Just in Time:by Sashi Prabhu

Embed Size (px)

Citation preview

  • 8/8/2019 Just in Time:by Sashi Prabhu

    1/20

    JustJust--InIn--TimeTime

    Eliminate WasteEliminate Waste

  • 8/8/2019 Just in Time:by Sashi Prabhu

    2/20

    Flexible ResourcesFlexible Resources

    Multifunctional workersMultifunctional workers

    Operate more than one machine &Operate more than one machine &jobsjobs

    GeneralGeneral--purpose machinespurpose machines

    Machines that are not highlyMachines that are not highly

    specializedspecialized

  • 8/8/2019 Just in Time:by Sashi Prabhu

    3/20

    Cellular LayoutsCellular Layouts

    Manufacturing cellsManufacturing cells

    Often UOften U--shaped or linearshaped or linear

    Work flows through cell in oneWork flows through cell in onedirection and experiences littledirection and experiences littlewaitingwaiting

  • 8/8/2019 Just in Time:by Sashi Prabhu

    4/20

    Pull SystemPull System

    Coordinating production andCoordinating production anddelivery of materials anddelivery of materials andcomponentscomponents

    Traditionally, inventory has beenTraditionally, inventory has beenused as a cushion against lapses inused as a cushion against lapses in

    coordination and inventory can becoordination and inventory can behugehuge

    Pull system a la at USPull system a la at US

    supermarketssupermarkets

  • 8/8/2019 Just in Time:by Sashi Prabhu

    5/20

    Pull SystemPull System

    Do not order more product thanDo not order more product thancan be usedcan be used

    (or items that can be sold)(or items that can be sold)

    Reversal of normal Reversal of normal pushpush systemsystem

  • 8/8/2019 Just in Time:by Sashi Prabhu

    6/20

    Kanban Production ControlKanban Production Control

    SystemSystem Japanese word for cardJapanese word for card

    Associated with fixedAssociated with fixed--qu

    antityqu

    antityinventory systeminventory system

    TwoTwo--bin systembin system KanbanKanban

  • 8/8/2019 Just in Time:by Sashi Prabhu

    7/20

    SmallSmall--Lot ProductionLot Production

    Requires less space and capitalRequires less space and capital

    Produces small amounts at a timeProduces small amounts at a time

    Processes can be moved closerProcesses can be moved closertogethertogether

    Transportation between stations isTransportation between stations is

    simplifiedsimplified Quality problems are easier toQuality problems are easier to

    detectdetect

    Reveals errors and bottlenecksReveals errors and bottlenecks

  • 8/8/2019 Just in Time:by Sashi Prabhu

    8/20

    Lead TimeLead Time

    Processing timeProcessing time

    Can be reduced by reducing numberCan be reduced by reducing numberof items processed and the efficiencyof items processed and the efficiencyor speed of the workeror speed of the worker

    Move timeMove time

    Can be decreased if machines areCan be decreased if machines aremoved closer together, method ofmoved closer together, method ofmovement simplified, routings aremovement simplified, routings arestandardized, or need for movementstandardized, or need for movement

    eliminatedeliminated

  • 8/8/2019 Just in Time:by Sashi Prabhu

    9/20

    Lead TimeLead Time

    Waiting TimeWaiting Time

    Can be reduced through betterCan be reduced through betterscheduling of materials, workers,scheduling of materials, workers,machines and sufficient capacitymachines and sufficient capacity

    Setup TimeSetup Time

    Reduction of setup time is importantReduction of setup time is importantto JITto JIT

  • 8/8/2019 Just in Time:by Sashi Prabhu

    10/20

  • 8/8/2019 Just in Time:by Sashi Prabhu

    11/20

    Quick SetupsQuick Setups

    Streamline all aspects of setupStreamline all aspects of setup

    Organize workplace properly locating toolsOrganize workplace properly locating tools

    near points ofusenear points ofuse Keep machines and fixtures in good repairKeep machines and fixtures in good repair

    Simplify or eliminate adjustmentsSimplify or eliminate adjustments

    precoding desired settings, using locator pins,precoding desired settings, using locator pins,

    etc.etc. Perform setup activities in parallel orPerform setup activities in parallel or

    eliminateeliminate

    Add a person, standardize components,Add a person, standardize components,

    parts, materialsparts, materials

  • 8/8/2019 Just in Time:by Sashi Prabhu

    12/20

    Uniform Production LevelsUniform Production Levels

    Smoothing productionSmoothing productionrequirements on the final assemblyrequirements on the final assembly

    lineline

    Better forecastBetter forecast

    Mixed production throughout the dayMixed production throughout the day

    in small quantities on all productionin small quantities on all productionfacilities.facilities.

  • 8/8/2019 Just in Time:by Sashi Prabhu

    13/20

    Qualityat the SourceQualityat the Source

    For JIT to work, quality has to beFor JIT to work, quality has to behighhigh

    No extra inventory to bufferNo extra inventory to bufferagainst defective unitsagainst defective units

    Producing poorProducing poor--quality items andquality items and

    reworking items or rejecting them isreworking items or rejecting them iswastefulwasteful

    Workers are responsible forWorkers are responsible for

    inspectioninspection

  • 8/8/2019 Just in Time:by Sashi Prabhu

    14/20

    Qualityat the SourceQualityat the Source

    JidokaJidoka Authority to stop production line ifAuthority to stop production line if

    quality problems are encounteredquality problems are encountered AndonsAndons

    Call lights activated by switchesCall lights activated by switches

    Undercapacity schedulingUndercapacity schedulingMaking time to plan, train, solveMaking time to plan, train, solve

    problems, maintain workproblems, maintain workenvironmentenvironment

  • 8/8/2019 Just in Time:by Sashi Prabhu

    15/20

    Qualityat the SourceQualityat the Source

    Visual controlVisual control

    Quality improves when problems areQuality improves when problems are

    made visible and workers have clearmade visible and workers have clearexpectations of performanceexpectations of performance

    Kanbans, andons, process controlKanbans, andons, process control

    charts, tool boards, material handlingcharts, tool boards, material handlingroutes clearly marked, demos,routes clearly marked, demos,instructional photos, performanceinstructional photos, performancedatadata

  • 8/8/2019 Just in Time:by Sashi Prabhu

    16/20

    Qualityat the SourceQualityat the Source

    PokaPoka--yokeyoke

    Foolproof device or mechanism thatFoolproof device or mechanism that

    prevents defects from occurringprevents defects from occurring

    KaizenKaizen

    Continuous improvementContinuous improvement

  • 8/8/2019 Just in Time:by Sashi Prabhu

    17/20

    TotalProductive MaintenanceTotalProductive Maintenance

    Breakdown maintenanceBreakdown maintenance

    Preventive maintenancePreventive maintenance

    Total Productive MaintenanceTotal Productive Maintenance Accurate records on time betweenAccurate records on time between

    breakdownsbreakdowns

    Frequency of breakdownsFrequency of breakdowns

    Costs of breakdownsCosts of breakdowns Determine a preventive maintenanceDetermine a preventive maintenance

    scheduleschedule

    Employee involvementEmployee involvement

    Zero defectsZero defects

  • 8/8/2019 Just in Time:by Sashi Prabhu

    18/20

    Supplier NetworksSupplier Networks

    Working with suppliers to improveWorking with suppliers to improveresponsiveness and qualityresponsiveness and quality

    Trends:Trends: Locate near the factoryLocate near the factory

    Use small, sideUse small, side--loaded trucks and ship mixed loadsloaded trucks and ship mixed loads

    Consider establishing small warehouses near to theConsider establishing small warehouses near to thefactory.factory.

    Use standardized containers and make deliveriesUse standardized containers and make deliveries

    according to a precise delivery scheduleaccording to a precise delivery schedule Become a certified supplier and accept payment atBecome a certified supplier and accept payment at

    regular intervals rather than upon deliveryregular intervals rather than upon delivery

  • 8/8/2019 Just in Time:by Sashi Prabhu

    19/20

    Benefits of JITBenefits of JIT

    Reduced inventoryReduced inventory

    Improved qualityImproved quality

    Lower costsLower costs

    Reduced space requirementsReduced space requirements

    Shorter lead timeShorter lead time Increased productivityIncreased productivity

  • 8/8/2019 Just in Time:by Sashi Prabhu

    20/20

    Benefits of JITBenefits of JIT

    Greater flexibilityGreater flexibility

    Better relations with suppliersBetter relations with suppliers

    Simplified scheduling and controlSimplified scheduling and controlactivitiesactivities

    Increased capacityIncreased capacity

    Better use of human resourcesBetter use of human resources

    More product varietyMore product variety