Upload
katie-reilly
View
232
Download
3
Embed Size (px)
DESCRIPTION
Â
Citation preview
KATIEREILLY
Boston, Massachussetts 02115Berlin, Germany (Fall 2015)
[email protected] (619) 694-7797
TABLE OFCONTENTS
12345
678
91011
12
131415
PUBLIC PERFORMING ARTS SCHOOL RENDERINGS SITE SECTIONS & BUILDING DIAGRAMS PLANS SECTIONS LIBRARYSYSTEMS GREEN WALL CAVITY WALL WOOD FRAMINGPAVILIONS CARPENTER CENTER MUSEUM STAIRPRECEDENT ANALYSISHOUSING FREE PLAN CONTINGENCY PLANS SECTIONS EXPLODED AXONOMETRIC
PUBLICPERFORMING
ARTS SCHOOLRENDERINGS
1
PUBLICPERFORMING
ARTS SCHOOLSITE SECTIONS
Transition between residential neighborhoodand commercial district
Franklin and Blackstone Squares form a public park space adjacent to the site
Views of buildings in the financial districtin downtown Boston
Profile of the Cathedral of the Holy Crosslocated on Washington Street
Residential buildings located west of the site
SECTION B-BSite
Site
A
A
B
B
SECTION A-A
SHARED RESOURCES
SCHOOL
INDOOR AND OUTDOOR THEATER
PUBLIC
STUDENT
WALKABLE SURFACE
BUILDINGDIAGRAMS
2
PUBLICPERFORMING
ARTS SCHOOLGROUND FLOOR
PLAN
C
B
A
C
A
B
C
B
A
C
A
B
3
THIRD FLOOR PLAN
PUBLICPERFORMING
ARTS SCHOOL
4
SECTION A-A
SECTION B-B
SECTION C-C
PUBLICLIBRARY
ORTHAGONALS & DIAGRAM
A
A
A
A
ENTRY ELEVATION
GROUND FLOOR PLAN
SECTION A-A
SECOND FLOOR PLAN 0 20ft
BUILDING DIAGRAM
5
SYSTEMS GREEN WALL
SECTION ANDMODEL PHOTOS
6
SYSTEMSCAVITY WALL
SECTION
7’-11 “1116
3’-11 “1516
3’-4 “ 3 4
6’-0 “ 716
3’-3 “ 716
7’
8’-1 “ 716
6’
10 “ 3 4
8’-6 “ 1 8
1’-2”
3”
8’-7 “ 516
9 “ 716
5 “ 1 4
Concrete footing
Perforated drain pipe
Waterproofing
Foundation wall
Rigid insulation
Waterproofing
Earth
Flashing and weep holes
Modular brick veneer
Rigid insulation
Masonry tie
Shelf detail
Prefabricated window
Rigid insulation
Steel lintels
Flashing
Open cavity
Metal dowels
Continuous flashing
Concrete coping
DripFlashing and counterflashing
Rigid insulationGravel
Sloped rigid insulationSteel lintel
Roof membrane
Roof drainageSheathing
Metal tie strapsGypsum wall board
Strapping
Gypsum wall boardFurring
Solid wood deckingMetal tie straps
Heavy timber beamFirecut ends
Concrete masonry unitTrim
Finished floorSubfloor
Floor joistMetal tie strap
Firecut endGrout
Metal lath
Joint filler stripFloor slab
Wire meshWaterproofing
Gravel
Masonry Cavity WallScale: 3/4” = 1’
Katie ReillyARCH 2240: Architectonic Systems
Grogan Spring 2015
7
SYSTEMSWOOD
FRAMINGWATCH TOWER
PROJECT
A
A
A
A
CO
MM
ON
STUD
DOUBLE TOP PLATE
PLATE
END
RAFTER
CO
MM
ON
RAFTER
COLLAR TIE
RIDGE BOARD
SILL
DOUBLE HEADER
CR
IPPLE STUD
KING
STUD
CO
MM
ON
STUD
TRIM
MER
GABLE EN
D STU
D
DOUBLE TOP PLATE
PLATE
PLATE
YASC HANDOUT
8
SECTION A-A
FIRST FLOOR PLAN SECOND FLOOR PLAN
MODEL PHOTO
PAVILIONSCARPENTER
CENTER
9
AXONOMETRIC,MODULES,
& MODEL PHOTO
PAVILION SECTION
PAVILIONSMUSEUM
STAIR
10
EXPLODEDAXONOMETRIC & MODEL PHOTOS
PRECEDENTANALYSIS
BURR STREETSCHOOL BY
SOM
1 Administration2 Classrooms3 Gym and Auditorium4 Cafeteria5 Library and Media Center6 Music Rooms7 Walkways8 Courtyards
2
1
3
45
6
7
8
11
TYPOLOGY SITE AXONOMETRIC
PROGRAM SITE FIGURE GROUND
HOUSINGFREE PLAN
20 ft155 100
VANDENHAUTEKIEBOOMS
ANALYSIS AND MODEL PHOTO
FREE PLAN HOUSE STUDY
12
HOUSINGCONTINGENCY
FIRST FLOOR PLAN
!"#$%&!'((#&)'*+,-"%.&,/#"+0&12345*%"6&76"''8
2&&&&&&&&&&&9&&&&&&&&&&&&32&&&&&&&&&39&&&&&&&&&&12:%
A
B B
C C
A
!"#$%&'()$$*'+),%!-./0'!1*.%2'34567,/."'8".))9
4''''''''''':''''''''''''54'''''''''5:''''''''''34;/
B B
C C
@+AB'C@'>AD@E
A
A
!"#$%&'())$&*(+,-.#/"&-0$#,1&23456+/#7&87#((9
3&&&&&&&&&&&:&&&&&&&&&&&&43&&&&&&&&&4:&&&&&&&&&&23;/
B B
C C
@*AB&!@&>AC@D
A
A
13
SECOND FLOOR PLAN
THIRD FLOOR PLAN
HOUSINGCONTINGENCY
SECTION A-A
14
SECTION B-B
SECTION C-C
HOUSINGCONTINGENCY
EXPLODEDAXONOMETRIC
Contingencies AxonometricSmith Spring 2014Katie Reilly 15
KATIEREILLY
Boston, Massachussetts 02115Berlin, Germany (Fall 2015)
[email protected] (619) 694-7797