14
Kelowna International Airport Kelowna International Airport 2010 Development Program 2010 Development Program September 17, 2007 September 17, 2007

Kelowna International Airport 2010 Development Program September 17, 2007

Embed Size (px)

Citation preview

Page 1: Kelowna International Airport 2010 Development Program September 17, 2007

Kelowna International AirportKelowna International Airport2010 Development Program2010 Development Program

September 17, 2007September 17, 2007

Page 2: Kelowna International Airport 2010 Development Program September 17, 2007

2010 DEVELOPMENT PROGRAM

Page 3: Kelowna International Airport 2010 Development Program September 17, 2007

3

Passenger Growth ForecastPassenger Growth Forecast

FORECAST ASSUMPTIONSFORECAST ASSUMPTIONSMEDIUM RANGE FORECAST BASED ON 4.3% ANNUAL PASSENGER GROWTHMEDIUM RANGE FORECAST BASED ON 4.3% ANNUAL PASSENGER GROWTH

REFERENCE: 2025 MASTER PLANREFERENCE: 2025 MASTER PLAN

Page 4: Kelowna International Airport 2010 Development Program September 17, 2007

4

Ground AccessGround Access

1.Twin Airport Way Outbound

1.Install Double Left Turns at Highway 97 South Bound

1.Install Advanced Left Turn Signal On Highway 97

1.Expand Bus Parking To Accommodate 6 Full Size Highway/Municipal Buses

Estimated Cost $1,000,000

Page 5: Kelowna International Airport 2010 Development Program September 17, 2007

5

Vehicle ParkingVehicle Parking1. Increase Paved Vehicle Parking From 2,200 Stalls to

2,500 Stalls

1. Expand Short Term Parking from 320 to 600 Stalls

1. Increase Employee Parking From 170 Stalls to 250 Stalls

1. Develop Demand Management Strategy for 2010

1. Develop 1,000 stall gravel peak period overflow parking area

Estimated Cost $2,000,000

Page 6: Kelowna International Airport 2010 Development Program September 17, 2007

6

Car RentalsCar Rentals1. Build New Car Rental Terminal North Of Existing Air

Terminal

1. Provide Covered Ready Parking For 75 Vehicles Adjacent To New Car Rental Terminal

1. Expand Long Term Car Rental Parking By 80 Stalls

Estimated Cost $2,000,000

Page 7: Kelowna International Airport 2010 Development Program September 17, 2007

7

Air Terminal BuildingAir Terminal Building1. Build New 250 Passenger International Arrivals Area

1. Design New International Arrivals So That The Baggage Carousel Can Be Used For Domestic Arrivals

1. Convert Existing International Arrivals Area To Domestic Arrivals

1. Add Loading Bridges To Gate #6 & Gate #8

1. Expand Departure Room To Accommodate 680 Passengers Per Hour

1. Add Concessions To Expanded Departure Room

1. Increase Check-in Capacity To 680 Passengers Per Hour

1. Expand Outbound Baggage System To Handle 1200 Bags Per Hour

Estimated Cost $20,000,000** $300.00/Square Foot

Page 8: Kelowna International Airport 2010 Development Program September 17, 2007

8

AirsideAirside

1. Extend Runway To 8900 Feet

1. Expand Gate #7 To Accommodate Code E Aircraft

1. Expand Gate #8 To Accommodate Code C Aircraft

1. Add Taxiway Connector To Runway To Accommodate Code E Aircraft

1. Upgrade Type 4 Glycol Facility

Estimated Cost $10,370,000

Page 9: Kelowna International Airport 2010 Development Program September 17, 2007

9

2007 - 2010 Development 2007 - 2010 Development ProgramProgramRunway ExtensionRunway Extension

Page 10: Kelowna International Airport 2010 Development Program September 17, 2007

10

2010 Development Program2010 Development Program

Page 11: Kelowna International Airport 2010 Development Program September 17, 2007

11

MAGNITUDE OF COST MAGNITUDE OF COST ESTIMATEESTIMATE

$36,000,000

Page 12: Kelowna International Airport 2010 Development Program September 17, 2007

12

Budget SummaryBudget Summary

PROJECTS 2007 2008 2009 2010 Total

GLYCOL FACILITY 70,000 70,000

EXTEND RUNWAY 4,000,000 1,300,000 5,300,000

BALANCE OF PROGRAM 2,000,000 15,000,000 13,000,000 30,000,000

4,070,000 3,300,000 15,000,000 13,000,000 35,370,000

Page 13: Kelowna International Airport 2010 Development Program September 17, 2007

13

Financing SummaryFinancing Summary

2007 2008 2009 2010 TOTAL

2010 Capital Pgm 4.1 3.3 15.6 13.8 36.8

Existing Pgms 15.5 7.7 23.2

Borrowing 17.3 15.3 13.2 45.8

Interest Exp 0.7 0.6 1.0 1.8AIF Revenues (4.9) (6.1) (6.4) (6.7)

(million’s)(million’s)

Page 14: Kelowna International Airport 2010 Development Program September 17, 2007

14

Financing SummaryFinancing Summary

(million’s)(million’s)OUTSTANDING PAYMENTSOUTSTANDING PAYMENTS

-10

0

10

20

30

40

50

60

MFA

Internal