-. TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5 Rojhan Street ~ehkashan Clifton Karachi - 75600 Pakistan TeI : -t 92-21 -35876994 - 7 Fax : +92-21-35876991 & 35876993 Email : [email protected] November 28,2019 Islamabad, Pakistan Subject: -- p\ i--9 y* 1. Dear Sirs: ;s t Pursuant to the applicable laws of Pakistan, including the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997, as amended from time to time and the rules and regulations made k. thereunder (including rules 16(6) of the NEPRA Tariff Standard and Procedure Rules, 1998 read witb A regulation 3(2) of the N E P M (Review Procedure) Regulations, 2009, each as amended or modified from time to time, TMAL ENERGY (I? ED ($company duly established and existing under the laws of Pakistan with its registered lamabad) (the Compan h submits to the NATIONAL ELECTRIC POWER REGULATORY AUTH y (the ~~th~~iQ), for tg% Authority's kind consideration and approval, this motion for leave for review (together with the infomation 5'- Ta2b and amexures attached thereto) in respect of the Authority's decision dated November 20, 2019, bearing reference No. ??'El? TW-460/TEPL-20 1 8/24804-24806 (Case No. WP w-460/TEPL-20 18) issuec- b% to the Company, based on the grounds set out here-in (the Motion for Leave for &view). 8 2. The Motion for Leave for Review (including its amexures) are submitted in three, together with: P - - " : * &% , + p (a) a Bank Draft No. 0 1 5549 18 dated November 26,20 19 amounting to PKR 8 14,8801- (Pakistani P%8pb R u p e s Eight Hundred ourt teen Thousand Eight Hundred Eighty only) drawn in favour of the dy Authority, as the application fee for the Review Motion; 4 - +> (b) board resolution of the Company; and ib7, 8 (c) affidavii. Qf 3. Ln light of the submissions set out in the Motion for Leave for Review and the infomation attached to the .xvL$ same, the Authority is kindly requested to process the Motion for Leave for Review at the earliest, thereby 8 enabling the Company to proceed further with meeting the objectives, as set out in the Motion for Leave \. < for Review, critically dependent on the submissions set out in the Motion for Leave for Review. -\ k, Respectfully submiEed, CHIEF EXECUTIVE OFFICER Registered Onice : 155-4 4 Street No. 37 Sector F-10-1 @ Islamabad @ Pakistan @ Tel : c92-51-2344413 @ Fax : i92-51-2344411 PIanl : Deh-Golidpass Tapo Gabcipat @ Hub River Road 5 Taiuka & District Karachi (West) e Karachi Pakistan Pe1 : 192-2i -35205393 @ Fax : i- 92-21-35205393 a Main Ofi Fax Extn : 301 Control Room Fax Exfn : 302 r

k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5

-. TAPAL ENERGY

The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511,

Corporate Office: F-25 Block 5 Rojhan Street ~ehkashan Clifton Karachi - 75600 Pakistan TeI : -t 92-21 -35876994 - 7 Fax : +92-21-35876991 & 35876993 Email : [email protected]

November 28,2019

Islamabad, Pakistan

Subject: -- p\ i--9

y* 1.

Dear Sirs: ;s t

Pursuant to the applicable laws of Pakistan, including the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997, as amended from time to time and the rules and regulations made k. thereunder (including rules 16(6) of the NEPRA Tariff Standard and Procedure Rules, 1998 read witb

A

regulation 3(2) of the N E P M (Review Procedure) Regulations, 2009, each as amended or modified from time to time, TMAL ENERGY (I? ED ($company duly established and existing under the laws of Pakistan with its registered lamabad) (the Compan h

submits to the NATIONAL ELECTRIC POWER REGULATORY AUTH y (the ~ ~ t h ~ ~ i Q ) , for tg% Authority's kind consideration and approval, this motion for leave for review (together with the infomation 5'- Ta2b and amexures attached thereto) in respect of the Authority's decision dated November 20, 2019, bearing reference No. ??'El? TW-460/TEPL-20 1 8/24804-24806 (Case No. W P w-460/TEPL-20 18) issuec- b%

to the Company, based on the grounds set out here-in (the Motion for Leave for &view). 8 2. The Motion for Leave for Review (including its amexures) are submitted in three, together with: P

--":*&%,+ p (a) a Bank Draft No. 0 1 5549 18 dated November 26,20 19 amounting to PKR 8 14,8801- (Pakistani

P%8pb

R u p e s Eight Hundred ourt teen Thousand Eight Hundred Eighty only) drawn in favour of the dy

Authority, as the application fee for the Review Motion; 4 -+>

(b) board resolution of the Company; and ib7, 8

(c) affidavii.

Qf 3. Ln light of the submissions set out in the Motion for Leave for Review and the infomation attached to the .xvL$

same, the Authority is kindly requested to process the Motion for Leave for Review at the earliest, thereby 8 enabling the Company to proceed further with meeting the objectives, as set out in the Motion for Leave \. < for Review, critically dependent on the submissions set out in the Motion for Leave for Review. -\

k,

Respectfully submiEed,

CHIEF EXECUTIVE OFFICER Registered Onice : 155-4 4 Street No. 37 Sector F-10-1 @ Islamabad @ Pakistan @ Tel : c92-51-2344413 @ Fax : i92-51-2344411

PIanl : Deh-Golidpass Tapo Gabcipat @ Hub River Road 5 Taiuka & District Karachi (West) e Karachi Pakistan Pe1 : 192-2 i -35205393 @ Fax : i- 92-21 -35205393 a Main O f i Fax Extn : 301 Control Room Fax Exfn : 302 r

Page 2: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 3: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 4: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 5: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 6: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 7: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 8: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 9: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 10: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 11: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 12: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 13: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 14: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 15: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 16: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 17: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 18: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 19: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 20: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 21: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 22: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 23: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 24: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 25: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5
Page 26: k. Review Petitio… · TAPAL ENERGY The Registrar, National Electric Power Regulatory Authority, NEPRA Tower, Attaturk Avenue (East), Sector 6-511, Corporate Office: F-25 Block 5