June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations – M. Palmer DR Working Group plans

June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

Embed Size (px)

DESCRIPTION

June 16, 2009 Working Group plans Goals of the LC DR Working Group: To give a recommendation on the feasibility of a shorter damping ring by comparing the electron cloud build-up and instability for the 6.4km and 3.2km rings with a 6 ns bunch spacing. DONE: March 2010 by ECLOUD’10 then following the CesrTA program: –1) evaluate the electron cloud in the shorter 3.2 km ring with a 3 ns bunch spacing. –2) give our recommendation on electron cloud mitigations. Furthermore starting late 2010, to fully integrate the CesrTA results into the Damping Ring design.

Citation preview

Page 1: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Today:• Updates on Mitigations KEK – Y. Suetsugu• Updates on photoe- estimates by Synrad3D – K. Harkay• CesrTA last run and updates on mitigations – M. Palmer• DR Working Group plans

Page 2: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

WG Main Deliverables

Recommendation for the reduction of the ILC Positron Damping Ring Circumference

Recommendation for the baseline and alternate solutions for the electron cloud mitigation in various regions of the ILC Positron Damping Ring.

by March 2010

by Late 2010

Characterization of electron cloud at different bunch spacing: 6ns and 3ns by 2010

Page 3: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Working Group plans

Goals of the LC DR Working Group:• To give a recommendation on the feasibility of a

shorter damping ring by comparing the electron cloud build-up and instability for the 6.4km and 3.2km rings with a 6 ns bunch spacing. DONE: March 2010

• by ECLOUD’10 then following the CesrTA program:– 1) evaluate the electron cloud in the shorter 3.2

km ring with a 3 ns bunch spacing. – 2) give our recommendation on electron cloud

mitigations.• Furthermore starting late 2010, to fully integrate the

CesrTA results into the Damping Ring design.

Page 4: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Build up simulationsWe run simulations for both ring configurations 6km and 3km with 6ns bunch spacing: IPAC’10 paper: WEPE097 paper in preparation, submission to journal

Next:1) In 3km ring, run with 3ns bunch spacing2) fill pattern?! Discussion.3) Then: need to include refined estimate of photoelectron production rate by SYNRAD3D. Kathy, Laura and Gerry are working on estimates for the ILC Damping Ring.

Page 5: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Mitigations Table for ILC Damping Ring

DR element % ring Antechamber need

Coating Mitigation Additional Mitigation

DRIFT in STRAIGHT

54 No Solenoid

DRIFT in ARC

33 Downstream of BEND only

Solenoid

BEND 7 Yes

WIGG 3 Yes

QUAD &SEXT

3 Downstream BEND / WIGG

Color code: Green = defined, Red = not yet defined.

Goal is to define mitigations by 2010 or early 2011 as input for ILC TD Phase 2.

Page 6: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Mitigations Table for ILC Damping Ring

DR element % ring Antechamber need

Coating Mitigation Additional Mitigation

DRIFT in STRAIGHT

54 No NEG & Carbon

Solenoid Grooves

DRIFT in ARC

33 Downstream of BEND only

NEG Solenoid Grooves

BEND 7 Yes TiN Grooves

WIGG 3 Yes TiN Clearing Electrodes

QUAD &SEXT

3 Downstream BEND / WIGG

TiN Grooves

Color code: Green = defined, Red = not yet defined.

Goal is to define mitigations by 2010 or early 2011 as input for ILC TD Phase 2.

Page 7: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Presentation of the Work at ILC Damping Ring Meeting

• The Working Group will present a recommendation for mitigations to a Damping Ring meeting and a decision will be then made for the baseline as well as for alternate solutions.

• The mechanism for the decision remains yet to be defined. Within the damping ring group, a decision could be taken by means of a voting system based on scaling factors (example: mitigation costs, effectiveness, durability, maintenance etc.) to be defined.

Page 8: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

• A document produced by the Working Group by late 2010 early 2011, including: the research work, the recommendation on mitigations, the recommendation process and a clear set of criteriae that lead to the recommendation.

Report Document on Mitigations and Recommendation for ILC DR

Page 9: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Report Document on Mitigations and Recommendation for ILC DR

Page 10: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Our presentations posted on web site

ILC Damping Ring Wiki:• https://wiki.lepp.cornell.edu/ilc/bin/view/Public/

DampingRings/

ILC Damping Ring Teleconference page:• https://wiki.lepp.cornell.edu/ilc/bin/view/Public/

DampingRings/TeleConference

Page 11: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Link to all our presentations here

Page 12: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Past ILC DR WG meetings

Page 13: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

WebEx meeting

• Proposed time Next meeting:– Wednesday 14 July 2010

Page 14: June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations

June 16, 2009

Blackboard

Messages board

Messages here