Kenneth L Ferrer Portfolio

Embed Size (px)

DESCRIPTION

Sample of academic and professional work up to spring 2016.

Citation preview

Page 1: Kenneth L Ferrer Portfolio
Page 2: Kenneth L Ferrer Portfolio

Kenneth L Ferrer345 Averill Avenue Rochester. NY.14620(585) [email protected]

Page 3: Kenneth L Ferrer Portfolio

01 intro|content

academic work

the hive|02

clinton avenue|08

playhouse|14

proffesional experience

weymouth cottage|16

other

gandhi institute greenhouse|22

Page 4: Kenneth L Ferrer Portfolio

02 overview|the hive

The purpose of this project is to revitalize the area of St. Paul Street previously known as the “St. Paul Quarter” to become The Hive Village. The design intent is to re-purpose three of the buildings providing interconnectivity for mixed-use occupancy. The three buildings will be designed for affordable housing, retail, restaurant and assembly occupancies. The vision extends beyond the limits of the mixed-use development and these future ideas have the potential to reinforce the development of “The Hive Village ”.

Page 5: Kenneth L Ferrer Portfolio

03clinton avenue|site analysis

N

Page 6: Kenneth L Ferrer Portfolio

04 site plan|the hive

N

Page 7: Kenneth L Ferrer Portfolio

05the hive|1st floor plan

Page 8: Kenneth L Ferrer Portfolio

06 2nd floor plan|the hive

Page 9: Kenneth L Ferrer Portfolio

07the hive|6th floor plan

Page 10: Kenneth L Ferrer Portfolio

08 overview|clinton avenue

This project focus on the redevelopment of a suburban greenfield site. It required a thorough look at the neighborhood and site. Develop a site concept and go through all the stages of the design process from programming to schematic design with an emphasis on site design.

visionA place of convergence, where uses intermingle with each other in complete harmony. Bringing people to and through the site, with the establishment of amenities and uses that are underrepresented in the surrounding area as a way of serving as an economical and social catalyst. The development function as a connection between the surrounding developments, facilitating access between each other making the site and its surrounding a much more dynamic, accessible, and interesting place.

1

Page 11: Kenneth L Ferrer Portfolio

09clinton avenue|neighborhood assesment

Page 12: Kenneth L Ferrer Portfolio

10 bubble diagram|clinton avenue

Page 13: Kenneth L Ferrer Portfolio

11clinton avenue|site plan

area disturbed

recreational field

recreational field

commercial parking

commercial parking

residential parking

plaza

park

64%

Page 14: Kenneth L Ferrer Portfolio

12 building use diagram|clinton avenue

residential units

retail units

office units

Page 15: Kenneth L Ferrer Portfolio

13clinton avenue|rendering2

3

Page 16: Kenneth L Ferrer Portfolio

14 overview| playhouse

Design as a warm-up exercise to later studio projects, the playhouse must function as a atraction for kid and adult alike.

visionThe design as a working sculpture, children could climb through, enjoying its irregular interior space and the unique vantage point from its translucent panels, finally being rewarded at the end with a thrilling slide ride down to the ground.

Page 17: Kenneth L Ferrer Portfolio

15playhouse |plan & section

Page 18: Kenneth L Ferrer Portfolio

16 overview|27 lower howes road

LineSyncArchitecturewww.LineSync.com

802.464.252614 Castle Hill

Wilmington, VT 05363

DRAWING LISTA0.0 - CoverA2.0 - North/South ElevA2.1 - East/West ElevA3.0 - Basement PlanA3.1 - 1st Floor PlanA3.2 - Loft PlanA4.0 - Section IA4.1 - Section IIA4.2 - Section IIIA5.0 - Foundation DetailA5.1 - Wall/Roof DetailA5.2 - W/R Dormer DetailA5.3 - Garage Door DetailA6.0 - Schedule

Weymouth Residence

27 Lower Howe's Road Wilmington, VT

Project Number

1511

L S A

Revision Date

Aug 18, 2015

Bid Set

Not for construction

Original Submission Date

July 08, 2015

July13, 20151

August 05, 20152

August 18, 20153

A- 1.0

Done while working at Linesync Architecture and located in Southern Vermont, 27 Lower Howes Road is a addition to a already existing cottage. The addition double the size of the cottage to make room for a family of four. For this project I was involved from the schematic design all the way to preperation of bid documents.

Page 19: Kenneth L Ferrer Portfolio

1727 lower howes road |elevations

0 8' 16' North Elevation 1/8" = 1'-0" 1

LineSyncArchitecturewww.LineSync.com

802.464.252614 Castle Hill

Wilmington, VT 05363

DRAWING LISTA0.0 - CoverA2.0 - North/South ElevA2.1 - East/West ElevA3.0 - Basement PlanA3.1 - 1st Floor PlanA3.2 - Loft PlanA4.0 - Section IA4.1 - Section IIA4.2 - Section IIIA5.0 - Foundation DetailA5.1 - Wall/Roof DetailA5.2 - W/R Dormer DetailA5.3 - Garage Door DetailA6.0 - Schedule

Weymouth Residence

27 Lower Howe's Road Wilmington, VT

Project Number

1511

L S A

Revision Date

Aug 18, 2015

Bid Set

Not for construction

Original Submission Date

July 08, 2015

July13, 20151

August 05, 20152

August 18, 20153

A- 2.0

Align

0 8' 16' New Window1/8" = 1'-0" 3

A- 2.0South Elevation 1/8" = 1'-0"

0 8' 16' 2

101

102

9' - 6"T.O. 1st FF

23' - 9"T.O. Dormer

V.I.F.T.O. Roof

9' - 6"T.O. 1st FF

0' - 0"T.O. Slab

V.I.F.T.O. Roof

Blackened Copper Composite

Blackened copper 30" NTS Composite

2' 6" 2' 6"

4x4 PT Post

Pre-Cast Concrete Pier

Re-Use Existing Entry Strairs

002

003

1

32

9

12 1

311

14

1 1 1 1

5

10

7 8

64

31

31

31

31

31

5 5 5

30

30

Page 20: Kenneth L Ferrer Portfolio

18 floor plan|27 lower howes road

Reuse Entry Stair

LineSyncArchitecturewww.LineSync.com

802.464.252614 Castle Hill

Wilmington, VT 05363

DRAWING LISTA0.0 - CoverA2.0 - North/South ElevA2.1 - East/West ElevA3.0 - Basement PlanA3.1 - 1st Floor PlanA3.2 - Loft PlanA4.0 - Section IA4.1 - Section IIA4.2 - Section IIIA5.0 - Foundation DetailA5.1 - Wall/Roof DetailA5.2 - W/R Dormer DetailA5.3 - Garage Door DetailA6.0 - Schedule

Weymouth Residence

27 Lower Howe's Road Wilmington, VT

Project Number

1511

L S A

Revision Date

Aug 18, 2015

Bid Set

Not for construction

Original Submission Date

July 08, 2015

July13, 20151

August 05, 20152

August 18, 20153

ExistingDeck

G

B

C

D E

F

A

Living Room810 sq ft

ExistingBedroom

1A4.0

1A4.1

1 A.2.1

2 A.2.1

1 A.2.0

2 A.2.0

C L

C L

12' 6"

KEY 2

South Perspective N.T.S. 2

Kitchen

ExistingW.C.

Bar

Bar Top@ 34" HT V.I.F.(To Align w/ Window)

1A4.

2

New Stairs

C L C L

A- 3.1 0 8' 16'

1st Floor Plan 1/8" = 1'-0" 1

8X8

6X6

4"X6" Solid Wood Post

Remove Roofing and 2x6 Ceiling

UP

DN

1 3 2 4 5 6 7

Page 21: Kenneth L Ferrer Portfolio

1927 lower howes road |section

LineSyncArchitecturewww.LineSync.com

802.464.252614 Castle Hill

Wilmington, VT 05363

DRAWING LISTA0.0 - CoverA2.0 - North/South ElevA2.1 - East/West ElevA3.0 - Basement PlanA3.1 - 1st Floor PlanA3.2 - Loft PlanA4.0 - Section IA4.1 - Section IIA4.2 - Section IIIA5.0 - Foundation DetailA5.1 - Wall/Roof DetailA5.2 - W/R Dormer DetailA5.3 - Garage Door DetailA6.0 - Schedule

Weymouth Residence

27 Lower Howe's Road Wilmington, VT

Project Number

1511

L S A

Revision Date

Aug 18, 2015

Bid Set

Not for construction

Original Submission Date

July 08, 2015

July13, 20151

August 05, 20152

August 18, 20153

Roof Line

Existing

Pitch to Match Exisiting

Add Exterior Insulation to Existing Conc Walls Per Foundation Plan2 LYWE R-10 W/STO/Finish to Top of Footing

See A4.1 For Typ. Glass Wall Const

V.I.F.T.O. Roof

W16x40

0' - 0"T.O. Slab

1A5.0

Sectional Perspective N.T.S. 2

9' - 6"T.O. 1st FF

0 8' 16' Section 1 1/8" = 1'-0" 1

A- 4.0

Page 22: Kenneth L Ferrer Portfolio

20 wall section|27 lower howes road

LineSyncArchitecturewww.LineSync.com

802.464.252614 Castle Hill

Wilmington, VT 05363

DRAWING LISTA0.0 - CoverA2.0 - North/South ElevA2.1 - East/West ElevA3.0 - Basement PlanA3.1 - 1st Floor PlanA3.2 - Loft PlanA4.0 - Section IA4.1 - Section IIA4.2 - Section IIIA5.0 - Foundation DetailA5.1 - Wall/Roof DetailA5.2 - W/R Dormer DetailA5.3 - Garage Door DetailA6.0 - Schedule

Weymouth Residence

27 Lower Howe's Road Wilmington, VT

Project Number

1511

L S A

Revision Date

Aug 18, 2015

Bid Set

Not for construction

Original Submission Date

July 08, 2015

July13, 20151

August 05, 20152

August 18, 20153

0 1' 2' Wall/Roof Dormer Detail 1" = 1'-0"

1

Wall/Roof Dormer Perspective N.T.S 2

4x6 Window Frame

4x10 Rafter 2x6 Tongue & Groove Vmatch

(2) 2x10

(2) 2x6 Plates

Trim

5/8" O.S.B.

4x6

R-30 Min. Cellulose or Mineral Wool Insulationor Spray Foam or SIP

8" RFC

2 Layers R-10 Type 2 EPS

Stucco or STO Synthetic Stucco

Sofit

Flashing

A- 5.2

Page 23: Kenneth L Ferrer Portfolio

2127 lower howes road |footer section

2 Layers R-10 Type 2 EPS

Garage Door

5/4" Cedar Painted

8" RFC

(3) 2x6

2x4

Stucco

2 LineSyncArchitecturewww.LineSync.com

802.464.252614 Castle Hill

Wilmington, VT 05363

DRAWING LISTA0.0 - CoverA2.0 - North/South ElevA2.1 - East/West ElevA3.0 - Basement PlanA3.1 - 1st Floor PlanA3.2 - Loft PlanA4.0 - Section IA4.1 - Section IIA4.2 - Section IIIA5.0 - Foundation DetailA5.1 - Wall/Roof DetailA5.2 - W/R Dormer DetailA5.3 - Garage Door DetailA6.0 - Schedule

Weymouth Residence

27 Lower Howe's Road Wilmington, VT

Project Number

1511

L S A

Revision Date

Aug 18, 2015

Bid Set

Not for construction

Original Submission Date

July 08, 2015

July13, 20151

August 05, 20152

August 18, 20153

A- 5.3

6"

2 Layers R-10 Type 2 EPS

Poly

3/4" Crushed Gravel

Reenforced Concrete Footing

0 1' 2' Garage Door Sill Detail 1" = 1'-0"

1 Garage Door Perspective N.T.S 3

0 1' 2' Garage Door Jamb Detail1" = 1'-0"

2

Garage door

Pressure treated 6x6

2"x2" Angle with Welded #3 bar @ 24" O.C.

6"

Page 24: Kenneth L Ferrer Portfolio

22 site study| gandhi institute greenhouse

overview|

Page 25: Kenneth L Ferrer Portfolio

23gandhi institute greenhouse|trellis design

Page 26: Kenneth L Ferrer Portfolio

24 envelope design|gandhi institute greenhouse

Page 27: Kenneth L Ferrer Portfolio

25gandhi institute greenhouse|interior layout

project websitehttp://www.gandhiinstitute.org/programs/off-the-grid-greenhouse/