Kansas City District
June 2009
Military Construction Military Construction Briefing and Site TourBriefing and Site Tour
CPT Jeff Shultz
Fort Leonard Wood Resident Office,Kansas City District, USACE
Kansas City District
Overview Briefing AgendaOverview Briefing Agenda
• Construction Trends
• FLW Program Summary, FY08-12
• Current Projects
• Questions
Kansas City District
“Things are not Business as Usual in the Corps of Engineers. We are busier now than in the past 50 years.”
- Colonel Roger Wilson Kansas City District Commander
Kansas City District
MILCON Trend Assessment
Kansas City District
Kansas City District
What is Important at FLW?
• Supporting the installation’s Master Plan
• IET Soldier Bed Space (TRAPS Relocatables, TBUP, and Starship Barracks)
• Facilities for the 4th Maneuver Enhancement Brigade
• Upgrading Ranges to support TRADOC and FORSCOM Units
• Upgrading Post Infrastructure to support increased facility demands (e.g. sewer, roads, phones)
Kansas City District
Long Term Master Long Term Master Plan for FLWPlan for FLW
N• Segregate FLW into BT, AIT, Permanent Party, and FORSCOM Zones
• Support Increased Annual Trainee Load
• Construct Facilities for 4th MEB
Kansas City District
BT / OSUT / AIT BT / OSUT / AIT Long Term Transition PlansLong Term Transition Plans
TRAPS Relocatables Rolling Pin Barracks Renovation
• Complete building overhaul, including mechanical systems and interiors.
Starship Barracks Complex
• Provide immediate bed space for BT and AIT Soldiers to meet Summer Surge Requirements
• Over the next 10-20 years, replace Rolling Pin barracks and Specker AIT barracks with Starship Complexes
Kansas City District
Starship Barracks ConceptStarship Barracks Concept
EN
MP
CM
Kansas City District
Project Name:Completion
Date:Cost
($Million):
TBUP 07 Apr 09 $39.2
TBUP 08 Jan 10 $19.9
Permanent Party Barracks III Mar 10 $26.0
BCT III Feb 10 $67.7
Double Dining Facility Feb 10 $19.1
Prime Power School Jul 10 $25.8
4th MEB Mar 11 $51.3
Child Development Center Sep 09 $6.6
Range 7 & 8 Nov 10 $8.4
Urban Assault Course Mar 10 $1.8
$265.8M
Current Projects (FY08)Current Projects (FY08)
Kansas City District
Permanent Party Barracks
Kansas City District
TBUP 07 & 08
Kansas City District
Basic Combat Training Barracks Complex III
• 4 BCOF Buildings
• HQ Building
• PT Track
• Site prep for Double Dining Facility
Kansas City District
Double Dining Facility
• Two-story Building
• Services 2400 Soldiers (2 Starship Complexes)
• Small Veteran-owned Business
Kansas City District
Child Development Center
• Replaces existing Quonset Huts
• Designed to service two hundred 6-10 year old kids
• Includes:
– Large multipurpose room
– Activity rooms
– Kitchen
– Game areas
– Playground
Kansas City District
Range 7 & 8
• 2 independent Modified Record Fire Ranges
• Primarily for BCT use
• Constructed over the existing ranges
• Includes all new facilities
Kansas City District
4th MEB
• New Facilities for a 2000-Soldier Maneuver Enhancement Brigade
• Includes:
-2 Battalion HQ’s
-Company Ops Facility
-Maintenance Facility
• Brigade HQ was not included due to lack of funding
Kansas City District
Prime Power School
• Future Home of the Prime Power School
• Includes:
- Admin Building
- Classrooms
- Generator Hardstands & Training Area
Kansas City District
Project Name:AwardDate:
Cost ($Million):
Primary Care Clinic May 09 $XX
BCT Barracks Complex 6 Jun 09 $XX
Wastewater Treatment Plant Addition Jul 09 $X
Chapel Aug 09 $XX
Training Support Center Aug 09 $XX
Range 21 - Combat Pistol Range Sep 09 $X
Range 24 – MPMG Range TBD $X
Sapper Leader Course Design TBD $X
TBUP 09 TBD $XX
$180M
Upcoming Projects (FY09)Upcoming Projects (FY09)
Kansas City District
Project Name:Cost
($Million):
Motor Trans (88M) Course $XX
Tech Escort Facility at CBRN $X
Dental Clinic Addition $X
Digital Training Facility $XX
Warrior In Transition $XX
AIT Barracks, Phase 1 $XX
$175M
Upcoming Projects (FY10)Upcoming Projects (FY10)
Kansas City District
Project Name:Cost
($Million):
Permanent Party Barracks, Phase 4 $XX
Troop Dispensary / Heath Clinic $X
Dial Central Office $XX
AIT Barracks, Phase 2 $XX
$80M
Upcoming Projects (FY11)Upcoming Projects (FY11)
Kansas City District
Project Name:Cost
($Million):
Trainee Barracks Complex 2 $XX
Trainee Barracks Complex 3 $XX
5th EN BN TEMF $XX
94th EN BN TEMF $X
13th MP TEMF $X
512th MP TEMF $X
$200M
Upcoming Projects (FY12)Upcoming Projects (FY12)
Kansas City District
QuestionsQuestions