  • WATER AND POWER DEVELOPMENT AUTHORITYPRESS BRIEFINGDecember 16, 2005MEGA DAM PROJECTS

  • SEQUENCE OF PRESENTATIONPAKISTANS NEED FOR LARGE DAMSWATER AVAILABILITY VS POPULATION GROWTHNUMBER OF DAMS UNDER CONSTRUCTION IN WORLDPROJECT LAYOUTDESIGN EARTHQUAKECOST ESTIMATESAPPREHENSIONS OF NWFP & SINDHIMPLEMENTATIONS SCHEDULEFUNDING REQUIREMENTS

  • PAKISTANS NEED FOR LARGE DAMSWATER SCARCE COUNTRY AS PER GLOBAL CRITERIARAPIDLY INCREASING POPULATIONDEPLETING ON-LINE STORAGESLARGE ESCAPAGES OF UNCONTROLLED FLOOD IN SEAEFFECTIVE RIVER REGULATION AND INTEGRATION OF EXISTING IRRIGATION SYSTEM

  • WATER APPORTIONMENT ACCORD 1991PARA-6THE NEED FOR STORAGES, WHEREEVER FEASIBLE ON THE INDUS AND OTHER RIVERS WAS ADMITTED AND RECOGNIZED BY THE PARTICIPANTS FOR PLANNED FUTURE AGRICULTURAL DEVELOPMENT

  • WATER AVAILABILITY (MAF)

    POPULATION (Million)1126 m3 2005155.27 Million (2005)

    Chart1

    526034

    388846

    275165

    212984

    1555115

    1282139.5

    1066167.72

    915195.5

    858208.4

    PER CAPITA AVAILIBILITY

    POPULATION GROWTH

    Per Capita availbility

    Papulation (million)

    YEAR

    PER CAPITA AVAILABILITY (M) 3

    WATER AVAILABILITY Vs POPULATION GROWTH

    Sheet4

    Sheet1

    Papulation (million)quantity of waterratio

    195133.8800.4225

    196142.9730.5876712329Per Capita availbilityPapulation (million)Canal Diversion (MAF)

    197165.3820.7963414634195152603467

    198184.3900.9366666667196138884684.6

    1992113.61061.07169811321971275165106

    2002145.91041.40288461541981212984106

    20121781001.7819911555115104.6

    2020216.8992.189898989920021282139.5104

    202522598.62.281947261720051162153.91100

    20101066167.7299.5

    2015984181.7399.2

    2020915195.599

    2025858208.498.6

    Papulation (million)Quantity of Water

    1951341455260

    1961461453888

    1971651452751

    1981841452129

    19911151451555

    2000139.51451282

    2005153.911451162

    2010167.721451066

    2015181.73145984

    2020195.5145915

    2025208.4145858

    Sheet1

    000

    000

    000

    000

    000

    000

    000

    000

    &A

    Page &P

    Papulation (million)

    quantity of water

    ratio

    year

    poplation

    per capita water avalibility

    ksdhrksdkjgjghkfjl

    Sheet2

    000

    000

    000

    000

    000

    000

    000

    000

    000

    &A

    Page &P

    Papulation (million)

    Quantity of Water

    Year

    population

    water

    rtyu

    Sheet3

    000

    000

    000

    000

    000

    000

    000

    000

    000

    &A

    Page &P

    PER CAPITA AVAILIBILITY

    WATER SHORT COUNTRY

    AFTER TARBELA

    INDEPENDENCE

    AFTER MANGLA

    POPULATION GROWTH

    Per Capita availbility

    Papulation (million)

    Canal Diversion (MAF)

    YEAR

    PER CAPITA AVAILABILITY (M)3

    CANAL DIVERSION (MAF)

    POPULATION (MILLIONS)

    CANAL WATER DIVERSION Vs POPULATION GROWTH

    5260 m3 (1951)

  • AVERAGE ANNUAL FLOW AND STORAGE CAPACITY OF DAMS OF SOME MAJOR RIVER BASINS

    Sr. #River BasinAverage Annual flow (MAF)No. of DamsStorage Capacity (MAF)% age Storage1Colorado12359.624972Nile3811324753Sutlej BiasIndia (Total)3275054,63611.3224535334Yellow River345768.95205Columbia179334196Indus & others Rivers145318.37137Yangtze87013248World20,000-8,00040

  • ESCAPAGE BELOW KOTRIHYDROLOGICAL YEAR FROM APRIL TO MARCHSource: WRMP WAPDA based on data supplied by Govt. of SindhUpto 03.10.05

    Chart1

    69.0835.2

    30.3935.2

    80.5935.2

    29.8135.2

    20.135.2

    33.7935.2

    9.6835.2

    45.9135.2

    29.5535.2

    10.9835.2

    26.935.2

    17.5335.2

    52.8635.2

    17.2235.2

    42.3435.2

    53.2935.2

    81.4935.2

    29.1135.2

    91.8335.2

    62.7635.2

    45.435.2

    20.7935.2

    35.1535.2

    8.8335.2

    0.7735.2

    1.9335.2

    2.3735.2

    20.1835.2

    0.292004-05

    24.435.2

    AVG. (35.2)

    Source: WRMD WAPDA

    YEARS

    ANNUAL DISCHARGE (MAF)

    Sheet1

    1975-7635.20

    1976-7769.0835.20

    1977-7830.3935.20

    1978-7980.5935.20

    1979-8029.8135.20

    1980-8120.1035.20

    1981-8233.7935.20

    1982-839.6835.20

    1983-8445.9135.20

    1984-8529.5535.20

    1985-8610.9835.20

    1986-8726.9035.20

    1987-8817.5335.20

    1988-8952.8635.20

    1989-9017.2235.20

    1990-9142.3435.20

    1991-9253.2935.20

    1992-9381.4935.20

    1993-9429.1135.20

    1994-9591.8335.20

    1995-9662.7635.20

    1996-9745.4035.20

    1997-9820.7935.20

    1998-9935.1535.20

    1999-20008.8335.20

    2000-010.7735.20

    2001-021.9335.20

    2002-032.3735.20

    2003-0420.1835.20

    2004-050.29

    2005-0624.4035.20

    33.18

    Sheet2

    Sheet3

  • From Western Rivers u/s RIM Stations146 MAFUses above RIM Stations (NWFP) 5 MAFNet available at Rim Stations141 MAFDistribution by IRSA (1991-WAA)117.35 MAFCanal Diversion106 MAFNot available for distribution (as per Accord) (4-5)11.35 MAFWater flowing downstream Kotri (3-5) 35 MAFWATER AVAILABILITY IN PAKISTAN

  • RESERVOIR SEDIMENTATION (MAF)

    RESERVOIRGROSS STORAGE CAPACITYGROSS STORAGE LOSSORIGINALYEAR 2004YEAR 2004YEAR 2012YEAR 2025TARBELA11.62 (1974)8.36 (72%)3.26 (28%)4.17 (36%)5.51 (47%)MANGLA5.88 (1967)4.64 (78%)1.24 (22%)1.72 (29%)1.97 (34%)CHASHMA0.87 (1971)0.48 (55%)0.39 (45%)0.48 (55%)0.50 (57%)TOTAL18.3713.48 (73%)4.89 (27%)6.37 (35%)7.98 (43%)

  • NUMBER OF DAMS UNDER CONSTRUCTIONIN SOME COUNTRIESSource: ICOLD register of Dams

  • PROPOSED DAMS ON INDUSAKHORI DAMSKARDU DAM

  • Barotha Power HouseAKHORA KHATTAK

  • KALABAGH DAM PROJECT LAYOUT

  • KALABAGH DAM PROJECT SALIENT FEATURESRESERVOIR GROSS STORAGE7.9 MAF LIVE STORAGE6.1 MAF RETENTION LEVEL915 FT

    MAIN DAM CREST ELEVATION940 FT. MAXIMUM HEIGHT260 FT. LENGTH11,000 FT.

    SPILLWAYS OVERFLOW SPILLWAY1,070,000 Cusecs ORIFICE 980,000 Cusecs

    POWERSTATION NUMBER OF UNITS8/12 Nos. Initial/Ultimate

    INSTALLED CAPACITY2,400/3,600 MW(12,400 GWh per year)ESTIMATED COST (SEPTEMBER 2005)US $ 6.1 BillionNO LOW LEVEL OUTLETS INCLUDED IN PRESENT DESIGN

  • KALABAGH DAM PROJECT SEISMIC DESIGNTHE EVALUATION OF SEISMIC HAZARD AND DETERMINATION OF MAXIMUM CREDIBLE EARTHQUAKE (MCE) AND OPERATING BASIS EARTHQUAKE (OBE) WAS MADE WITH THE ADVICE OF PROF. ALLEN, PROF. AMBRESSEYS AND MR. ABUL FARAH. THE PARAMETER OF MCE M = 7 AND a = 0.4g ARE BASED ON THE ESTIMATED MAXIMUM EARTHQUAKE OCCURRING ON KALABAGH FAULT WHICH IS 12 KM FROM THE DAM SITE AT ITS NEAREST POINT. OTHER MAPPED FAULTS ARE SUFFICIENTLY FAR AWAY.

  • KALABAGH DAM PROJECT ENVIRONMENTAL IMPACT* December 2004

    PROVINCEPOPULATION * TO BE RESETTLEDLAND AFFECTED (ACRES)BARANIIRRIGATEDTOTALPUNJAB78,00021,6002,90024,500N.W.F.P42,0002,9001003,000TOTAL120,00024,5003,00027,500

  • KALABAGH DAM PROJECTCost Estimates (US$ Million)

    Sr. No.DescriptionSeptember 20051.Resettlement & Relocation6752.Preparatory Work, Colonies, Contractor Camp4003.Diversion Works, Dam Embankment and Earthwork6304.Power Intakes, Conduits & Power Station9205.Spillway4506.Transmission Lines and E&M Works5507.Physical Contingencies415Sub Total40408.Price Escalation7939.IDC114610.Taxes & Duties121Total Investment Cost6100

  • APPREHENSIONS OF NWFP

  • KALABAGH DAM PROJECT APPREHENSIONS OF NWFP

  • KALABAGH RESERVOIR AREA WITH PROPOSED MODEL VILLAGES

  • KALABAGH DAM PROJECT 3 D VIEW OF NOWSHERA VALLEY

  • PIR SABAK

  • KALABAGH DAM PROJECT L-SECTION OF KABUL RIVER

  • DRAINAGE LEVELS IN KABUL VALLEY WITH KALABAGHSWABICHARSADDAPABBINOWSHERAMARDANRESERVOIR RETENATION EL. 915DISTANCE U/S DAM SITE IN MILESLEVEL IN FEET9559609409701000

  • KALABAGH DAM PROJECTKABUL RIVER SECTION KM-5(9270 FT DOWNSTREAM OF PIR SABAK)

  • APPREHENSIONS OF SINDH

  • KALABAGH DAM PROJECT APPREHENSIONS OF SINDH

  • KALABAGH DAM PROJECT APPREHENSIONS OF SINDH

  • RIVERAIN AREA DEVELOPMENT (SINDH) THROUGH TUBEWELLS

  • THE INDUS DELTAMANGROVES AND LANDFORMS

  • KALABAGH DAM PROJECT APPREHENSIONS OF SINDH

  • KALABAGH DAM PROJECT SEASON-WISE AND ANNUAL CANAL HEAD WITHDRAWALS OF SINDH (1962-63 TO 1999-2000)

  • KALABAGH DAM PROJECTHOW SOON CONSTRUCTION CAN START ?All designs & Tender Documents ready Revised Environmental/Resettlement Studies Underway.Preliminary Works i.e. Access Roads, Colonies etc. can also start.Construction can start in 2006.

  • KALABAGH DAM PROJECTOVERALL IMPLEMENTATION SCHEDULE

    Sheet1

    KALABAGH DAM PROJECT

    OVERALL IMPLEMENTATION SCHEDULE

    Sr.ACTIVITY200520062007200820092010201120122013

    No.123456789

    1Government Approval

    2Upgradation of Planning Report, Designs & Tender Documents

    3Environmental Impact Assessment (EIA)

    4Prequalification of Contractors, Bidding, Evaluation and Award of Contract

    5Pre-Construction Activities (Preliminary Works like Access, Camps, Land Acquisition etc.)

    6Construction

    7Resettlement

    First Filling

  • SHARING OF FUTURE STORAGE PROJECTS(Water Apportionment Accord 1991)PUNJAB 37%

    SIND37%

    NWFP14%

    BALUCHISTAN12%

  • BHASHA DAM PROJECT

  • BASHA DIAMER DAM PROJECTSATTELITE IMAGERY OF RESERVOIRBASHA DIAMER DAM

  • BASHA DIAMER DAM PROJECT STUDIES CARRIED OUTDrilling in River and Overland on Selected Axis.Finalization & Improvement on Basic Studies: Hydrological Structural Hydraulics Construction Material Geotechnical/Seismological Electrical & MechanicalPreparation of Feasibility Level Designs.Environmental Impact Assessment.Resettlement Issues.Preparation of Cost Estimate.Economic & Financial Evaluation.Finalization of Feasibility Report (August 2004).

  • BASHA DIAMER DAM PROJECTAPPROVAL BY PANNEL OF EXPERTSWAPDA Appointed an international Panel of Experts (2004).POE made in depth review of the Work Done by the Consultants and made detailed site visit.POE Endorsed the Feasibility.

  • BASHA DIAMER DAM PROJECTLAYOUT PLAN/CONFIGURATION

  • BASHA DIAMER DAM PROJECT SALIENT FEATURES

  • BASHA DIAMER DAMSEISMIC HAZARD STUDIESSEISMIC DESIGN PARAMETERSMAXIMUM DESIGN EARTHQUAKE (MDE) TAKEN EQUAL TO THE MAXIMUM CREDIBLE EARTHQUAKE (MCE) 0.40 gOPERATING BASIS EARTHQUAKE (OBE)0.21 g

  • BASHA DIAMER DAM PROJECTPOWER TRANSMISSIONFAR AWAY FROM LOAD CENTER.FIRST 325 KM THROUGH RUGGED MOUNTAINS.MORE COSTLIER AND DIFFICULT TO CONSTRUCT.TOTAL COST U.S. $ 986 MILLION WHICH IS ABOUT 15 % OF TOTAL FINANCIAL COST.

  • BASHA DIAMER DAM PROJECT

    ALTERNATE TRANSMISSION ROUTES ON TOPO MAP

  • BASHA DIAMER DAM PROJECT ENVIRONMENT AND RESETTLEMENT

  • BHASHA DIAMER DAM PROJECT RELOCATION/REHEBLITATION OF KKHHasanabdalLength of Section40 km281 km94 kmBASHA DIAMER DAM

  • BASHA DIAMER DAM PROJECT UPGRADATION AND RELOCATIONOF KKH Upgradation Reach (Havelian to Dam Site)Length = 323 Km Cost=9.2 Billion Rupees Relocation Reach (Sazin to Raikot Bridge)Length140 Km Cost14.30 Billion Rupees

  • BASHA DIAMER DAM PROJECTCURRENT STATUSConsultancy for Detailed Design & Preparation of11.07.2005 Tender Documents Awarded Consultants Mobilized 05.09.2005Completion Period 30 monthsDate of Completion04-03-2008

  • BHASHA DIAMER DAM PROJECT OVERALL IMPLEMENTATION SCHEDULE

    Sr. No.CALENDER YEAR (JAN-DEC) 2002200320042005200620072008200920102011201220132014201520161Feasibility Study Stage-I (Completed)2Preparation of Tender Documents and Detail Engineering3Additional Investigation Studies and Model Testing4Pre-construction ActivitiesLand Acquisition, Up-gradation of KKH5Tendering Process Up to Award6Mobilization of Contractor7Construction Activities8Rehabilitation/ Resettlement including Relocation of KKH

  • SKARDU / KATZARAH DAM PROJECT

  • SKARDU DAMSkarduShigarAirportSKARDU DAM SITE SKARDU/KATZARAH DAM PROJECT

  • CROSS SECTION THROUGH AIRPORT

  • STATUS & TECHNICAL ISSUES OF FUTURE DAMSPF Pre FeasibilityF FeasibilityD Design T Tender Documents