Kent Route Director Andrew Munden. November 2008. Agenda. Introduction Network Rail’s Role Network Capacity Network Constraints Timetable Development Process London Bridge Station Station Improvements Questions. Network Rail Does: Operate, maintain, renew and enhance the network - PowerPoint PPT Presentation
Citation preview
Agenda
• Introduction• Network Rail’s Role• Network Capacity• Network Constraints• Timetable Development Process• London Bridge Station• Station Improvements• Questions
Network Rail
Network Rail Does:• Operate, maintain, renew
and enhance the network• Co-ordinate the
production of RUSs• Allocate timetable slots
according to route capacity constraints
• Operate the 18 largest stations on the network
Network Rail Does Not:• Specify train services
including destination, frequency or rolling stock
• Operate train services• Operate stations other
than the 18 largest stations on the network
Timetable Development Process
• DfT specifies the timetable through franchise awarded to the train operator, in Greater London TfL has options to request enhancement to services
• TfL, and other transport bodies and other affected passenger and freight operators are consulted on changes
• TOC submits bids and Network Rail consults on operability of the base timetable with affected parties
• Network Rail undertakes Timetable modelling • TOC publishes the detailed timetable