KC RICE 10. Controller Training June 8 & 9, 2010. Overview. Review the Exercise: Purpose Objectives Scope Clarify the role of Controllers. Exercise Purpose. - PowerPoint PPT Presentation
Citation preview
KC RICE 10
Controller Training
June 8 & 9, 2010
2
Overview
Review the Exercise: Purpose Objectives Scope
Clarify the role of Controllers
3
Exercise Purpose
Provide a learning environment for participants to exercise Continuity Plans, policies, and procedures following a simulated 6.7 magnitude earthquake with an epicenter in Carlyle, Illinois .
Promote inter-organizational communication.
Highlight areas of improvements and strengths.
4
Exercise Objectives
Testing Alert, Notification, and activation procedures for Continuity personnel and all other personnel;
Test plans for recovering or accessing Vital Records (both classified and unclassified) critical information systems, services and data;
Conduct a viability test of Continuity Facilities (e.g., power, water, fuel);
5
Exercise Objectives Test internal and external interoperability and viability of
communications systems, through monthly testing of continuity communications capabilities (e.g., secure and non-secure voice and data communications);
Test capabilities required to perform an agency’s Mission Essential Functions (MEFs) as identified in the business process analysis; and
Test internal and external interdependencies identified in agency’s continuity plan, with respect to performances of an agency’s and other agencies MEFs.
6
Exercise Scope Initial Event 1 will occur June 22, 2010 at 1600.
The remainder of the exercise will take place on June 23, at multiple area continuity locations.
Play will begin 0800 and end at 1200.
Participants will be dismissed at approximately 1200.
Agency reps and Lead Controllers will get released at approximately 1500 following an exercise Hot Wash.
7
Controller Responsibilities: Prior to the Exercise Complete a functional check of your Controller email capability at
the Continuity Facility/alternate site.
Notification system: Conduct a systems ops check and ensure scheduled
maintenance will not be occurring before or during exercise. Ensure contact lists required are current in all forms.
Make additional copies of the Participant Handbook as necessary.
8
Controller Responsibilities: Prior to the Exercise Participant Briefing
General discussion points: Exercise Times, Continuity Facility Location,
Directions, Parking, and Food/Beverage Options Provide access/copy of the Continuity Plan. Assign a scribe and evaluator for the exercise (if
able)
9
Controller Responsibilities: Alert and Notification Testing Controllers are responsible for delivering the
Scenario items and Injects from the MSEL On the afternoon of the June 22, Controllers should
conduct a comms check. USP3 will send out the initial Scenario item the
afternoon of June 22. Controllers will then push this to their participants via
the preferred system following the established time sequence in the MSEL.
10
Controller Responsibilities: Continuity Facility Kick-off Meeting
Review the safety and evacuation procedures while at the Continuity Facility/alternate site
Distribute Player Handbook as needed. Remind participants to take breaks as needed – no
official breaks are written into the exercise. Review MSEL and prepare for STARTEX at 0800.
11
Controller Responsibilities: MSEL: Blue, White, and Yellow
MSEL Item Color
Scenario BLUE
Action Items WHITE
Agency Action Items YELLOW
12
Controller Responsibilities: KC RICE ‘10 Exercise page
During the exercise scenario updates will get displayed at: http://sites.google.com/site/febrice10/home/rice-2010
Lead Controllers should visit this page throughout the exercise for updates and remind players throughout the exercise to access the site.
Exercise participants can also access this page.
13
Controller Responsibilities: KC RICE ‘10 Exercise page
14
Controller Responsibilities: Exercise at Continuity Facility
Observe and record the reactions to the events players are simulating.
Avoid coaching participants on the expected action.
Take detailed notes as the events unfold.
Remember – you are not an exercise player!
15
Controller Responsibilities: Exercise at Continuity Facility
There is no timeline for completion of the injects. Delay a Scenario Item if the inject currently being worked is
beneficial or has not been completed to your satisfaction. You can have a successful exercise without fully completing
the scenario.
If you delay a Scenario Item, resume with the delivery of the next in sequence; do not skip an Inject to catch-up.
16
Controller Responsibilities: Hot Wash at Continuity Facility
Facilitate Hot Wash at exercise location with exercise participants immediately after the exercise.
Exercise Hot Wash is at 1330 at FEMA Region VII, 9221 Ward Parkway with Lead Controller and select agency representatives
Collect Participant Evaluation Forms
We will cover Agency AAR forms at the Hot Wash
Questions?David Teska
During the exercise you can reach me at:(816) 283-7082