22
 1                                                           Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre, Email = [email protected] Gulshan-1, Dhaka – 1212, Bangladesh. Zip Code – 1349. Tel: +88-02-8852969, +88-02-8852646 Fax: +88-02-8852748, +88-02-8850330 www.palmalgroup.net  

Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

  • Upload
    vudat

  • View
    254

  • Download
    6

Embed Size (px)

Citation preview

Page 1: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

1

  

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                              Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre, Email = [email protected] Gulshan-1, Dhaka – 1212, Bangladesh. Zip Code – 1349. Tel: +88-02-8852969, +88-02-8852646 Fax: +88-02-8852748, +88-02-8850330

www.palmalgroup.net  

Page 2: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

Page 3: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

3

1. MR. NAFIS SIKDER         Managing Director         Palmal Group of Industries Ltd. 

        Gulshan, Dhaka, Bangladesh. 

3. Major Sofiul Azam Chowdhury (Retd.)

     Director – Admin & Compliance 

     Tel: +88‐02‐8852969, +88‐02‐8852646 

     Fax: +88‐02‐8852748, +88‐02‐8850330 

     E‐mail: [email protected] 

4. K.M Mahtab Uddin.

     Director – Admin & HR 

     Tel: +88‐02‐8852969, +88‐02‐8852646 

     Fax: +88‐02‐8852748, +88‐02‐8850330 

     E‐mail:  [email protected]  

5. Md. Salauddin Ahmed.

     Head of Merchant – H&M Division. 

     Tel: +88‐02‐8852969, +88‐02‐8852646 

     Fax: +88‐02‐8852748, +88‐02‐8850330 

     E‐mail:  [email protected]  

 

 

 

      

       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

2. Mr. A. K. M. Sazzadul Karim

     Director & Chief Operation Officer 

     Tel: +88‐02‐8852969, +88‐02‐8852646 

     Fax: +88‐02‐8852748, +88‐02‐8850330 

     E‐mail: [email protected] 

Page 4: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

                               

                                                   

 

   

 

 

 

Md. Ferdous Chowdhury Manager Admin & Compliance Contact No: 01714097830/ 01712‐640630 E‐mail:  [email protected]   

Md. Lutfar Rahman Ripon D.G.M . Admin, HR & Compliance 

Cell: 01714097867 

E‐mail: [email protected]

  Lt. Col. Abdun Nayeem (Retd. )   Director Admin & Surveillance    Cell: 01730068382   E‐mail: [email protected] 

Mr. Harez Miah

 Manager ‐ Admin & HR 

Contact No: 01730010481 

E‐mail: [email protected] 

Mr. K M G Forkan

Manager‐ Admin & HR 

Contact No: 01714096225 

E‐mail: [email protected] 

Page 5: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mr. Din Islam

A.G.M Production  

Contact No: 01730068458 

E‐mail: [email protected] 

Mr. Badsha Mia

Sr. Factory Manager  

Contact No: 01714097859 

E‐mail: 

[email protected] 

Mr. Faruq

Production Manager (Unit – 01) 

Mobile No: 01688106585 

 

Md. Atiqur Rahaman ( Atiq) 

Sr. Production Manager (Unit – 03) 

Mobile No: 01999919043 

 

 

Md‐ Abdul Mozid

Production Manager (Unit – 04) 

Mobile No: 01716685981 

 

 

Mr. Md. Quceruzzaman

G.M Quality Assurance (H&M Division) 

Contact No: 01688106651 

E‐mail: [email protected] 

Page 6: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

6

 

 

   

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 7: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

7

 

 

 

   

     

Date of foundation December,2009

No. of Fire Exit Route  03 Ways. 

No. of Emergency Exit of window  80 Ways 

Medical with Doctor’s & Paramedics 3 

WeeklyHoliday 01Day(Friday)

YearlyFestivalLeave 13DaysYearlyMedical/SickLeave 14DaysYearlyEarnLeave Asperlaw

Officetime 9.00AM‐6.00P.M

LunchTime12.40P.M‐01.40P.M,01.00 P.M‐02.00P.M&01.20P.M‐02.20P.M.01.40PM‐2.40PM

ProductionCapacity 14,40,000to17,00000pcsTotalGarmentsProductionLine 20 LineMachinePerline 45PcsNumberofFloors 6StairCaseWidth 84”,72”&72”MainExitWidth 10’FactoryLicenseNo 14315/Dhaka

 

 

 

Name of 

Certification 

Last Audit Date  Certificate 

Number  

Audited by   Result   Remarks 

BSCI  18 & 19‐10‐2016  336243 ALGI Good(B)  17/10/2018

WRAP  03 & 04‐10‐2016  15257 ITS Gold 

ICS  18/02/2014    ITS  B   

WCA  30.11/1.12‐2016  14017 ITS 90 % 

ISO  16/04/2014  C1/15518  Certification Int.  Bangladesh 

Certified  Valid up to 

2017 

SEDEX  16 & 17 May/ 2015 23 & 24 

February,2016  

  Algi SGS 

Approved 

 

 

Oeko‐Tex  07.04.2015  14.HBD.48242  Hohenstein  Approved  Valid up to 

30.09.2015 

Page 8: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

8

 

 

 

 

Name of Buyer  Last Audit Date 

Audit Status Audited by  Standard

Primark Initial Audit Follow Up Follow Up Metal Detection Audit Follow Up Follow Up 

 12/07/2010 31/03/2011 16/05/2011 31/05/2011 07/12/2011 13/11/2012 19/02/2013 

Amber  Sedex Pass 

Best Practice Pass Pass 

       PASS 

Self TUV Self STR Self Self 

Level Work Ltd.  

Approved  Approved  Approved  

140 Out of 144 

Approved  Approved  Approved  

C & A COC Audit Follow Up Audit Follow Up Audit 

 15/07/2010 02/08/2011 27/02/2012 

Pass Pass Pass 

       Socam Socam Socam 

Approved Approved Approved 

Zara COC Initial Audit 

 11/10/2010  Pass  ITX  Approved 

PVH  11/11/2010 Pass ZXY Approved

Next Initial Audit Follow Up Audit Follow Up Audit Follow Up Audit Follow Up Audit Follow Up Audit Follow Up Audit 

 06/04/2011 23/01/2012 18/10/2012 15/09/2014 15/06/2015 18/02/2016 7/11/2016 

Grade ‐03 Grade ‐03 Grade ‐03 Grade‐ 03 Grade‐ 03 Grade‐ 03 Grade‐ 03 

Self Self Self Self Self Self Self 

Approved Approved Approved Approved Approved Approved Approved 

Mother Care Initial Audit Follow Up 

 24/02/2011 31/03/2011 

Pass Pass 

Self TUV 

Approved Approved 

Wal‐ Mart Initial Audit Follow Up ( RS ) Follow Up ( RS )  CT‐PAT CT‐PAT CT‐PAT  

 27.06.2011 05.05.2015 09.05.2016 

 31.08.2014 25/08/2015 31.07.2016 

 

Yellow Yellow Yellow 

 94% 96% 

97.75% 

STR Elevate BV  

ITS Bureau Veritas Bureau Veritas   

Approved Approved Approved  

 Approved Approved Approved 

 

Page 9: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

9

 

Name of Buyer  Last Audit Date 

Audit Status Audited by  Standard

H & M Initial Audit  1St Follow up  2nd Follow UP  3rd Follow Up  Initial Audit Follow up Unan.  follow up H &M. Higg Index.    H &M. Higg Index H & M. SIPP. Joint Asses H & M. HIGG. Validation  H & M  ( MOLD) 

 12/ 07/2011 &13/07/2011 23/01/2012 

 18/07/2012 

 18/04/2013 

 31/12/2013 10/06/2014 15/12/2014 

 

13/08/2015 01.03.2016 02.06.2016 08.08.2016 

 25/7/2016 

COC‐79%, MS‐48% 

COC‐79%, MS‐58% COC‐82%, MS‐

70% COC‐85%, MS‐

72% COC‐83%, COC‐ 84% 

     COC‐84% Soc.242.Env.17%Soc.257,Env.30%Check All Data Social –229 Env‐46 

74.42  

Self  

Self  

Self             Self 

 Self Self Self Self 

Jointly Self 

Self (Jointly) Joint Validation  BV 

Approved  

Approved  

Approved      Approved 

 Approved Approved Approved Approved Approved Approved Approved 

 Approved 

 

The Walt‐Disney Initial Audit 

 22/09/2011  Pass  Bureau Veritas  Approved 

Debenhams Initial Audit  Follow Up Review Inspection 

 18/12/2011 19/12/2011 03/06/2012 22/06/2013 

Sedex  

Sedex Pass 

SGS  

SGS Ms. Lisa (Sr.Com. 

Man.) 

Approved  

Approved 

The Benetton Asia QA  & COC QA & COC 

 28/05/2011 15/06/2011 

Pass Pass 

Self Self 

Approved Approved 

Carre Four Initial Audit Follow up Audit Initial Audit Initial Audit Follow up Audit  Follow up Audit 

 08/01/2012 13/11/2012 12/02/2014 18/03/2014 15/09/2014 

26 & 27/12/2016 

‘B’ ‘B’ ‘B’ ‘B’ ‘B’ ‘B’  

     ITS ITS ITS 

TUV SUD ITS TUV‐

RHEINLAND 

Approved Approved Approved Approved Approved Approved 

 

New Look Initial Audit Follow up Follow up Follow up 

 18/03/2012 20/05/2012 21/06/2012 27/07/2013 

Pass Pass Pass Pass 

Self Self Self Self 

Approved Approved Approved 

Page 10: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

10

Takko Fashion Initial Audit Follow Up Follow Up Follow Up Follow Up Follow Up Follow Up 

 19/09/2011 04/01/2012 28/05/2012 07/11/2012 25/03/2013 05/06/2013 24/06/2013 

Pass Pass Pass Pass Pass Pass Pass 

Self Self Self Self Self Self Self 

Approved Approved Approved Approved Approved Approved Approved 

Woolworths Ethical & QM Follow Up Follow Up Follow Up Ethical & QM (Dev)       

 30/05/2010 23/07/2013 05/09/2013 24/10/2013 26/11/2014 

 

Pass Pass Pass Pass Pass 

LI & Fung Qualspec Qualspec Qualspec 

Self  

 

Approved Approved Approved Approved Approved 

 

Carter’s Fire Safety Audit Initial Audit 

 05/12/2012 14/03/2013 

WCA WCA (84%) 

ITS ITS 

Approved Approved 

Tesco COC Initial  

1/06/20132/06/2013  SEDEX( Pass)  Algi  Approved 

Perry Ellis QA & COC 

25/03/2013  Pass  Self  Approved 

The Group Auchan Initial Audit QA  & COC QA & COC Initial Audit 

 17/07/2013 

  

10/02/2014 

COC 85%  QA 83% 

  

Self   

SGS 

Approved   

Approved 

The Just Group Initial Audit 

 22/07/2013  WCA  Self 

 Approved 

 

Loblaw. WCA. Follow Up  Follow Up Initial Audit   

 25/08/2013 14/09/2014 14.10.2015 

 WCA WCA 

          93% 

 

 

ITS ITS ITS 

 Approved Approved Approved 

 

WRAP Initial Audit Initial Audit 

03&04‐10‐201623.04.2015 20/11/13 

PassPass Pass 

ITSITS ALGI 

GoldGold Gold 

BSCI Initial Audit 

18 & 19‐10‐2016 

6/10/2013 GoodGood 

ALGI RdR 

ApprovedApproved 

Inditex (Arup) Initial Audit 

 29/10/2015  Pass                 ITS  Approved 

Lamour Ins. Initial Audit 

 19/01/2014  Pass  Self  Approved 

Charles Vogles Initial Audit 

 22/04/2014  Pass  Self  Approved 

Triton Textile Initial Audit 

 20/02/2014  Pass  SGS  Approved 

Lidl  Follow Up Audit Initial Audit Follow Up Audit 

 14.05.2015 19 & 20.02.2014  

02.01.2017 

Pass Pass Pass 

Self Self  Self  

Approved Approved Approved 

Diadora (ZXY) Initial Social Compliance & Structural Safety 

19/08/201530/04/2014 

PassPass 

SelfSelf 

ApprovedApproved 

Page 11: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

11

 

 

Name of Buyer  Last Audit Date 

Audit Status Audited by  Standard

Zara (Inditex) Fire Safety Building Safety 

 26/06/2013 17/12/2013 

Pass Pass 

SGS Self 

Approved Approved 

Joe Fresh‐ Loblaw  Structural Safety & Fire safety 

 15/04/2014 27/09/2016 

Pass Pass 

ITS ITS 

 Need Improvement 

Alliance  Structural Safety & Fire safety 

Initial Fire Assessment   1st Remediation follow up 2nd Remediation Follow Up 3rd Remediation  4th Remediation   

Accord 1st Follow up 2nd Follow Up 3rd Follow Up 

 22/03/2014 

08/05/2014 20/04/2015 26.11.2015 20.07.2016 08.02.2017  

17/11/2015 17/07/2016 05/03/2017 

 Pass 

           Pass             69 % Done            82 % Done            90 % Done  

           91 % Done  

        

         56% Done          85% Done         89 % Done 

 Shahidullah & New 

Associates 

BV Self Self Self Self Self Self 

Approved   

Approved Approved Approved 

CAP CAP 

Next Fire Safety Fire Safety Assessment 

Building Safety Audit 

 18/09/201231/03/201329/06/2013

 Pass Pass Pass 

 Self Self Self 

 Approved Approved Approved 

Debenhams Review Inspection 

 

22/06/2013 Pass Miss. Lisa (Sr. Man. Compl) 

 

Approved 

Carrefour Safety Audit Re audit 

 06/03/2013 18/02/2014 

Pass Pass 

     ITS ITS 

 Approved Approved 

Carter’s Fire Safety Audit Initial Audit 

 05/12/201214/03/2013 

WCA WCA (84%) 

ITS ITS 

Approved Approved 

Wal‐Mart Safety Audit ( Electrical safety assessment ) Building safety  assessment  

 29/06/2013 

to 12/07/2013 

 24/07/2013 

  Bureau Veritas  

Bureau Veritas 

Approved     

Approved Wal‐Mart 2nd follow up on Electrical & Fire safety assessment Lidl‐Germany Fire Risk Assessment 

 08/05/2014  11/05/2014 

  Bureau Veritas  

Emdadul Haq (Swiss contact) 

 Approved  Approved 

Page 12: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

12

 

Name of Buyer  Last Audit Date 

Audit Status 

Audited by  Standard 

FCCA FCCA FCCA FCCA FCCA                                  

08.08.201116.09.2012 18.10.2014 25.10.2015 01.12.2016 

85.29%80.11% 74.5% 81% 

82.50 

SGSITS BV BV BV 

ApprovedApproved Approved Approved Approved 

Debenhams  17.09.2012  Pass  SGS  Approved RQS RQS RQS 

30.08.201201.11.201427.10.2015 

Pass 89% 92% 

H & M H & M H & M 

Approved Approved 

Woolworths Woolworths Woolworth  Woolworth (Follow Up)  Woolworth (Follow Up)  

30.05.201017.12.2013 13.12.2015 26.01.2015 26.01.2016 

PassPass CAP CAP Green 

SGSSGS SGS SGS SGS 

ApprovedApproved 

CAP Approved Approved 

The Walt‐Disney  22/09/2011 Pass  BV  Approved 

Carre Four  08/01/201218/03/201416.03.2016 

Pass “B” 

Initial (Pass) 

ITS TUV SUD TUV SUD 

Approved Approved Approved 

New Look  18/03/201220/05/2012

Pass  Self  Approved 

Takko Fashion  28/05/2012 Pass  Self  Approved Perry Ellis  

25/03/201306/01/201410/04/201406/06/2016

Pass Pass Pass Pass 

Self Self Self Self 

Approved Approved Approved Approved 

Benetton Asia  28/05/201115/06/2011

Pass  Self  Approved 

Group Auchan  07/07/2014 Pass (100 %) Self Approved

ISO:9001:2008 ISO: 9001:2008. 1st Follow  2nd Follow Up 

16/04/201426.08.201503.5.2016 

Pass Pass Pass 

Cert: Inter: Bangladesh 

 

Approved Approved Approved 

MANGO  21/09/2015        Pass  Self Approved

OCS Audit. Organic OCS Audit. Organic 

05.01.2016 02.02.2017      

        Pass        Pass 

C.U             C.U               

Approved  Approved           

H & M. 1st QMS Audit          30.04.2015              37 %  Self             Approved

H & M. 2nd QMS Audit         31.01.2016        62 %                Self          Approved

  

Page 13: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

13

 

 

 

 

 

Total Land Area  68,072 sft 

Building Area  Main Building ‐1 Building‐2 Admin Building‐3 Security room‐4 Sub‐ station‐5 Parking Area Total Building Area  

 174000 sft    60000 sft     4080 sft       195 sft       225 sft       480 sft 2,38,980 sft 

Total Production Area(Cutt +Sew+Fins) 1,23100 Sft

Total no. of Buildings/ Shade  05 

Number of Floors  (Blg‐1)‐06,(Blg‐2)04 &(Blg‐3)‐ 03 

Storage Area  64,817  Sft 

Total Finished goods Area  15000 Sft

Section Wise Area. TotalSewingArea 74300 Sft

TotalCuttingArea 23,800Sft

TotalFinishingArea 25,000 Sft

TotalSampleArea 2000 SqFeet

TotalPackingArea 7,500Sft

TotalAdminBuilding 4080Sft

TotalOfficeArea 10000 Sft

WareHouseArea(Centralstore‐1&2) 40000 Sft

TotalSubStoreArea 4,817Sft

FinishedGoodsArea 20000Sft

DiningArea 8,200SftBoilerRoom 383SftJuteRoomArea 1,500SftGeneratorRoomArea 700Sft

TotalStockLotArea 12,500Sft

TotalStairArea 2,500Sft

MedicalRoom 400Sft

DayCareRoom 400Sft

Sub‐station 225sft

SecurityRoom 195sft

Parkingarea 480sft

Total 2,38,980SquareFeet

Page 14: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

14

 

FLOOR  ALLOCATION Remarks 

  Ground Floor 

Reception Lobby / Fire control room, Doctor’s Room, Child Care Room, Central Store ‐01 Training Room, Boiler Room 

1st Floor  GarmentsUnit‐4(Sewing,Cutting&Finishing), Sample  Section, Sub‐Store, Office room, Maintenance room 

2nd Floor  

Worker Dinning AreaCutting Area , Lab Room Prayer Room(Male/Female)  

3rd Floor  Garments Unit ‐02 Sewing & Finishing, Sub‐Store, Office room, Maintenance room 

4th Floor  Garments Unit‐01 Sewing , Finishing, Sub‐Store, Office room & Maintenance room 

5th Floor  Garments Unit‐03 Sewing, Finishing, Sub‐Store, Office room & Maintenance room. 

FLOOR  ALLOCATION Remarks 

Ground Floor  Fabrics Store, Central store‐02 Wastage Go down, Compressor 

1st Floor  Office Room Finished Carton Area (1, 2, 3 &4), Empty Carton & Idle Machine Area. 

Building‐02 

Building‐01

Page 15: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

15

Building -3

 

Building -04

 

Building -05  

 

 

 

 

 

 

 

 

2nd Floor  

Stock Lot Area & Fabrics & Accessories store. 

   

FLOOR  ALLOCATION Remarks 

  Ground Floor 

Fire Pump room, Generator room, Maintenance Store, Switch gear room 

1st Floor  Cooking place for staff

2nd Floor  

Ansar Rest Area 

3rd Floor  Staff Dining 

FLOOR  ALLOCATION Remarks 

Ground Floor  Sub‐ station Room  

FLOOR  ALLOCATION Remarks 

Ground Floor  Security Room  

Page 16: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

16

 

 

 

Category / Section  Male Female Total 

Sewing Section  Operator  226 714 940 

Asst. Operator 86 256 342 

Iron man      00  06  06 

Quality  54  76                       130 

       

           Sub Total    366  1052  1418 Finishing Section  Finishing Asst.  54  64  118 

Quality  63  65  128 

Finishing Iron man  47  0  47 

Folding & Poly man  34  38  72 

Packing man  26  0  26 

Sub Total    224 167 391 Cutting Section  Cutter man  18  0  18 

Asst. Cutter man 74 44 118 

Quality  20 10 30 

Sub Total    112 54 166 Sample  Sample Man  2  0  2 

Auto CAD  CAD  4 0 4 

Maintenance  Helper  12  0  12 

Office Staff (All admin staff &  APM above) 

Office staff  66  2  68 

Cook & Gardener  1  2  3 

Store Loader  46  0  46 

Cleaner   7 40 47 

Sub Total    132 44 176 Production Accounts  1 0 1 

Floor Staff (Production)  137 6 143 

Central Store  staff  33  0  33 

Stock lot Staff & worker  36  1  37 

              Sub Total  207 07 214 Total Manpower (Staff & Worker)  1084  1348  2432 

Manpower Ratio  45% 55% 100% 

Total Staff / Total Worker   280  2152  2432 

Male Worker / Female Worker  813  1334  2137 

Male Staff/ Female Staff  277  8   285 

Security Guard & Ansar  58  4  62 

Toilet  46  54  100 

Page 17: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

17

 

 

 

 

 

WorkingDayPerWeek 06Days

NormalWorkingHourperDay 08hours

OvertimeHour 02hours

No.ofOperatingShift 01Shift(GeneralShift)

WeeklyHoliday 01Day(Friday)

Name of Fire Equipment  QuantityWaterHydrantSystem Centralized

ABC ( 5 kg‐219 , 25 kg trolley –23, 6 kg ‐115,Auto (Sprinkler)6 kg‐301 

638Pcs

Co2 5kg‐143,30kg trolley‐15  158PcsFoam‐10kg‐03, 25kg‐2  03PcsTotal    820PcsFire Hook  29PcsBitter  20PcsLock Cutter  11PcsGum Boot/Safety Boot   24Pairs

Hand Gloves  81PairsManila Rope  15PcsBlanket  40NosSafety Helmet  48NosFire Musk  90PcsRespiratory mask  90PcsWater Drum  85PcsGong Bell  12PcsStretcher  24Pcs

Hydrant Fire Hose Pipe   29Pcs

Hose reel   26Pcs

Pillar Hydrant   12Pcs

Fire Bucket  128PcsFire alarm Switch (Auto‐44, Manual‐44) 88PcsFire Bell  44PcsFire Alarm Siren (Visual – 04 pcs , Ordinary‐ 22 pcs) 

26Pcs

Emergency Light   149PcsSuper Exit Light   116PcsSmoke Detector (Centralized – 311 Pcs, )    Heat Detector ‐06pcs( Ordinary‐ 798 pcs ) 

1115Pcs

Breathing Apparatus  04Pcs

 

Page 18: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

18

 

 

 

Complete Fire Protective Suit  09PcsFirst Aid Box 24 PcsFire man’s axe  02pcsWater Sprinkler    875 Pcs

Main Gate  Factory Building 

   

Cutting Section  Sewing Section 

 

Finishing Section Pressing Section 

Page 19: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

19

 

 

 

 

 

 

 

 

 

   

Page 20: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Day Care   Doctor’s Room 

 

 

Spot Removing Room  Ware House  

 

 

Auto Fire Alarm Control Board  ERP (Production Efficiency software) 

   

Page 21: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

21

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fire Hydrant Room Fire Pillar Hydrant 

 

Fire Resistant Door Auto Cutter Machine 

   

Sample Room  Plotter Machine (IOLINE) 

 

 

Page 22: Kabirpur, Savar, Dhaka. House # 9/Kha, Confidence Centre ...palmalgarments.com/wp-content/uploads/2017/04/ACML2-Factory... · E‐mail: azam@ ... Total Garments Production Line 20Line

 

22

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Needle Detector Machine Fabric Inspection Machine 

 

Fabric Inspection Machine