproyecto

descriptiondescripción

type / timelenghttipo / duración

collaborationscolaboraciones

Installation for Raumlabor Berlin at the eme3 2011 International Architecture Festival at the Santa Monica Arts Center, BarcelonaInstalación para Raumlabor Berlin en el Festival Internacional de Arquitectura eme3 2011 en el Centre d’Arts Santa Monica,Barcelona

4 x 3 x 3 meters6 h design time + 6 h assembly time96 Moritz beer crates + 350 zip ties4 tvs + 4 dvd players + 8 headphones4 x 3 x 3 metros6 h tiempo de diseño + 6 h de montaje96 cajas de cerveza Moritz + 350 bridas4 televisores + 4 dvds + 8 auriculares

Commission / 2 days Encargo / 2 días

Group project (with Mariona Alcaraz & Marc Salvadó)Proyecto en grupo (con Mariona Alcaraz y Marc Salvadó)

EXPO DESIGNEME3 ARCH. FESTIVAL

BARCELONA, 2011

50

Isometric viewsVistas isométricas

51

Assembly processProceso de montaje

52

A cozy seatUn asiento cómodo

Perforated vs. solidPerforado contra sólido

53

Portfolio & work samplesPortafolio y ejemplos de trabajo

| B. Arch + M. Arch.| 613–581–1868| [email protected]| 27 Goulburn Avenue, Ottawa ON K1N 8C7| www.about.me/jgsoares

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.

B. Arch + M. Arch. [email protected] Goulburn Ave. Ottawa, ON. K1N 8C7www.about.me/jgsoares

Juan Gonzalo Soaresarchitecture. urban design. sustainability.