(as stated in the presentation)A feedback report for MWSS. This is an independent feedback report of the field investigation and assessment conducted by the composite Team created pursuant to DENR Special Order No. 466-2004.AUTHORITY TO CONDUCT INVESTIGATION & ASSESSMENT:-DENR Special Order No. 466-2004 dated July 5, 2004 signed by Sec. Guzon.-MWSS Office Order No. 94-2004 dated July 15, 2004 signed by MWSS Adm.Orlando C. Hondrade.COVERAGE OF INVESTIGATION AND ASSESSMENT:-Evaluation of the Usufruct areas which were granted by DENR to its employees-Determine the extent of the damaged caused by Kaingin-Survey and census of residents-Other matters related thereto.
Citation preview
KAINGIN-DESTROYED IPO FOREST AND WATERSHED
RESERVATION
A feedback report for MWSS.
This is an independent feedback report of the field investigation and assessment conducted by the
composite Team created pursuant to DENR Special Order No. 466-2004
AUTHORITY TO CONDUCT INVESTIGATION & ASSESSMENT
• DENR Special Order No. 466-2004 dated July 5, 2004 signed by Sec. Guzon
• MWSS Office Order No. 94-2004 dated July 15, 2004 signed by MWSS Adm.Orlando C. Hondrade
COVERAGE OF INVESTIGATION AND
ASSESSMENT • Evaluation of the Usufruct areas which were granted by DENR to its employees
•Determine the extent of the damaged caused by Kaingin
•Survey and census of residents•Other matters related thereto.
BRIEF BACKGROUND ON THE MANAGEMENT OF IPO WATERSHED
Proclamation No. 391 dated April 30, 1968 by then Pres. Ferdinand E.Marcos.
It provides Joint Administration by the Director of Forestry and the NWSA General Manager (now MWSS).
MWSS have been actively administering Ipo Watershed Reservation in the security, protection, and preservation through its then Water Sources and Treatment Dept. (WSTD).
The Advent of RA 8041(Water Crisis Act
of 1995) as implemented by E.O. 286. • Privatized MWSS• The obligations of MWSS towards the Ipo
watershed in the management, protection, sustainable development and rehabilitation were not clearly defined in the Concession Agreement (CA) and/or assign the same to the concessionaires.
• Thus, DENR took the cudgels of the management, protection and rehabilitation of the Ipo forest and watershed reservation since 1997.
“USUFRUCT Project”• Approved sometime in 2000 by then DENR
Secretary Cerrilles
• It was intended to encourage DENR employees to plant fruit-bearing trees to the open (pocket) spaces of the Ipo watershed reservation.
DENR’s MGT & PROJECTS IN IPO WATERSHED RESERVATION
Feedback on the Impact of DENR’s Usufruct and Reforestation Projects
• It was found out that the Usufruct project/program was the major cause of the massive kaingin activities in Ipo watershed reservation.
• It triggered the invasion of informal settler-cultivators to the forest.
The kaingin areas has been transformed into some kind of agricultural farm lots. Tillers Devoted it to fruit-bearing trees plantation i.e., upland rice farming, cornfields, root crops & vegetable gardening (cash crops).
Areas that were hit by the massive Kaingin within the Ipo forest and watershed
reservation. • Anahaw area – 130 has. more or less;• Sapang Catmon – 80 has. More or less;• Mount Maranata – 150 has. More or less;• Mount Balagbag - 400 has. More or less;• Sapang Baliwag - 100 has. More or less;• Sapang Anginan - 120 has. More or less;• Sapang Munti - 150 has. More or less;• Mataas na buhangin – 80 has. More or less; and • many more
OVERALL ESTIMATED OPEN AREA INCLUDING THOSE DESTROYED BY
KAINGIN IN IPO WATERSHED RESERVATION.
• Estimated Original Open – 15%• Estimated Destroyed by kaingin - 55%
• Total Open Space 60-70% of the 6,600 hectares of IPO reservation.
• A very alarming extent of damaged from 2002-2005.
Census of Residents
• Dumagat – 39 Families• New Settlers- 103 Families• Cultivators(ambulant) or the kaingeros -
105 individuals
Inventory of Boats operating at Ipo watershed as means of
transport and fishing
Motorized – 25 Units
Not Motorized – 26 units
The DENR’s RESOURCES FOR IPO
Watershed Protection
Only 4 warm bodies are assigned to conduct needed foot patrol from DENR to forest of Ipo.
• DENR Forest guards do not conduct regular patrol to the forest of the watershed.
•Patrol lacks necessary logistical needs, firearms, equipment & communication system.
• Inadequate augmentation from MWSS, MWSI and MWCI
OTHER PROBLEMS• Existence of logging syndicate. Allegedly with
participation of of some workers assigned at the Ipo Dam. They are timber and charcoal traders.
• Increasing number of informal settlers-cultivator residing the forest and the kaingin areas.
• Presence of gold/treasure hunting within the watershed.
• Distribution or award of the lands of Ipo watershed by NCIP, DENR and other govt agencies.
IPO WATERSHED RESERVATION CAN NOT WAIT ANOTHER YEAR OF
FOREST DESTRUCTION.
CURRENT ISSUES AND CHALLENGES
• Sustainability: Protection, Rehabilitation and Preservation
• Transfer the jurisdiction of Ipo forest and watershed reservation to the stewardship of MWSS, like the Angat watershed to Napocor, the Forest of Subic to SBMA
• Review CADT. Land allocated to Dumagat and now occupied by retired Military personnel at Mt. Balagbag in Ipo watershed
ACTION PLAN
PHASE I* Creation of Ipo Watershed Task Force (MWSS, MWCI & MWSI)* Multi Stakeholder Partnership
* Information Campaign and consultation with settler-cultivators of Ipo watershed
PHASE II* Demolition, Evacuation and/or Resetlement
PHASE III* Take-over on the Management of Ipo
forest and watershed reservation.
PHASE IV- REFORESTATION
WATERSHED PROTECTION NEEDS
• COMMUNICATION SYSTEM (2-WAY RADIOS)
• FIREARMS (M16 at least 6 units)• Telescopes• GPS Units
PERSONNEL AND LOGISTICAL NEEDS
30 Security Personnel (Ipo Patrol)
The Ipo Watershed Territorial Area
Veterans at mount Balagbag
Ipo Dam
Kaingin areas
Usufruct areas
A 40 has upland rice,root crops and vegetable farming at Sapang Baliwag
Remnants of huge dipterocarph trees at Sapang Baliwag. About 9 has. wide
Taken on aerial inspection. Mount Maranat Area April 26, 2004. This is for ground inspection by the Team.
A 9 hectare cornfield at Mataas na Buhangin
n
Fresh Cut Tree at Sapang Munti. The members of the team over heard on 21 July
2004 at 12:00PM chain saw machine cutting this tree. This is red narra.
Fresh Cut Tree in the midst of the forest at Sapang Paco
Invasion of settlers to Mount Balagbag (Known as Veterans)There are 200 to 250
families now residing
A 15 has. Upland Rice and Vegetables Farm at Sapang baliwag
A 15 hectare kaingin at Mataas na Buhangin. Destroyed also were the
newly planted seedlings
17-hectare wide kaingin with dipterocarph species trees razed to the ground.
A 30 has kaingin now a cornfield and upland rice farm.
A newly cut tree. Dipterocarph species along ipo river. That’s the crown area of
the tree having 2-ft diameter.
A 30 has upland rice farm. Debris of kaingin trees at sapang munti
The top of mount maranat which is covered by cogon and bamboo shrubs.
1 meter diameter 38 ft long timber at sapang anginan. A 10 hectare kaingin
Remnants of kaingin trees
LET US SAVE WATERSHED RESERVATIONS
THIS IS WHERE OUR WATER IS COMING FROM
Thank You