Collapse July 17, 1981, between 1500 and 2000 people inundated the atrium floor and the suspended walkways to see a local radio station’s dance competition A loud crack echoed throughout the building and the 2nd and 4th floor walkways crashed to the ground Killed 114 people and injured over 200 others Worst structural failure in the history of the United State

Citation preview

Page 1: Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane

Kansas City Hyatt Regency Walkway Collapse

                               

                                               

                              

By: Ian Thompson

Stephen Conlon

David Martin

Laura Devane

Page 2: Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane

Design and Construction

Opened to the public in 1980 after four years of design and construction Consisted of a 40-story tower, an atrium, a function block, and housing all

of the hotel’s services

Three walkways suspended from the atrium’s ceiling by six 32-mm-diameter tension rods, each spanned the 37-m distance between the tower and the function block

The 2nd floor walkway suspended from the beams of the 4th floor walkway

While the 3rd and 4th floor walkways hung from the ceiling

Page 3: Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane

Collapse

• July 17, 1981, between 1500 and 2000 people inundated the atrium floor and the suspended walkways to see a local radio station’s dance competition

• A loud crack echoed throughout the building and the 2nd and 4th floor walkways crashed to the ground

• Killed 114 people and injured over 200 others

• Worst structural failure in the history of the United State

Page 4: Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane

Causes of Failure Originally, 2nd and 4th floor walkways were to be

suspended from the same rod and held in place by nuts (fig-1)

Preliminary design specified a strength of 413 MPa for the hanger rods which was omitted on the final structural drawings

Following the general notes in the absence of a specification on the drawing, the contractor used hanger rods with only 248 MPa of strength

This original design, however, was highly impractical because it called for a nut 6.1 meters up the hanger rod and did not use sleeve nuts

Contractor modified this detail to use 2 hanger rods instead of one (as shown in fig-2) and the engineer approved the design change without checking it.

Design change doubled the stress on the nut under the fourth floor beam

Nut supported the weight of 2 walkways instead of one

                                                                                      

                                                                               

Original(Fig.1)

As-built(Fig.2)

Page 5: Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane

Causes of Failure

Rod hanger pulled through the box beam causing the connection supporting the 4th floor walkway to fail

Page 6: Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane

Technical Concerns

Neither the original nor the as-built design for the hanger rod satisfied the Kansas City building code making the connection failure inevitable

The toe-to-toe channels used in the Hyatt Regency provided for weak welding which allowed the nut to pull through the channel/box beam assembly initiating the collapse

A back-to-back channel design using web stiffeners when necessary (fig-3) or the use of bearing crossplates in conjunction with the toe-to-toe channels (fig-4) would have made the connection much stronger making it much more difficult for the nut to pull through

Fig-3

Fig-4

Page 7: Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane

Procedural Concerns

Collapse highlighted the lack of established procedures for design changes as well as the confusion over who is responsible for the integrity of shop details

It is important for all parties to fully understand and accept their responsibilities in each project

The engineer of record should design and detail all nonstandard connections

New designs should be thoroughly checked

All of the contractor's modifications to design details should require written approval from the engineer of record

Page 8: Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane

Conclusion

Neglecting to check the safety and load capacity of a crucial hanger even once shows complete disregard for the public welfare

Ethical engineers should check and recheck their work in order to be able to properly assure the public of a building's structural integrity

Also, the high number of fatalities resulting from the walkway's collapse raises the questions of whether the factor of safety required for a building should be proportional to the possible consequences of it collapse