Focus Penguasaan Teknologi
Program Start, Program End,
System
DesignPreliminary
Design
Critical
Design
System
Test
Software &
Hardware
Development
Integration &
Installation
Activities
Acceptance
Test
Design, Development & Production Phases ( 2 years)
Fokus TOT mulai phase Design, Development dan Production
Mendapatkan Software Source Code dari Data Processing & Display
System, terdiri dari :
– Man Machine Interface Display System
– Core Software of the Main Processor
– Data Distribution Software
– Input/Output Software of the Sensor Subsystem.
Mendapatkan Know How :
– Tactical Management & Display System
– Multi Mission Radar
– Surveillance Radar & IFF
Kapal PKR Mission Integration System Block Diagram
Dual
Redundant
Central I/O
Processor
MilStd 1553B
Data busVideo Bus
Video Bus
Redundant
Data Bus
SAM SSM Decoy LaunchersGUNS Navigition
system
SMS
Surveillance
Radar
Navigation
Radar
Target
Designation
Sight ESM
ECM
Sonar SystemComm System
& Data link
Data Handling
System
Mass Storage
Dev.
OPERATOR CONSOLE STATION
Bridge
Console
Station
PERUSAK KAWAL RUDAL (PKR) OPERATIONAL REQUIREMENTS TNI-AL
Length Overall : ± 105,00 m
Breadth : ± 14,00 m
Depth : ± 8,80 m
Draught (Full load) : ± 3,70 m
Displacement (Full Load) : ± 2400 t
Speed (max/cruiser/econ.) : ± 30/18/14 kn
Main Engine : ± 4 x 9.240 hp
Range at 18 kn : ± 5.000 nm
Endurance : ± 12 d
Complement : ± 100 ~120 p
MISI OPERASI
1. Peperangan Elektronika
2. Peperangan Anti Udara
3. Peperangan Anti kapal Selam
4. Peperangan Anti Kapal Permukaan
5. Bantuan Tembakan Kapal
UKURAN UTAMA
20152010 2011 2012
Efective Contract
2014
PRODUCTION SCHEDULE KAPAL - 1
Fabrication Start
Joint Procurement PAL & Partner
Launching Test & Trial
MATERIAL SCHEDULE
Joint Design PAL & Partner
Keel Laying
DESIGN SCHEDULE
ASUMSI PRODUCTION SCHEDULE KAPAL - 2
Fabrication Start Launching Test & TrialKeel Laying Delivery Kapal 2
Delivery Kapal 1
Production in PT PAL Supervised by Partner
TENTATIVE SCHEDULE PRODUKSIPKR DI PT PAL INDONESIA
Catatan : Kapal PKR no.1 diselesaikan selama 44 bulan
Kapal PKR no. 2 diselesaikan dengan interval 6 bulan.
( 14 Bln)
2013
( 28 Bln)
( 36 Bln)
( 36 Bln)
METODE PEMBANGUNAN
= Target Co-Production
Keterangan:
AUX. SECTION – I
( 540 ton)
E/R SECTION – III
( 980 ton )
FORE SECTION – II
( 450 ton )
ACCOM. SECTION – IV
( 150 ton )BRIDGE SECTION – V
( 130 ton )
BERAT TOTAL KAPAL KOSONG ± 2.250 ton
4000
0
743771300013000
Peng
ering
an K
ayu
Cran
e Cap
2 To
n
Cran
e Cap
2 To
n
Blow
er K
ayu
Guda
ng P
rodu
k Inte
rior
Beng
kel P
engg
erga
jian
Fabr
ikasi
Alum
unium
12000
47000
1296
50
7780
0
1191
7
3608
5
Cran
e Cap
6.3 T
onPe
ngem
bang
an B
engk
el Alu
muniu
m
5185
0
Bengkel Interior
Jalan Masuk1700
0
R. B
asah
Kantor
5600
Pohon
6050
Sampah skrap
Tangki Air
Halaman & Parkir
Tower 9 m5000L
1191
7
3400
0
2 x Gantry Crane Cap 15 Ton
paga
r por
table
For
1191
7
Latic
e Floo
r
1191
7
Sub
Asse
mbly
Asse
mbly
PENGEMBANGAN ASSEMBLY 4
10037
45237
9250
1191
7
Barat
12600
Selatan
Timur
To DKN
150351550058001300
7535 1200020001000
12000 7000
Utara
Derm
aga B
arat
28500 5300
Bengkel Pipa
R.Genset
Gudang PipaKantor OutFittingGudang
R. KompresorR. Basah
R. Ganti
Mushola
X - Ray
Bengkel Mesin
Crane cap 5 Ton
Outlet Graving Pump
Outlet Graving Pump
63000
PERENCANAAN REKLAMASI DERMAGA
Kantor
Contr
ol Ho
use
Bengkel Ship Fitter
Crane cap 5 Ton
Dermaga Selatan
115500
Ship Lift
Tangki
10000
Penambahan Fasiltas
SAND BLAST WORKSHOP
15 m x 15 m LATICE FLOOR12 m x 12m
LATICE FLOOR12 m x 12m
LATICE FLOOR
12 m x 12m 12 m x 12m
LATICE FLOOR
12 m x 12m
LATICE FLOOR
12 m x 12m
LATICE FLOOR
12 m x 12m
LATICE FLOOR
12 m x 12m
LATICE FLOOR
Penambahan Fasilitas
LCC Crane 30 Ton
LCC Crane 30 Ton
LCC Crane 30 Ton LCC Crane 30 Ton
GRAV
ING
DOCK
IRIA
N
Mesin Potong
Bengkel Assembly HallCrane cap 2 x 16 Ton
Crane cap 12.5 Ton
Bengkel Alumunium Bengkel FabrikasiPenambahan PanjangMeja PotongMesin Plasma Cutting
Bengkel Cat Gudang Paletizing
Beng
kel S
and B
last
R. Makan
Gudang
R. B
asah
Kanto
r R.
Bas
ahKa
ntor B
isnis
Area
Par
kir
R. B
asah
Area
Par
kir
R. B
asah
Dermaga Selatan Daerah Jangkauan Crane 30 m
eter
ReklamasiJalur LCC Crane 20 Ton
208 M
x 26
,7 M
107 M x 30 M
134 M x 36 M
27 M x 31 M
107 M x 30 M
27 M x 31 M
47,5
M x 2
3 , 5
M
75 M x 37 M
65 M
x 25
M
60 M x 16,5 M
60 M x 16,5 M
60 M x 22,5 M
6
5
4
3
2
1
7
AREA – DIVISI KAPAL PERANG
3
6
Sand Blasting Work Shop
Fabrication Work Shop
Sub. Assembly Work Shop
Assembly
Transfer Area
Ship Lift
Graving Dock Irian
Joint Module
STRATEGI PEMBANGUNAN
Gantry Crane baru,200 t
FEASIBILITY STUDY
• Propulsion & Auxiliary
Mach.Sys.
• Comm. & power electrical
Sys.
• Hull & Hydrodynamic .
• Survivability & damage
control.
• Signature – detectability,
etc
CONCEPTUAL DESIGN.
• Ship lay out for command,
weapon, sensor, accomm, etc.
• Agree definitive statement
with MOD.
• Specification .
• Powering.
• Stability.
• Contruction design.
• Costing.
PRELIMINARY/BASIC DESIGN
• Produce devinitive design .
• Integrated design, ship
arrangement, machinery &
system.
• Main equipment.
• Removal routes.
• Ship structures.
• Vibration calculation.
• Static & Dynamic Stability
DETAIL DESIGN
• Detail design &
Production Drawing.
PENTAHAPAN ALIH TEKNOLOGI (PLATFORM)
PROSES DESAIN
Ship # 1 : 80 % PENGUASAAN TEKNOLOGI
Ship # 2 : 100 % PENGUASAAN TEKNOLOGI100% Penguasaan Teknologi
3 ALTERNATIVES DESIGN1 BASE LINE DESIGN
DEFINITIVE DESIGN
SUPPORTING
PRODUCTION
PENTAHAPAN ALIH TEKNOLOGI (COMBAT SYSTEM)
FEASIBILITY STUDY
Define the mission
requirement
Evaluate the postulated
threat and the operational
requirement
Define the physical, cost
and political constraints
Define the operational
requirement
Identify candidate
equipment and sub-system
Ship # 1 : 40% PENGUASAAN TEKNOLOGI
Ship # 2 : 80% PENGUASAAN TEKNOLOGI.
60% PENGUASAAN TEK
100% PENGUASAAN TEK
CONCEPT DESIGN
Performance requirement
analysis
Combat system location
and arrangement plan
Weight, area, volume
requirement
Preliminary system
architecture
- Software preliminary
design
PRELIMINARY DESIGN
Operational sequence diagram
Surface and air combat
effectiveness analysis
Control and communication
studies and analysis
C/S integration studies
- Software C/S integration
design
C/S space arrangement studies
Top side arr’t studies
Communication antenna
selection and arrangement
Signature Level Requirements
Definition
MAIN CONTRACT
IN FORCE DETAIL DESIGN
C/S Installation Design
C/S Software development
Integration
C/S Installation Procedure &
Plan
Alignment Procedure & Plan
Physical Integration
Procedure & Plan
S/S STW Procedure & Plan
S/S HAT Procedure & Plan
S/S SAT Procedure & Plan
C/S Functional Integration
Procedure & Plan
continued
PROSES DESAIN
Ship # 3 : 100% PT.PAL AKAN MENGUASAI TEKNOLOGI COMBAT SYSTEM.
TOP LEVEL REQ.PROJECT DEFINITION
REALIZATION INSTALATION
INSTALLATION & ALIGNMENT &
PHYSICAL INTEGRATION
Installation Activities
Alignment Activities
Physical Integration Activities
Management, planning and
coordination
TEST & TRIAL
Setting To Work (STW)
Harbor Acceptance Test (HAT)
Functional Integration Test /
System Integration Test (SIT)
Sea Trial Test (SAT)
Live Firing Trial
Management, Planning &
Coordination
MAINTENANCE
On-Board Level Maintenance (OLM)
Intermediate Level Maintenance (ILM)
Depot Level Maintenance (DLM)
EXTENDED
Hardware & Software of Combat
System TOT
Ship # 1 ASSISTED BY TECHNICAL ASSISTANCE
Ship # 2 FULLY BY PT PAL
PENTAHAPAN ALIH TEKNOLOGI PRODUKSI
• FABRICATION
• SUB ASSEMBLY.
• ASSEMBLY.
INSTALLATION / SETTING TO WORK
• OUT FITTINGS.
• JOINT BLOCK / SECTION.
TEST AND TRIAL
• HAT & SAT.
• INCLINING TEST
PLATFORM
COMBAT SYSTEM
PLATFORM
MAIN DESCRIPTION
THEORETICAL & OJT
PLACE OF
TRAINING
Time
(WEEKS)Number
of
PT PAL
personsClass OJT.
A. PROJECT MANAGEMENT
A1 - PROJECT MANAGER
- CONTRACT MASTER SCHEDULE
- CAPABILITY PLAN
- PARTNERING AND SUBCONTRACTING
- QUALITY ASSURANCE PLAN
- RISK MANAGEMENT PLAN
- RECOVERY PLAN
- STANDARDIZATION
Yard Partner 2 7 2
A2 - CONTRACT &
FINANCIAL
MANAGEMENT
- CONTRACT & PROCUREMENT MANAGEMENT
- FINANCIAL MANAGEMENT
- INTELLECTUAL PROPERTY
Yard Partner 1 7 2
Theoretical, On The Job Training & Design Cooperation
for the Platform
B. PRODUCTION Place Of
Training
Class
(weeks)
OJT
(weeks)
Number of
PT PAL persons
PRODUCTION
MANAGEMENT
B.1. PPC (Production Planning & Control)
- PROJECT PLANNING AND SCHEDULING,
ESTIMATION AND PRODUCTION CONTROL
- PREPARATION OF WORK ORDER AND
MANAGEMENT
- BUILDING STRATEGY
- WORKSHOP LEVEL EQUIPMENT AND
WORKMANSHIP ORGANIZATION
Yard Partner 2 32 (Production
Planning & Control
expert)
B.2. SUPPORT
- INFRASTRUCTURAL DEVELOPMENT PLANN
- SAFETY PLAN
- FACILITIES PLAN
- JIGS, MOCKCS, MOLDS
- STORE AND STOCK PLAN & MANAGEMENT
- MATERIAL HANDLING
- SECURITY PLAN
Yard Partner 2 32 (shipyard facilities
expert)
B.3. CONSTRUCTION
- FABRICATION & ASSEMBLY PLAN
- BUILDING SQUENCES
- STEEL WORKS
Yard Partner 2 3 2 (structure)
B.4. OUTFITTING
- MACHINERY
- ELECTRIC
- PIPING
- COMBAT SYSTEM
Yard Partner 2 3
2 (mach)
2 (elect)
2 (piping)
4 (combat)
Theoretical, On The Job Training & Design Cooperation
for the Platform Lanjutan
C. DESIGNPlace Of
Training
Class
(weeks)
OJT
(weeks)
Number of
PT PAL persons
C.1 – DESIGN
SUPPORT
MANAGEMENT
- DESIGN ORGANISATION
Yard
Partner1 9
1(Project
engineer)
- STANDARDIZATION IN DESIGN
- DESIGN TOOLS (RULES/STANDARDS/NORMS/
COMPUTER AIDED DESIGN)
- DESIGN COORDINATION AND INTEGRATION
- PREPARING WORK PACKAGES
- TECHNICAL AGREEMENT, INTEGRATION OF
HUMAN - MACHINE, DOCUMENT OF PROJECT
DEFINITION, PREPARATION OF INTEGRATION
DOCUMENTS
C.2 - BASIC AND
FUNCTIONAL
DESIGN
- DESIGN OF SHIP FORM & PERFORMANCE
Yard
Partner1
9 1(Naval Architect)
- MAIN PROPULSION SYSTEM, SHIP SERVICE
SYSTEM DESIGN9 1 (Propulsion)
- ELECTRIC & AUTOMATION SYSTEM DESIGN 91 (Electric &
Automation)
- WEAPON & ELECTRONIC SYSTEM DESIGN &
INTEGRATION9
2 (Combat
system)
- CONSTRUCTION 9 1(Structure)
Theoretical, On The Job Training & Design Cooperation
for the Platform Lanjutan
D. TEST AND TRIALSPlace Of
Training
Class
(weeks)
OJT
(weeks)
Number of
PT PAL
persons
D.1- TEST AND TRIALS
- TEST & TRIAL MANAGEMENT FOR
COMBAT SYSTEMS
Yard Partner 1 12 (quality
assurance)
- TEST & TRIAL MANAGEMENT FOR
PLATFORM SYSTEMS
D.2 - PREPARING SHIP
FOR DELIVERY- PREPARING SHIP FOR DELIVERY
D.3 - QUALITY
ASSURANCE
MANAGEMENT
- QUALITY ASSURANCE MANAGEMENT
D.4 - QUALITY
- MEASURING&EVALUATION
- NON DESTRUCTIVE TESTS
- GUARANTEE ENGINEERING
Theoretical, On The Job Training & Design Cooperation
for the Platform Lanjutan
Theoretical, On The Job Training & Design Cooperation
for the Combat System
Combat System ToT
PackageDESCRIPTION
THEORETICAL & OJT
PLACE OF
ToT
Time
( weeks)
Total Number
of
Indonesian
Engineers
THEORETICAL/PRACTICAL TRAINING COURSES
TRAINING COURSES
- PROJECT MANAGEMENT AND PROCUREMENT
PROCEDURES
- COMBAT SYSTEM DESIGN
- SUBSYSTEM DESIGN
- COMBAT SYSTEM INTEGRATION STUDIES
- COMBAT SYSTEM FUNCTIONAL INTEGRATION
- ON BOARD INTEGRATION AND SET TO WORK
- HAT, HIT, SAT, SIT PROCEDURES PREPARATION AND
TEST EXECUTION
- TOOLS, SAFETY/SECURITY, MIL-STD, INSPECTION,
QUALITY CONTROL
C/S
Manufacturer6
16
(AS PER
BELOW)
Theoretical, On The Job Training & Design Cooperation
for the Combat System
On the Job Training Place Of ToTTime
( weeks)
Total Number
of
Indonesian
Engineers
PROJECT MANAGEMENT
- CS MASTER SCHEDULE
- PARTNERING AND SUBCONTRACTING PLAN
- QUALITY ASSURANCE PLAN
- RISK MANAGEMENT PLAN
C/S
Manufacturer
PT PAL +
Indonesian
Industries
8
16
2
2
COMBAT
SYSTEM/SSYSTEM
DESIGN
- SOFTWARE SOURCE CODE FROM DATA
PROCESSING & DISPLAY, CORE SOFTWARE FROM
THE MAIN PROCESSOR.
- DATA DISTRIBUTION SOFTWARE INPUT/OUTPUT
SOFTWARE OF THE SENSOR SUBSYSTEM, ETC.
- PROJECT PLANNING AND SCHEDULING,
ESTIMATION AND PRODUCTION CONTROL
- PREPARATION OF WORK ORDER AND
MANAGEMENT
- COMBAT SYSTEM ARCHITECTURE DESIGN
- INTERFACE DEFINITION & MANAGEMENT
- SYSTEM ANALYSIS
C/S
Manufacturer16 6
COMBAT SYSTEM SET
TO WORK,
INTEGRATION, TEST,
TRIAL, ACCEPTANCE
PREPARATION OF THE
RELATED PROCEDURES
- COMBAT SYSTEM INTEGRATION/ACCEPTANCE PLAN
AND PROCEDURES
- COMBAT SYSTEM INSTALLATION REQUIREMENT
- COMBAT SYSTEM PHISICAL INTERFACE DEFINITION
- COMBAT SYSTEM SET TO WORK
- COMBAT SYSTEM INTEGRATION
- COMBAT SYSTEM TEST AND ACCEPTANCE TRIALS
C/S
Manufacturer
PT-PAL +
Indonesian
Industries
16
64
4
4
Lanjutan
Theoretical, On The Job Training & Design Cooperation
for the Combat System
On the Job Training Place Of ToTTime
( weeks)
Total Number
of
Indonesian
Engineers
TECHNICAL DATA
PACKAGE
- COMBAT SYSTEM DESIGN DRAWINGS
- COMBAT SYSTEM MATERIAL SPECIFICATION
- PROCESSES INFORMATION
- TEST DATA
PT-PAL +
Indonesian
Industries
TECHNICAL
ASSISTANCE
- DOCUMENTS PROVISION DURING COMBAT SYSTEM
DESIGN PHASE
- DOCUMENT PROVISION DURING STW,INTEGRATION,
HAT, HIT, SAT, SIT, ACCEPTANCE OF THE COMBAT
SYSTEM
PT-PAL +
Indonesian
Industries
continuous
ADDITIONAL TRAINING
- COMBAT SYSTEM MAINTENANCE COURSES
- TRAINERS TRAINING COURSES
PT-PAL +
Indonesian
Industries
64
4
4
Note: The number of trainees in the same Colum is the same person, total number of trainees is 16 persons
(including National Industries), consisting of 8 persons for the design and 8 persons for production.
Lanjutan
PLATFORM Project Execution at PT. PAL Shipyard.
ACTIVTIES DESCRIPTION
PROJECT EXECUTION
Number of
Yard Partner
persons
Time
PROJECT EXECUTION MANAGEMENT AND ASSISTANCE
1. PROJECT
MANAGEMENT
FROM YARD PARTNER:
ONE (1) PROJECT MANAGER
TWO (2) PROJECT MANAGER ASSISTANTS
3 44 Months
2. CONSTRUCTON
DESIGN PHASE AT
PT PAL
YARD PARTNER ASSISTANCE AT PT PAL
ONE (1) ENGINEER ELECTRICAL
ONE (1) ENGINEER STRUCTURE
ONE (1) ENGINEER 3D MODELLING OF PIPING & DUCT &
OUTFITTING DESIN
Note: PTPAL will carry out the construction design and all the related
activities
3 12 Months
3. CONSTRUCTION
ASSISTANCE
YARD PARTNER SUPERVISORS WILL ACT ALSO AS ON JOB
TRAINERS TO THE PT PAL PERSONNEL IN THE RESPECTIVE
FIELD OF ACTIVITY.
THREE (3)YARD PARTNER SUPERVISORS FOR PLATFORM (
CONSTRUCTION, SYSTEMS & SUB SYSTEM).
ONE (1)YARD PARTNER SUPERVISOR FOR COMBAT SYSTEM
4 25 Months
4. SAT ASSISTANCEYARD PARTNER SUPERVISORS WILL SUPPORT PAL FOR THE
EXECUTION OF SEA ACCEPTANCE TESTS3 6 Months
5. MATERIAL
ASSISTANCE
YARD PARTNER SUPERVISOR WILL SUPPORT PAL FOR THE
MATERIAL PROCUREMENT; MATERIAL AND EQUIPMENT
DELIVERY; WAREHOUSE MONITORING
1 30 Months
COMBAT SYSTEM Project Execution at PT. PAL Shipyard.
Combat System ToT Package DESCRIPTION
PROJECT EXECUTION
NUMBER OF
C/S
Manufacturer
Experts in
Time
(Months)
Total Number
of
Indonesian
Engineers
ON THE JOB TRAINING
PROJECT MANAGEMENT
- CS MASTER SCHEDULE
- PARTNERING AND SUBCONTRACTING PLAN
- QUALITY ASSURANCE PLAN
- RISK MANAGEMENT PLAN
2 24 2
COMBAT SYSTEM SET TO
WORK, INTEGRATION,
TEST, TRIAL, ACCEPTANCE
PREPARATION OF THE
RELATED PROCEDURES
- COMBAT SYSTEM INTEGRATION/ACCEPTANCE
PLAN AND PROCEDURES
- COMBAT SYSTEM INSTALLATION REQUIREMENT
- COMBAT SYSTEM PHYSICAL INTERFACE
DEFINITION
- COMBAT SYSTEM SET TO WORK
- COMBAT SYSTEM INTEGRATION
- COMBAT SYSTEM TEST AND ACCEPTANCE
TRIALS
10 30 7
TECHNICAL DATA PACKAGE
- COMBAT SYSTEM DESIGN DRAWINGS
- COMBAT SYSTEM MATERIAL SPECIFICATION
- PROCESSES INFORMATION
- TEST DATA
2 6 3
TECHNICAL ASSISTANCE
- DOCUMENTS PROVISION DURING COMBAT
SYSTEM DESIGN PHASE
- DOCUMENT PROVISION DURING
STW,INTEGRATION, HAT, HIT, SAT, SIT,
ACCEPTANCE OF THE COMBAT SYSTEM
2 12 1
ADDITIONAL TRAINING- COMBAT SYSTEM MAINTENANCE COURSES
- TRAINERS TRAINING COURSES2 4 6
PT PAL PORTION PKR PROJECT
31%
43%
4 %
2.5 %
11.5 %8 %
PF
C/S
T/A
EXP.
NR&DMH
Main Equipment 19.5 %
Raw Material 11.5 %
= PAL PORTION 25 % untuk kapal ke -1( 18% dibelanjakan di dalam
negeri,7% import /manage by PT.PAL )
Keterangan:
3 % (design partly)
PROJECT MANAGER
PARTNER
COMBAT SYSTEM
SUPERVISOR
PARTNER- P/F
DEPUTY
PROJECT MAN. MANAGER COMBAT SYS.
PARTNER
MANAGER PLATFORM
PARTNER
SUPERVISOR
PARTNER - C/S
Aktivitas di PT PAL
Construction, Design,
Procurement
(PAL’S Portion)
SATGAS
ReportReport
Monitor
Report
Platform
Monitor
Supervise PAL Supervise PAL
For Platform ActivityFor Combat System
PT PAL
PLATFORM
SKEMA MANAGEMEN PROYEK
Report
Report
C/S
Monitor
BOARD OF JOA
MAIN CONTRACTOR
PROJECT OFFICER ( KEMHAN, TNI-AL)
KEY SUCCESS FACTOR
1. PKR DIBANGUN DI DIVISI KAPAL PERANG, DIMANA MANAJEMEN &
ORGANISASI PROYEK YANG MELIPUTI ENGINEERING, PROCUREMENT,
CONSTRUCTION DAN FINANCE DIKELOLA SECARA ‘TERPISAH’ DARI
KEGIATAN KORPORASI PT PAL;
2. KOMITMEN PENUH MANAJEMEN, KARYAWAN PT PAL SERTA PARA
STAKE HOLDER UNTUK MENDUKUNG PROGRAM PKR;
3. SELEKSI KHUSUS SDM YANG TERLIBAT DI DALAM PROYEK PKR
SESUAI KOMPETENSI YANG DIBUTUHKAN;
4. KOMITMEN INVESTASI SECARA JELAS DARI PARTNER UNTUK
PENINGKATAN KAPASITAS & FASILITAS PRODUKSI DIV. KAPAL
PERANG;
5. MAXIMIZE LOCAL CONTENT DARI PEMENANG TENDER YANG AKAN
MENJADI PARTNER PT PAL;
6. DUKUNGAN PENUH DARI KEMENTERIAN PERTAHANAN DAN TNI AL
DALAM PELAKSANAAN PEMBANGUNAN PKR.
SKEMA JOINT OPERATION
PT PAL
PELAKSANA
PEMBANGUNAN
PKR
J.O.
PT PAL & PARTNER
PEMENANG
TENDER PKR
PARTNER
Kontrak
Pembangunan
JOINT OPERATION DILAKSANAKAN UNTUK MENDUKUNG
PENGEMBANGAN FASILITAS PRODUKSI DALAM RANGKA
PEMBANGUNAN PKR
INVESTASI
PENINGKATAN
KAPASITAS &
PERALATAN
PRODUKSI
SASARAN & HARAPAN
1. PEMBANGUNAN PKR # 1 DILAKSANAKAN SEPENUHNYA DI PT PAL
DENGAN MAXIMIZING LOCAL CONTENT (PORSI PAL);
2. HAK PATENT DESAIN PKR 105M MENJADI MILIK BERSAMA KEMHAN DAN
PEMENANG TENDER PKR ;
3. KEMHAN Cq. PT. PAL MEMILIKI HAK UNTUK MENJUAL KAPAL YG SAMA/
SIMILAR KE NEGARA ASEAN DAN ASIA;
4. BILA PEMENANG TENDER PKR MENJUAL KAPAL YG SAMA/SIMILAR
PT. PAL MEMPUNYAI HAK MENSUPPLY ENGINE ROOM SECTION DAN
ACCOMMODATION SECTION DALAM RANGKA ‘ CO-PRODUCTION ‘.
AGAR KEMENTERIAN PERTAHANAN DAN TNI-AL
MEMPERSYARATKAN KEPADA PEMENANG TENDER PKR SEBAGAI
BERIKUT :
PT. PAL SEBAGAI INDUSTRI STRATEGIS PERTAHANAN SECARA MANDIRI
MAMPU MENDESAIN DAN MEMPRODUKSI KAPAL JENIS PKR, FRIGATE
DAN KAPAL ATAS AIR LAINNYA.
SASARAN
HARAPAN