PUBLIC INVOLVEMENT MEETING RACINE COUNTY ROAD IMPROVEMENTS DECEMBER 14, 2017 T hank you for attending to- day’s meeting and for your interest in the Racine County road improvements. The purpose of the meeting is to introduce the project and to share early design concepts. We also invite you to talk with project staff, share your thoughts and ask questions. Today’s meeting is an open house. The Wisconsin Department of Transportation (WisDOT), will schedule several more meetings like this as project design and construction progresses. Please watch your mail for additional meetings, or contact us to be on our out- reach list (see comment form). Project Description In November 2017, WisDOT took temporary jurisdiction over the following roadways: y County KR between I-94 and 90th Street y County H between County KR and Venice Avenue (north of WIS 11) y Braun Road between I-94 and 90th Street y International Drive from its southerly limit to WIS 11 Temporary jurisdiction was granted because WisDOT has the expertise needed to man- age large and complex projects projects.511wi.gov PAGE 1 with multiple roadways and tight utility coordination time- frames. WisDOT has significant construction planned in the I-94 corridor, and one entity coordinating all road construc- tion in the area will be most efficient and cost effective. The proposed improvements include reconstructing County KR, County H and Braun Road as multilane, divided, urban roadways with storm sewer and a multi-use trail. Reconstruction will also include traffic signals at key intersections. The project will extend Inter- national Drive as a multilane, divided, urban roadway with storm sewer, street lights, and a multi-use trail from its exist- ing southerly limit to WIS 11. WIS 11, from 56th Road to 1,500 feet east of County H, will also be reconstructed to an urban, multilane roadway with storm sewer and street lights. At today’s meeting ... y Please review aerial views of development roadways, as well as exhibits showing traffic, utilities, environmental process and schedule information. y Project staff are available to answer your questions. y Real estate representatives from the Village of Mount Pleasant are also available to discuss right of way acquisition. Area 1 Area 2 Area 3 W i s conn Valley W a y W i s conn Valley W a y MOUNT PLEASANT STURTEVANT MOUNT PLEASANT YORKVILLE RACINE CO. KENOSHA CO. 94 41 V A 20 KR C H EA MB 11 C H 11 50th Rd 50th Rd Braun Rd Braun Rd 60th Rd 60th Rd 58th Rd 58th Rd 5 6 t h R d 5 6 t h R d 7th St 7th St W Frontage Rd W Frontage Rd E Frontage Rd E Frontage Rd West Rd West Rd Fancher Rd Fancher Rd 90th St 90th St I n t e r n a t i o n a l Dr I n t e r n a t i o n a l Dr Wisconn Valley Way will be constructed on new alignment connecting County KR, Braun Road, and WIS 11.

K RAMOND RACINE COUNTY Nicholson RdROAD IMPROVEMENTS · PUBLIC INVOLVEMENT MEETING RACINE COUNTY Nicholson RdROAD IMPROVEMENTS DECEMBER 14, 2017 Thank you for attending to- day’s

  • Upload
    builien

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

PUBLIC INVOLVEMENT MEETING

RACINE COUNTY ROAD IMPROVEMENTS

DECEMBER 14, 2017

T hank you for attending to-day’s meeting and for your

interest in the Racine County road improvements.

The purpose of the meeting is to introduce the project and to share early design concepts. We also invite you to talk with project staff, share your thoughts and ask questions.

Today’s meeting is an open house. The Wisconsin Department of Transportation (WisDOT), will schedule several more meetings like this as project design and construction progresses. Please watch your mail for additional meetings, or contact us to be on our out-reach list (see comment form).

Project DescriptionIn November 2017, WisDOT took temporary jurisdiction over the following roadways:

y County KR between I-94 and 90th Street

y County H between County KR and Venice Avenue (north of WIS 11)

y Braun Road between I-94 and 90th Street

y International Drive from its southerly limit to WIS 11

Temporary jurisdiction was granted because WisDOT has the expertise needed to man-age large and complex projects

projects.511wi.gov PAGE 1

with multiple roadways and tight utility coordination time-frames. WisDOT has significant construction planned in the I-94 corridor, and one entity coordinating all road construc-tion in the area will be most efficient and cost effective.

The proposed improvements include reconstructing County KR, County H and Braun Road as multilane, divided, urban roadways with storm sewer and a multi-use

trail. Reconstruction will also include traffic signals at key intersections.

The project will extend Inter-national Drive as a multilane, divided, urban roadway with storm sewer, street lights, and a multi-use trail from its exist-ing southerly limit to WIS 11.

WIS 11, from 56th Road to 1,500 feet east of County H, will also be reconstructed to an urban, multilane roadway with storm sewer and street lights.

At today’s meeting ...

y Please review aerial views of development roadways, as well as exhibits showing traffic, utilities, environmental process and schedule information.

y Project staff are available to answer your questions.

y Real estate representatives from the Village of Mount Pleasant are also available to discuss right of way acquisition.

Area 1

Area 2

Area 3

Wis

conn

Val

ley

Way

Wis

conn

Val

ley

Way

General MitchellInternationalAirport

KenoshaRegionalAirport

CITY OF MILWAUKEE

CITY OF RACINE

CITY OF KENOSHA

MOUNTPLEASANT

STURTEVANT

KNEELAND

OAK CREEK

PLEASANT PRAIRIE

CALEDONIA

BRISTOL

UNION GROVE

HALES CORNERS

SOUTHMILWAUKEE

EAGLE LAKE

BRIGHTON

PADDOCK LAKE

KANSASVILLE

PARIS

YORKVILLE

RAYMOND

UNION CHURCH

FRANKLIN

MUSKEGO

MOUNTPLEASANT

YORKVILLE

MILWAUKEE CO.

RACINE CO.

RACINE CO.

KENOSHA CO.

WA

UK

ES

HA

CO

.

MIL

WA

UK

EE

CO

.

894 43

94

94 43

94

41

94

94

V

V

36

241

119

32

K

100

100

32

32

3138

38

38

20

11

32

A

E

31

31

20

50

50

32

142

158

31

158

G

KR

142

24

36

45

45

45

20

45

45

45

C

A

D

U

U

D

H

EA

EA

MB

UE

H

100

45

45

43

41

24

100

J

G

MB

MB

142

D

C

11

C

C

K

H

43

75

142

5083

11

75

36

G

KR

NN

EW

K

S

K

38

794

24

11

Elm RdElm Rd

Edgerton AveEdgerton Ave

Grange AveGrange Ave

Drexel AveDrexel Ave

Puetz RdPuetz Rd

Rawson AveRawson Ave

Ramsey AveRamsey Ave

College AveCollege Ave

13th

St

13th

St

51st

St

51st

St

76th

St

76th

St

92nd

St

92nd

St

Layton AveLayton Ave

How

ell A

veH

owel

l Ave

Ryan RdRyan Rd

Oakwood RdOakwood Rd

7 Mile Rd7 Mile Rd

8 Mile Rd8 Mile Rd

5th

St

5th

St

4 Mile Rd4 Mile Rd

2 Mile Rd2 Mile Rd

50th Rd50th Rd

27th

St

27th

St

51st

St

51st

St

Braun RdBraun Rd60th Rd60th Rd

100t

h A

ve10

0th

Ave

38th St38th St

60th St60th St

93rd St93rd St

22nd

Ave

22nd

Ave

Mea

chem

Rd

Mea

chem

Rd

22nd

Ave

22nd

Ave

Wilmot RdWilmot Rd

88th

Ave

88th

Ave

58th Rd58th Rd

How

ell R

dH

owel

l Rd

Nic

hols

on R

dN

icho

lson

Rd

Nic

hols

on R

dN

icho

lson

Rd

56th Rd56th Rd

LakeMichigan

Golf RdGolf Rd

60th

St

60th

St

7½ Mile Rd7½ Mile Rd

88th

Ave

88th

Ave

104t

h A

ve10

4th

Ave

76th

St

76th

St

92nd

St

92nd

St

Cap

e R

dC

ape

Rd

Oakwood RdOakwood Rd

108t

hSt

108t

hSt

39th

Ave

39th

Ave

68th

St

68th

St

Bell RdBell Rd

152n

d A

ve15

2nd

Ave

128t

h A

ve12

8th

Ave

136t

h A

ve13

6th

Ave

Layton AveLayton Ave

35th

St

35th

St

1st St1st St

5 Mile Rd5 Mile Rd

6½ Mile Rd6½ Mile Rd

51st

St

51st

St

43rd

St

43rd

St

7th St7th St

Somers RdSomers Rd

W F

ront

age

Rd

W F

ront

age

Rd

E F

ront

age

Rd

E F

ront

age

Rd

Wes

t Rd

Wes

t Rd

Spring StSpring St

Em

mer

tsen

Rd

Em

mer

tsen

Rd

Fanc

her R

dFa

nche

r Rd

108t

hSt

108t

hSt

Church RdChurch Rd

60th

St

60th

St

Cal

houn

Rd

Cal

houn

Rd

Grange AveGrange Ave

Howard AveHoward Ave Howard AveHoward Ave

Cold Spring RdCold Spring Rd

Cleveland AveCleveland AveCleveland AveCleveland AveCleveland AveCleveland Ave

124t

h S

t12

4th

St

Beloit Rd

Beloit Rd

National

Ave

National

Ave

35th

St

35th

St

20th

St

20th

St

Oklahoma AveOklahoma Ave

Morgan AveMorgan Ave

Oklahoma AveOklahoma AveOklahoma AveOklahoma Ave

Pen

nsly

vani

a A

veP

enns

lyva

nia

Ave

Pac

kard

Ave

Pac

kard

Ave

Lake Dr

Lake Dr

90th

St

90th

St

Inte

rnat

iona

l Dr

Inte

rnat

iona

l Dr

Wisconn Valley Way will be constructed on new alignment connecting County KR, Braun Road, and WIS 11.

RACINE COUNTY ROAD IMPROVEMENTS Public Involvement Meeting | December 14, 2017

For more project information or to be added to the Road Improvements project contact list:

CONTACTINFORMATION

Mike Pyritz, Communications Manager WisDOT Southeast Region (262) 521-5373 [email protected]

projects.511wi.gov PAGE 2

2017 2018 2019 2020

Design

Environmental Tasks

Public Outreach

Construction

= Public Involvement Meeting

WisDOT anticipates reconstructing Inter-national Drive and Braun Road, sched-uled to begin in summer 2018.

International Drive reconstruction is sched-uled to be completed by December 2018, and Braun Road reconstruction is sched-

uled to be completed by the end of 2019.

WisDOT will coordinate work on road improvements with anticipated work on

I-94 and area developments to accommo-

date freeway diversion and local traffic,

construction-worker access, construc-

tion-material delivery, and utility work.

Project Schedule

Before and in conjunction with the road improvements, significant public and private utility construction will occur.

Wisconn Valley Way is a new north-south roadway between County KR and WIS 11. This multi-lane controlled access road-way will accommodate development traf-fic and control access to manage safety and mobility. The location and design of Wisconn Valley Way is also consistent with the WisDOT/Mount Pleasant MOU regarding long-term frontage road devel-opment and access management.

Wisconn Valley Way

Right of way acquisition will be necessary to build the necessary road improvements. Except for WIS 11 west of I-94, the Village of Mount Pleasant is acquiring and paying for all necessary right of way including relocations. Representatives from both the village and department’s real estate teams are available tonight to explain the process and answer questions.

Because of the zoning, development and the projected traffic volumes, access control is necessary to maintain safety and mobility. The Village of Mount Pleasant is paying for and purchasing access rights on County KR, County H, Braun Road, and International Drive. On behalf of the department, the Village of Mount Pleasant will be paying for and acquiring access rights on Wisconn Valley Way, WIS 11, and the East Frontage Road.

Right of Way Acquisition

Protecting the EnvironmentAll work on the roadway improvements will be done per the WisDOT/DNR cooperative agreement. The agencies will jointly address environmental issues including wetlands, water resources and water quality, floodplains, and threatened and endangered species. Through the cooperative agreement, DNR reviews and recommends design and construction practices to comply with applicable environmental and regulatory requirements.