Section _________ SEGMENTAL RETAINING WALL SUB-SECTION 1 : REINFORCED RETAINING WALL, KEYSTONE SYSTEM PART 1: GENERAL 1.1.01 Description A. Work shall consist of designing, furnishing and build a KEYSTONE Unit Retaining Wall System in accordance with these specifications and in reasonably close conformity with the lines, grades, design, and dimensions shown on the plans. No alternate wall systems will be considered. B. Work includes preparing foundation soil, furnishing and installing leveling pad, unit drainage fill, drains, backfill and geotextile membrane to the lines and grades shown on the construction drawings. C. Work includes furnishing and installing geogrid soil reinforcement of the type, size, location, and lengths designated on the construction drawings. 1.1.02 Related Sections A. Section 02100 - Site Preparation B. Section 02200 - Earthwork 1.1.03 Reference Documents A. American Society for Testing and Materials (ASTM) 1. ASTM C1372-09 Standard Specification for Segmental Retaining Wall Units 2. ASTM D698-07e1 Standard Test Methods for Laboratory Compaction Characteristics of Soil using Standard Effort (600 kN-m/m 3 ) 3. ASTM D4595-09 Standard Test Method for Tensile Properties of Geotextiles by theWide Width Strip Method 4. ASTM D5262-07 Standard Test Method for Evaluating the Unconfined Tension Creep and creep rupture Behavior of Geosynthetics Segmental Retaining Wall Page 1 of 25 Model Specifications_QUÉBEC (May 2010)

Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Embed Size (px)

Citation preview

Page 1: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

SUB-SECTION 1 : REINFORCED RETAINING WALL, KEYSTONE SYSTEM

PART 1: GENERAL

1.1.01 Description

A. Work shall consist of designing, furnishing and build a KEYSTONE Unit Retaining Wall System in accordance with these specifications and in reasonably close conformity with the lines, grades, design, and dimensions shown on the plans. No alternate wall systems will be considered.

B. Work includes preparing foundation soil, furnishing and installing leveling pad, unit drainage fill, drains, backfill and geotextile membrane to the lines and grades shown on the construction drawings.

C. Work includes furnishing and installing geogrid soil reinforcement of the type, size, location, and lengths designated on the construction drawings.

1.1.02 Related Sections

A. Section 02100 - Site Preparation

B. Section 02200 - Earthwork

1.1.03 Reference Documents

A. American Society for Testing and Materials (ASTM)

1. ASTM C1372-09 Standard Specification for Segmental Retaining Wall Units2. ASTM D698-07e1 Standard Test Methods for Laboratory Compaction

Characteristics of Soil using Standard Effort (600 kN-m/m3)3. ASTM D4595-09 Standard Test Method for Tensile Properties of Geotextiles by

theWide Width Strip Method4. ASTM D5262-07 Standard Test Method for Evaluating the Unconfined Tension

Creep and creep rupture Behavior of Geosynthetics5. ASTM D4475-02 (2008) Standard Test Method for Apparent Horizontal Shear Strength

of Pultruded Reinforced Plastic Rods by the Short Beam Method

6. ASTM D6706-01 (2007) Standard Test Method for Measuring Geosynthetic Pullout Resistance in soil

7. ASTM D4101-09 Standard Specification for Polypropylene Injection and Extrusion Materials

8. ASTM D4318-05 Liquid Limit, Plastic Limit and Plasticity Index of Soils9. ASTM C881/C1881M-02 Standard Specification for Epoxy-Resin-Base Bonding Systems

for Concrete

B. Geosynthetic Research Institute (GRI)1. GRI-GG4(a) Determination of Long Term Design Strength of Stiff Geogrids2. GRI-GG4(b) Determination of Long Term Design Strength of Flexible

Geogrids

Segmental Retaining Wall Page 1 of 19Model Specifications_QUÉBEC (May 2010)

Page 2: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

C. National Concrete Masonry Association (NCMA)1. NCMA SRWU-1 Test Method for Determining Connection Strength of SRW2. NCMA SRWU-2 Test Method for Determining Shear Strength of SRW

D. Canadian General Standards Board1. CAN/CGSB-8.2-[M88] Sieves, Testing, Woven Wire, Metric

E. Canadian Standards Association1. CAN/CSA-A23.1-09 Concrete Materials and Methods of Concrete Construction

F. Canadian Highway Bridge Design Code1. CAN/CSA-S6-06 Chapter 6 - Foundations

G. Bureau de Normalisation du Québec1. NQ 2560-114 Travaux de génie civil – granulats2. BNQ 3264-115-[2002] Tuyaux et raccords en polyéthylène (PE) - Tuyaux annelés

flexibles pour le drainage - Caractéristiques et méthodes d'essais

H. Cahier de Charges et Devis Généraux (CCDG) 2010

I. Normes Du Ministère du Transport du Québec (MTQ)1. Tome VII Matériaux

J. American Association of State Highway and Transportation Offices (AASHTO)1. AASHTO T236-08-UL Direct Shear Test of Soils under Consolidated Drained

Conditions2. AASHTO-AGC-ARTBA Joint Committee « In Situ Soil Improvement Techniques », Task

Force 27 Report, August 1990

1.1.04 Submittals/Certification

A. Contractor shall submit a Manufacturer's certification, prior to start of work, that the retaining wall system components meet the requirements of this specification and the structure design.

B. Contractor shall submit construction drawings and design calculations for the retaining wall system prepared and stamped by a Professional Engineer registered in the province of the project. The engineering designs, techniques, and material evaluations shall be in accordance with the specification and the Keystone Design Manual. Refer to CCDG 2010, sections 15.12.1 and 15.12.2

1.1.05 Quality Assurance

A. Contractor shall submit a list of five (5) previously constructed projects of similar size and magnitude by the wall installer where the specific retaining wall system has been constructed successfully. Contact names and telephone numbers shall be listed for each project.

B. Contractor shall provide evidence that the design engineer has a minimum of five years of documental experience in the design for reinforced soil structures. The design engineer shall provide proof of current professional liability insurance with an aggregate coverage limit of not less than 2,000,000$.

Segmental Retaining Wall Page 2 of 19Model Specifications_QUÉBEC (May 2010)

Page 3: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

C. Owner shall provide soil testing and quality assurance inspection during earthwork and wall construction operations. Contractor shall provide any quality control testing or inspection not provided by the Owner. Owner's quality assurance program does not relieve the contractor of responsibility for quality control and wall performance.

D. Refer to CCDG 2010, sections 15.12.4.

1.1.06 Delivery, Storage and Handling

A. Contractor shall check all materials upon delivery to assure that the proper type, grade, color, and certification have been received.

B. Contractor shall protect all materials from damage due to jobsite conditions and in accordance with manufacturer's recommendations. Damaged materials shall not be incorporated into the work.

C. During delivery and storage, contractor shall protect geogrids from direct sunlight, ultraviolet rays, excessive heat, mud, dirt, dust, debris and rodents.

D. Contractor shall store polymer geogrids at temperature above minus 25°C.

E. Contractor shall prevent chipping and cracking of precast concrete facing panels and damage to embedded connectors for reinforcing elements. Replace damaged panels as directed by Engineer.

F. Contractor shall prevent staining or other defacement of front surfaces of facing panels during storage and handling. Repair or replace as directed by Engineer.

Segmental Retaining Wall Page 3 of 19Model Specifications_QUÉBEC (May 2010)

Page 4: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

PART 2: MATERIALS

1.2.01 Definitions

A. Keystone Unit - a concrete retaining wall element machine made from Portland cement, water, and aggregates.

B. Structural Geogrid - a structural element formed by a regular network of integrally connected tensile elements with apertures of sufficient size to allow interlocking with surrounding soil, rock, or earth and function primarily as reinforcement.

C. Drainage Fill - drainage aggregate that is placed within and immediately behind the Keystone concrete units.

D. Reinforced Backfill - compacted soil that is placed within the reinforced soil volume as outlined on the plans.

E. Refer to CCDG 2010, sections 15.12.3 and 15.12.4.

1.2.02 Keystone Concrete Retaining Wall Units

A. Keystone concrete units shall conform to the following architectural requirements:

1. Face color : the Owner may specify standard manufacturers’ color.2. Face finish : split straight face or split rounded face.3. Bond configuration - running with bonds nominally located at midpoint of vertically

adjacent units, in both straight and curved alignments.4. Exposed surfaces of units shall be free of chips, cracks or other imperfections when

viewed from a distance of 10 feet (3 m) under diffused lighting.

B. Keystone concrete materials shall conform to the requirements of ASTM C1372 - Standard Specifications for Segmental Retaining Wall Units.

C. Keystone concrete units shall conform to the following structural and geometric requirements measured in accordance with appropriate references:

1. Compressive strength: 5000 psi (35 MPa);2. Durability : loss 0.6 kg/m2 , after 49 freeze-thaw cycles; 3. Absorption: 8 % (6% in northern climate) for standard weight aggregates;4. Dimensional tolerances: ± 3 mm from nominal unit dimensions not including rough split

face, ±1.5 mm unit height - top and bottom planes;5. Unit size in millimeter : 203 (H) x 457 (W) x 304 (D);6. Wall angle in degree : 0° or 9°;7. Maximum height of segmental retaining wall : 0,9 m without geogrids and 10 m with

geogrids;8. Unit weight: 40 kg/unit minimum for standard weight aggregates;

Segmental Retaining Wall Page 4 of 19Model Specifications_QUÉBEC (May 2010)

Page 5: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

9. Inter-unit shear strength: 8 kN/m minimum at 13 kPa normal pressure;10. Geogrid/unit peak connection strength: 7 kN/m minimum at 13 kPa normal force.

D. Keystone concrete units shall conform to the following constructability requirements:1. Vertical setback: 3 mm ± per course (near vertical) or 25 mm ± per course per the

design;2. Alignment and grid positioning mechanism - fiberglass pins, two per unit minimum;3. Maximum horizontal gap between erected units shall be 13 mm.

1.2.03 Shear Connectors

A. Shear connectors shall be 12 mm diameter thermoset isopthalic polyester resin-pultruded fiberglass reinforcement rods to provide connection between vertically and horizontally adjacent units. Strength of shear connectors between vertical adjacent units shall be applicable over a design temperature of -10 to 40 degrees C.

B. Shear connectors shall be capable of holding the geogrid in the proper design position during grid pre-tensioning and backfilling.

1.2.04 Base Leveling Pad Material

A. Base leveling pad shall be composed of type MG 56 granular material conforming to NQ 2560-114.

1.2.05 Unit Drainage Fill

A. Unit drainage fill shall be composed of type BC 5-20 granular material conforming to NQ 2560-114.

1.2.06 Reinforced Backfill

A. Reinforced backfill shall be composed of conform aggregate and be free of debris. Refer to CCDG 2010, section 15.12.3.1 for particle size analysis.

B. The maximum aggregate size shall be limited to 19 mm unless field tests have been performed to

evaluate potential strength reductions to the geogrid design due to damage during construction.

C. Material can be site-excavated soils where the above requirements can be met. Unsuitable soils for backfill (high plastic clays or organic soils) shall not be used in the backfill or in the reinforced soil mass.

D. Contractor shall submit reinforced fill sample and laboratory test results to the Architect/Engineer for approval prior to the use of any proposed reinforced fill material.

Segmental Retaining Wall Page 5 of 19Model Specifications_QUÉBEC (May 2010)

Page 6: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

1.2.07 Geogrid Soil Reinforcement

A. The geogrids shall conform to the requirements of Task Force 27 Report AASHTO-AGC-ARTBA Joint Committee, August 1990, in the chapter entitled « Design Guidelines for Use of Extensible Reinforcements (Geosynthetic) for Mechanically Stabilized Earth Walls in Permanent Application ». Also refer to CCDG 2010 Section 15.12.3 and 15.12.4.

B. Geosynthetic reinforcement shall consist of geogrids manufactured specifically for soil reinforcement applications and shall be manufactured from high tenacity polyester yarn or high density polyethylene. Polyester geogrid shall be knitted from high tenacity polyester filament yarn with a molecular weight exceeding 25,000 g/m and a carboxyl end group values less than 30. Polyester geogrid shall be coated with an impregnated PVC coating that resists peeling, cracking, and stripping.

C. Ta, Long Term Allowable Tensile Design Load, of the geogrid material shall be determined as follows:

Ta = Tult / (RFcr*RFd*RFid)Ta shall be evaluated based on a 75-year design life.

1. Tult, Short Term Ultimate Tensile StrengthTult is based on the minimum average roll values (MARV)

2. RFcr, Reduction Factor for Long Term Tension CreepRFcr shall be determined from 10,000-hour creep testing performed in accordance with ASTM D5262. Reduction value = 1.50 minimum.

3. RFd, Reduction Factor for DurabilityRFd shall be determined from polymer specific durability testing covering the range of expected soil environments. RFd = 1.10 minimum.

4. RFid, Reduction Factor for Installation DamageRFid shall be determined from product specific construction damage testing performed in accordance with GRI-GG4(a) or (b). Test results shall be provided for each product to be used with project specific or more severe soil type. RFid = 1.05 minimum.

D. Soil Interaction Coefficient, Ci :Ci values shall be determined per GRI-CG4 at a maximum 19 mm displacement.

E. Manufacturing Quality ControlThe geogrid manufacturer shall have a manufacturing quality control program that includes QC testing by an independent laboratory.The QC testing shall include:

Tensile Strength TestingMelt Flow Index (HDPE)

Molecular Weight (Polyester)

1.2.08 Drainage Pipe

Segmental Retaining Wall Page 6 of 19Model Specifications_QUÉBEC (May 2010)

Page 7: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

A. The drainage pipe shall be a perforated PVC pipe with fittings, manufactured in accordance with BNQ 3264-115-[2002]. Nominal pipe sizes in accordance with contract drawings.

Segmental Retaining Wall Page 7 of 19Model Specifications_QUÉBEC (May 2010)

Page 8: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

PART 3: EXECUTION

1.3.01 Reference

Refer to CCDG 2010, section 15.12.5.

1.3.02 Excavation

A. Contractor shall excavate to the lines and grades shown on the construction drawings. Owner's representative shall inspect the excavation and approve prior to placement of leveling material or fill soils. Proof roll foundation area as directed to determine if remedial work is required.

B. Over-excavation and replacement of unsuitable foundation soils and replacement with approved compacted fill will be compensated as agreed upon with the Owner.

C. Refer to CCDG 2010, section 11.

1.3.03 Base Leveling Pad

A. A base leveling pad with a minimum thickness of 300 mm must be installed to grade shown on plans prior to placing first row of concrete blocs. Leveling pad shall be compacted in 150 mm lifts to 95% of the maximum density as determined by ASTM D698.

B. The base leveling pad shall extend a minimum of 150 mm in front and behind the Keystone retaining wall.

C. Leveling pad shall be prepared to insure full contact to the base surface of the concrete units.

1.3.04 Keystone Unit Installation

A. Arrange for technical representative of supplier of wall system to be on site for initial stage of wall construction to ensure correct installation procedures. Arrange for subsequent visits as directed by Engineer.

B. First course of units shall be placed on the leveling pad at the appropriate line and grade. Alignment and level shall be checked in all directions and insure that all units are in full contact with the base and properly seated.

C. Place the front of units side-by-side. Do not leave gaps between adjacent units. Layout of corners and curves shall be in accordance with manufacturer's recommendations.

D. Install shear/connecting devices per manufacturer's recommendations.

E. Place drainage fill within and behind wall units. Place and compact backfill soil (reinforced fill) behind drainage fill. Follow wall erection and drainage fill closely with structure backfill. Drainage fill and backfill soil shall be separated by a geotextile fabric.

Segmental Retaining Wall Page 8 of 19Model Specifications_QUÉBEC (May 2010)

Page 9: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

F. Contractor shall install permeable joint fillers, geotextile filters, and other means, as indicated by wall system supplier, to prevent washing of backfill particles through joints.

G. Maximum stacked vertical height of wall units, prior to unit drainage fill and backfill placement and compaction, shall not exceed two courses.

1.3.05 Structural Geogrid Installation

A. Geogrid shall be oriented with the highest strength axis perpendicular to the wall alignment.

B. Geogrid reinforcement shall be placed at the strengths, lengths, and elevations shown on the construction design drawings or as directed by the Engineer.

C. The geogrid shall be laid horizontally on compacted backfill and attached to the Keystone wall units. Place the next course of concrete units over the geogrid. The geogrid shall be pulled taut, and anchored prior to backfill placement on the geogrid. Contractor shall inform engineer of intended geogrid pre-tensioning method.

D. Geogrid reinforcements shall be continuous throughout their embedment lengths and placed side-by-side to provide 100% coverage at each level. Contractor shall overlap each successive strip of geogrid 600 mm over previously laid strip. Spliced connections between shorter pieces of geogrid or gaps between adjacent pieces of geogrid are not permitted.

1.3.06 Reinforced Backfill Placement

A. Reinforced backfill shall be placed, spread, and compacted in such a manner that minimizes the development of slack in the geogrid and installation damage.

B. Frozen materials shall not be incorporated into the work. Material shall not be placed over frozen ground, ice, or snow.

C. The minimum width of backfill shall be equal to the length of the geogrid plus an additional 300mm.

D. Backfill material shall not be pushed parallel to geogrids towards retaining wall.

E. Reinforced backfill shall be placed and compacted in lifts not to exceed 150 mm where hand compaction is used, or 200 to 250 mm where heavy compaction equipment is used. Lift thickness shall be decreased to achieve the required density as required.

F. Reinforced backfill shall be compacted to 95% of the maximum density as determined by ASTM D698. The moisture content of the backfill material prior to and during compaction shall be uniformly distributed throughout each layer and shall be dry of optimum, + 0%, - 3%.

Segmental Retaining Wall Page 9 of 19Model Specifications_QUÉBEC (May 2010)

Page 10: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

G. Only lightweight equipment, such as dynamic compactors, vibrating plate compactors and vibrating rollers with maximum weight per roller meter of 800 kg, shall be allowed within 1.5 m from the tail of the Keystone concrete unit.

H. Construction equipment shall not be operated directly upon the geogrid reinforcement. Place backfill so as not to displace or buckle reinforcing elements. Avoid sudden braking and sharp turning of tracked and rubber-tired equipment on backfill. Place backfill in direction away from facing panels. Before operating vehicles over geogrid area, place minimum fill thickness of 200mm above any level of polymer geogrid reinforcing.

I. At the end of each day's operation, the Contractor shall slope the last lift of reinforced backfill away from the wall units to direct runoff away from wall face. The Contractor shall not allow surface runoff from adjacent areas to enter the wall construction site.

1.3.07 Cap Installation

A. Cap units shall be glued to underlying units with an all-weather adhesive recommended by the manufacturer and conforming to the requirements of ASTM C881.

1.3.08 As-built Construction Tolerances

A. The wall facing shall be uniform without asperity and bulging.

B. Vertical alignment: ± 15 mm over any 3 m distance.

C. Wall Batter: within 2 degrees of design batter.

D. Horizontal alignment: ± 15 mm over any 3 m distance.

E. Corners, bends & curves: ± 300 mm to theoretical location.

F. Maximum horizontal gap between erected units shall be 13 mm.

1.3.09 Field Quality Control

A. Quality Assurance - The Owner may engage inspection and testing services, including independent laboratories, to provide quality assurance and testing services during construction. This does not relieve the Contractor from securing the necessary construction quality control testing.

B. Quality Assurance should include foundation soil inspection. Verification of geotechnical design parameters, and verification that the contractor’s quality control testing is adequate as a minimum. Quality assurance shall also include observation of construction for general compliance with design drawings and project specifications. (Quality Assurance is usually best performed by the site geotechnical engineer.)

C. Quality Control – The Contractor shall engage inspection and testing services to perform the minimum quality control testing described in the retaining wall design plans and specifications. Only qualified and experienced technicians and engineers shall perform testing and inspection services.

Segmental Retaining Wall Page 10 of 19Model Specifications_QUÉBEC (May 2010)

Page 11: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

D. Quality Control testing shall include soil and backfill testing to verify soil types and compaction and verification that the retaining wall is being constructed in accordance with the design plans and project specifications.

E. Refer to CCDG 2010, section 15.12.4.

Segmental Retaining Wall Page 11 of 19Model Specifications_QUÉBEC (May 2010)

Page 12: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

SUB-SECTION 2, GRAVITY WALL: CELTIK / LAFAYETTE / GRANDE

PART 1: GENERAL

2.1.01 Description

A. Work shall consist of designing, furnishing and build a CELTIK or LAFAYETTE or GRANDE Unit Retaining Wall System in accordance with these specifications and in reasonably close conformity with the lines, grades, design, and dimensions shown on the plans. No alternate wall systems will be considered.

B. Work includes preparing foundation soil, furnishing and installing leveling pad, unit drainage fill, drains, backfill and geotextile membrane to the lines and grades shown on the construction drawings.

2.1.02 Related Sections

A. Section 02100 - Site Preparation

B. Section 02200 - Earthwork

2.1.03 Reference Documents

A. American Society for Testing and Materials (ASTM)

1. ASTM C1372-09 Standard Specification for Segmental Retaining Wall Units2. ASTM D698-07e1 Standard Test Methods for Laboratory Compaction

Characteristics of Soil using Standard Effort (600 kN-m/m3)3. ASTM D4595-09 Standard Test Method for Tensile Properties of Geotextiles by

theWide Width Strip Method

4. ASTM D4475-02 (2008) Standard Test Method for Apparent Horizontal Shear Strength of Pultruded Reinforced Plastic Rods by the Short Beam Method

5. ASTM D4101-09 Standard Specification for Polypropylene Injection and Extrusion Materials

6. ASTM D4318-05 Liquid Limit, Plastic Limit and Plasticity Index of Soils7. ASTM C881/C1881M-02 Standard Specification for Epoxy-Resin-Base Bonding Systems

for Concrete

B. National Concrete Masonry Association (NCMA)1. NCMA SRWU-1 Test Method for Determining Connection Strength of SRW2. NCMA SRWU-2 Test Method for Determining Shear Strength of SRW

C. Canadian General Standards Board1. CAN/CGSB-8.2-[M88] Sieves, Testing, Woven Wire, Metric

D. Canadian Standards Association1. CAN/CSA-A23.1-09 Concrete Materials and Methods of Concrete Construction

Segmental Retaining Wall Page 12 of 19Model Specifications_QUÉBEC (May 2010)

Page 13: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

E. Canadian Highway Bridge Design Code1. CAN/CSA-S6-06 Chapter 6 - Foundations

F. Bureau de Normalisation du Québec1. NQ 2560-114 Travaux de génie civil – granulats2. BNQ 3264-115-[2002] Tuyaux et raccords en polyéthylène (PE) - Tuyaux annelés

flexibles pour le drainage - Caractéristiques et méthodes d'essais

G. Cahier de Charges et Devis Généraux (CCDG) 2010

H. Normes Du Ministère du Transport du Québec (MTQ)1. Tome VII Matériaux

I. American Association of State Highway and Transportation Offices (AASHTO)1. AASHTO T236-08-UL Direct Shear Test of Soils under Consolidated Drained

Conditions2. AASHTO-AGC-ARTBA Joint Committee « In Situ Soil Improvement Techniques », Task

Force 27 Report, August 1990

2.1.04 Submittals/Certification

A. Contractor shall submit a Manufacturer's certification, prior to start of work, that the retaining wall system components meet the requirements of this specification and the structure design.

B. Contractor shall submit construction drawings and design calculations for the retaining wall system prepared and stamped by a Professional Engineer registered in the province of the project. Refer to CCDG 2010, sections 15.12.1 and 15.12.2

2.1.05 Quality Assurance

A. Contractor shall submit a list of five (5) previously constructed projects of similar size and magnitude by the wall installer where the specific retaining wall system has been constructed successfully. Contact names and telephone numbers shall be listed for each project.

B. Contractor shall provide evidence that the design engineer has a minimum of five years of documental experience in the design for reinforced soil structures. The design engineer shall provide proof of current professional liability insurance with an aggregate coverage limit of not less than 2,000,000$.

C. Owner shall provide soil testing and quality assurance inspection during earthwork and wall construction operations. Contractor shall provide any quality control testing or inspection not provided by the Owner. Owner's quality assurance program does not relieve the contractor of responsibility for quality control and wall performance.

D. Refer to CCDG 2010, sections 15.12.4.

Segmental Retaining Wall Page 13 of 19Model Specifications_QUÉBEC (May 2010)

Page 14: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

2.1.06 Delivery, Storage and Handling

A. Contractor shall check all materials upon delivery to assure that the proper type, grade, color, and certification have been received.

B. Contractor shall protect all materials from damage due to jobsite conditions and in accordance with manufacturer's recommendations. Damaged materials shall not be incorporated into the work.

C. Contractor shall prevent chipping and cracking of precast concrete facing panels and damage to embedded connectors for reinforcing elements. Replace damaged panels as directed by Engineer.

D. Contractor shall prevent staining or other defacement of front surfaces of facing panels during storage and handling. Repair or replace as directed by Engineer.

Segmental Retaining Wall Page 14 of 19Model Specifications_QUÉBEC (May 2010)

Page 15: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

PART 2: MATERIALS

2.2.01 Definitions

A. Celtik / Lafayette / Grande Unit - a concrete retaining wall element machine made from Portland cement, water, and aggregates.

B. Drainage Fill - drainage aggregate that is placed within and immediately behind the Celtik / Lafayette / Grande concrete units.

C. Refer to CCDG 2010, sections 15.12.3 and 15.12.4.

2.2.02 Celtik / Lafayette / Grande Concrete Retaining Wall Units

A. Celtik / Lafayette / Grande concrete units shall conform to the following architectural requirements:

1. Face colour : the Owner may specify standard manufacturers’ colour.2. Face finish :

i. Celtik : straight face with antique finish ;ii. Lafayette : texturized straight face ;iii. Grande : split straight face ;

3. Bond configuration - running with bonds nominally located at midpoint of vertically adjacent units, in both straight and curved alignments.

4. Exposed surfaces of units shall be free of chips, cracks or other imperfections when viewed from a distance of 10 feet (3 m) under diffused lighting.

B. Celtik / Lafayette / Grande concrete materials shall conform to the requirements of ASTM C1372 - Standard Specifications for Segmental Retaining Wall Units.

C. Celtik / Lafayette / Grande concrete units shall conform to the following structural and geometric requirements measured in accordance with appropriate references:

1. Compressive strength: 4300 psi (30 MPa);2. Durability : loss 0.6kg/m2 , after 49 freeze-thaw cycles; 3. Absorption: 8 % (6% in northern climate) for standard weight aggregates;4. Dimensional tolerances: ± 3 mm from nominal unit dimensions not including rough split

face, ±1.5 mm unit height - top and bottom planes;5. Unit size in millimeter :

i. Celtik : 90 (H) x variable (L) x 225 (D) or 135 (H) x variable (L) x 225 (D) or 225 (H) x variable (L) x 225 (D);

ii. Lafayette : 152 (H) x 406 (L) x 203 (D) or 152 (H) x 203 (L) x 203 (D) or 76 (H) x 406 (L) x 203 (D) or 76 (H) x 203 (L) x 203 (D);

iii. Grande : 200 (H) x 1000 (L) x 375 (D) or200 (H) x 1000 (L) x 750 (D) or

Segmental Retaining Wall Page 15 of 19Model Specifications_QUÉBEC (May 2010)

Page 16: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

200 (H) x 1000 (L) x 1125 (D);6. Wall angle in degree :

i. Celtik : 0° or 9°;ii. Lafayette : 10°;iii. Grande : 0°, 9° or 17°;

7. Maximum height of segmental retaining wall :i. Celtik : angle wall 1,1 m or vertical wall 0,67 m;ii. Lafayette : 0,9 m;iii. Grande : 3,2 m;

8. Unit weight: variable according to block’s size;

2.2.03 Base Leveling Pad Material

A. Base leveling pad shall be composed of type MG 56 granular material conforming to NQ 2560-114.

2.2.04 Unit Drainage Fill

A. Unit drainage fill shall be composed of type BC 5-20 granular material conforming to NQ 2560-114.

2.2.05 Drainage Pipe

A. The drainage pipe shall be a perforated PVC pipe with fittings, manufactured in accordance with BNQ 3264-115-[2002]. Nominal pipe sizes in accordance with contract drawings.

Segmental Retaining Wall Page 16 of 19Model Specifications_QUÉBEC (May 2010)

Page 17: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

PART 3: EXECUTION

2.3.01 Reference

Refer to CCDG 2010, section 15.12.5.

2.3.02 Excavation

A. Contractor shall excavate to the lines and grades shown on the construction drawings. Owner's representative shall inspect the excavation and approve prior to placement of leveling material or fill soils. Proof roll foundation area as directed to determine if remedial work is required.

B. Over-excavation and replacement of unsuitable foundation soils and replacement with approved compacted fill will be compensated as agreed upon with the Owner.

C. Refer to CCDG 2010, section 11.

2.3.03 Base Leveling Pad

A. A base leveling pad with a minimum thickness of 300 mm must be installed to grade shown on plans prior to placing first row of concrete blocs. Leveling pad shall be compacted in 150 mm lifts to 95% of the maximum density as determined by ASTM D698.

B. The base levelling pad shall extend a minimum of 150 mm in front and behind the Celtik / Lafayette / Grande retaining wall.

C. Leveling pad shall be prepared to insure full contact to the base surface of the concrete units.

2.3.04 Celtik / Lafayette / Grande Unit Installation

A. Arrange for technical representative of supplier of wall system to be on site for initial stage of wall construction to ensure correct installation procedures. Arrange for subsequent visits as directed by Engineer.

B. First course of units shall be placed on the leveling pad at the appropriate line and grade. Alignment and level shall be checked in all directions and insure that all units are in full contact with the base and properly seated.

C. Place the front of units side-by-side. Do not leave gaps between adjacent units. Layout of corners and curves shall be in accordance with manufacturer's recommendations.

D. Install shear/connecting devices per manufacturer's recommendations.

E. Place drainage fill within and behind wall units. Drainage fill and backfill soil shall be separated by a geotextile fabric.

Segmental Retaining Wall Page 17 of 19Model Specifications_QUÉBEC (May 2010)

Page 18: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

F. Contractor shall install permeable joint fillers, geotextile filters, and other means, as indicated by wall system supplier, to prevent washing of backfill particles through joints.

G. Maximum stacked vertical height of wall units, prior to unit drainage fill and compaction, shall not exceed two courses.

2.3.05 Backfill Placement

A. Frozen materials shall not be incorporated into the work. Material shall not be placed over frozen ground, ice, or snow.

B. Backfill shall be placed and compacted in lifts not to exceed 150 mm where hand compaction is used, or 200 to 250 mm where heavy compaction equipment is used. Lift thickness shall be decreased to achieve the required density as required.

C. Backfill shall be compacted to 95% of the maximum density as determined by ASTM D698. The moisture content of the backfill material prior to and during compaction shall be uniformly distributed throughout each layer and shall be dry of optimum, + 0%, - 3%.

D. Only lightweight equipment, such as dynamic compactors, vibrating plate compactors and vibrating rollers with maximum weight per roller meter of 800 kg, shall be allowed within 1.5 m from the tail of the concrete unit.

E. At the end of each day's operation, the Contractor shall slope the last lift of backfill away from the wall units to direct runoff away from wall face. The Contractor shall not allow surface runoff from adjacent areas to enter the wall construction site.

2.3.06 Cap Installation

A. Cap units shall be glued to underlying units with an all-weather adhesive recommended by the manufacturer and conforming to the requirements of ASTM C881.

2.3.07 As-built Construction Tolerances

A. The wall facing shall be uniform without asperity and bulging.

B. Vertical alignment: ± 15 mm over any 3 m distance.

C. Wall Batter: within 2 degrees of design batter.

D. Horizontal alignment: ± 15 mm over any 3 m distance.

E. Corners, bends & curves: ± 300 mm to theoretical location.

F. Maximum horizontal gap between erected units shall be 13 mm.

Segmental Retaining Wall Page 18 of 19Model Specifications_QUÉBEC (May 2010)

Page 19: Keystone Compac.WORD - Permacon: Pavés, … · Web viewASTM C1372-09 Standard Specification for Segmental Retaining Wall Units ASTM D698-07e1 Standard Test Methods for Laboratory

Section _________

SEGMENTAL RETAINING WALL

2.3.08 Field Quality Control

A. Quality Assurance - The Owner may engage inspection and testing services, including independent laboratories, to provide quality assurance and testing services during construction. This does not relieve the Contractor from securing the necessary construction quality control testing.

B. Quality Assurance should include foundation soil inspection. Verification of geotechnical design parameters, and verification that the contractor’s quality control testing is adequate as a minimum. Quality assurance shall also include observation of construction for general compliance with design drawings and project specifications. (Quality Assurance is usually best performed by the site geotechnical engineer.)

C. Quality Control – The Contractor shall engage inspection and testing services to perform the minimum quality control testing described in the retaining wall design plans and specifications. Only qualified and experienced technicians and engineers shall perform testing and inspection services.

D. Quality Control testing shall include soil and backfill testing to verify soil types and compaction and verification that the retaining wall is being constructed in accordance with the design plans and project specifications.

E. Refer to CCDG 2010, section 15.12.4.

Segmental Retaining Wall Page 19 of 19Model Specifications_QUÉBEC (May 2010)