KFUPMKFUPM Computer Equipment Supply Computer Equipment Supply Framework GuidelinesFramework Guidelines
Information Technology Centre (ITC)Information Technology Centre (ITC)
IntroductionIntroduction Hardware SpecificationsHardware Specifications Ordering/Delivery ScheduleOrdering/Delivery Schedule Estimated Hardware QuantitiesEstimated Hardware Quantities Framework DetailsFramework Details
Computer Equipment Supply Framework Computer Equipment Supply Framework
Historical PerspectiveHistorical Perspective Dated SpecificationsDated Specifications Contractual IssuesContractual Issues Delivery ProblemsDelivery Problems
Frame AgreementsFrame Agreements Legal/Governmental RequirementsLegal/Governmental Requirements Case StudiesCase Studies
• Saudi Aramco, SABIC, STC etcSaudi Aramco, SABIC, STC etc
Introduction Introduction
Equipment Supply AccountEquipment Supply Account Short listed ManufacturersShort listed Manufacturers
• HP/Compaq, Dell, IBM and Fujitsu SiemensHP/Compaq, Dell, IBM and Fujitsu Siemens• Notebooks, Desktop Computers, AccessoriesNotebooks, Desktop Computers, Accessories
Established University Procurement ProceduresEstablished University Procurement Procedures Warranty and Technical SupportWarranty and Technical Support
DurationDuration Current Supply Account for the Year 2005 Current Supply Account for the Year 2005 Annual ReviewAnnual Review
• Regular Bidding Process in September every yearRegular Bidding Process in September every year• January – September Delivery ScheduleJanuary – September Delivery Schedule
Introduction Introduction ..contd..contd
Standard desktop model with Intel® Pentium® 4 processor 3.6 GHz or higher with Hyper Threading Technology (90 or 65 nm architecture), 800MHz FSB, 1 MB L2 Cache, 512MB RAM, 80GB Serial ATA hard drive, DVD/CD-RW, 64MB Video adapter, Fast Ethernet adapter, sound adapter with speakers
Desktop/Pentium 4 Processor 3.6GHz or latest
3
Standard desktop with Intel Pentium 4 processor 3.4 GHz with Hyper Threading Technology (90nm architecture), 800MHz FSB, 1 MB L2 Cache, 512MB RAM, 80GB Serial ATA hard drive, latest DVD/CD-RW, 64MB Video adapter, Fast Ethernet adapter, sound adapter with speakers
Desktop/Pentium 4 Processor 3.4GHz
2
Standard desktop with Intel Pentium 4 processor 3.2 GHz with Hyper Threading Technology (90nm architecture), 800MHz FSB, 1 MB L2 Cache, 512MB RAM, 80GB ATA hard drive, latest DVD/CD-RW, 64MB Video adapter, Fast Ethernet adapter, sound adapter with speakers
Desktop/Pentium 4 Processor 3.2GHz
1
DetailsModelBatch
Proposed Computer Hardware - Desktop Computers
DetailsModelBatch
Standard notebook with Intel Pentium M processor 2.0 Ghz, Centrino Technology (90nm architecture), 400MHz FSB, 2 MB L2 Cache, 512MB RAM, 80GB hard drive, 15” TFT Active-Matrix, LCD, latest DVD Writer, 64MB Video adapter, integrated wireless, Fast Ethernet and Modem adapter, Firewire/USB2, sound adapter with built-in speakers
Notebook/ Centrino Pentium M Processor 2.0 GHz or Latest
3
Standard notebook with Intel Pentium M processor 1.8 Ghz, Centrino Technology (90nm architecture), 400MHz FSB, 2 MB L2 Cache, 512MB RAM, 80GB hard drive, 15” TFT Active-Matrix LCD, latest DVD/CD-RW, 64MB Video adapter, integrated wireless, Fast Ethernet and Modem adapter, Firewire/USB2, sound adapter with built-in speakers
Notebook/ Centrino Pentium M Processor 1.8 GHz
2
Standard notebook with Intel Pentium M processor 1.8Ghz, Centrino Technology (90nm architecture), 400MHz FSB, 1 MB L2 Cache, 512MB RAM, 80GB hard drive, 15” TFT Active-Matrix LCD, latest DVD/CD-RW, 64MB Video adapter, integrated wireless, Fast Ethernet and Modem adapter, Firewire/USB2, sound adapter with built-in speakers
Notebook/Centrino Pentium M Processor 1.8.Ghz
1
Proposed Computer Hardware - Proposed Computer Hardware - NotebooksNotebooks
1 GB memory module for the NotebookNotebook Memory
80GB internal Serial ATA hard disk for the desktop 17” high-performance LCD monitor 1280 x 1024, Contrast ratio 500:1, Dot Pitch 0.264mm, brightness 250 CD/m2 (Analog/Digital)
Desktop Hard Disk17” LCD Monitors (D)
80GB internal Serial ATA hard disk for the desktop 17” high-performance LCD monitor 1280 x 1024, Contrast ratio 500:1, Dot Pitch 0.264mm, brightness 250 CD/m2 (Analog/Digital)
Desktop Hard Disk17” LCD Monitors (D)
1 GB memory module for the desktopDesktop Memory
Full-featured Docking Station compatible with the Notebook quoted. The station must have pass-through connection for Fast Ethernet, USB 2.0, and Video/DVI, as well as standard notebook ports. A separate power adapter for the docking station must be supplied if required
Notebook Docking Station
17” Flat CRT Monitor with 0.25 mm dot pitch 17” CRT Monitor
17” high-performance LCD monitor 1280 x 1024, Contrast ratio 500:1, Dot Pitch 0.264mm, brightness 250 CD/m2 (Analog)
17” LCD Monitors (A)
DetailsModel
Proposed Computer Hardware - AccessoriesProposed Computer Hardware - Accessories
128 MB AGP Video Adapter 8X 128 MB Video AdapterLatest DVD WriterInternal DVD Writer
40GB USB 2.0 Storage DriveUSB Storage
256 MB USB 2.0 Flash Memory unitUSB Flash Memory 256256MB USB 2.0 Flash Memory unit
512MB USB 2.0 Flash Memory unitUSB Flash Memory 512
Personal Laser Printer (HP 1320N or printer with equivalent specs) – Standard 16MB memory
Printer – Type 4
Workgroup Laser Printer (HP 2420N or printer with equivalent specs) – Standard 64MB memory
Printer – Type 3
Business/WorkGroup Laser Printer (HP 4350DTN or printer with equivalent specs) – 128MB memory
Printer – Type 2b
Business/WorkGroup Laser Printer (HP 4250N or printer with equivalent specs) – 128MB memory
Printer – Type 2a
Heavy-Duty Laser Printer (HP 9050 or printer with equivalent specs – specify detailed specs)
Printer – Type 1
18” high-performance LCD monitor 1280 x 1024, Contrast ratio 500:1, Dot Pitch 0.264mm, brightness 250 CD/m2 (Analog/Digital)
18” LCD Monitors
Proposed Computer Hardware - AccessoriesProposed Computer Hardware - Accessories
Ordering/Delivery Schedule
The delivery of hardware is categorized in batches Approximately 1000 to 1200 desktops/notebooks are
planned in 2005 The above-mentioned delivery schedule is a general
guideline for delivery and not an exact schedule.
200 – 300 September 15 August 15 4-a
100 – 200 October 15 September 15 4-b
200 – 300 August 15 July 15 3-b
100 – 200 July 15 June 15 3-a
300- 400May 15April 152
300 – 400 April 15 March 151
Quantity
(Min – Max) Delivery ByOrderBatch
Estimated Hardware QuantitiesEstimated Hardware QuantitiesThe table below is a general outline of the estimated deliveries that will be spread over the schedule shown in the previous section. The minimum quantities are guaranteed to be ordered by the university during the contract period.
10-100 Notebook Memory
200-300 Desktop Memory
200-800 Notebook Docking
Station
100-400 CRT Monitor
300-600 17” LCD Monitors
(A)
200-800 Notebook
200-800 Desktop
Cost (for Max Quantity) Estimated Quantity (Min – Max)
Item
0-100 DVD Writer
20-50 USB Storage
10-20 Video Adapter
300-500 USB Flash Memory 256
200-300 USB Flash Memory 512
0-100 Printer Tray
0-100 Printer – Type 4
0-100 Printer – Type 3
0-25 Printer – Type 2b
0-100 Printer – Type 2a
0-10 Printer – Type 1
0-100 18” LCD Monitors
100-200 17” LCD Monitors (D)
20-100 Hard Disk
Frame Agreement – Vendor Role Frame Agreement – Vendor Role
Fills the price for each item• price estimates spread over the year• pricing based on quantities • special discounts for educational institutions
Selection of the vendor • Technical specifications of the hardware proposed• Equipment pricing
Deliver hardware upon request Maintain Local Technical Support
• Hardware Engineer• Workshop• Spares
Frame Agreement – ITC RoleFrame Agreement – ITC Role• Use Enterprise Change Management System
• ITIL Compliant• Change Order Generated by Users• Compile Requests at Specified Intervals
• Prepare Orders for the Vendor• Ensure
• Prompt Processing of Approved Change Orders• Act as a Liaison between Originator and Vendor• Check Specifications and Software • Track all delivered hardware online• Accountability for all hardware received
• Enterprise Help Desk and Asset Management• Maintain Asset Inventory• Track Online and Issue Support Tickets • Route Tickets to Vendor
Framework Details PaymentPayment
Payment, based on quoted prices, will be made upon delivery of the requested Payment, based on quoted prices, will be made upon delivery of the requested hardware during each phase of the agreement. The standard university receiving hardware during each phase of the agreement. The standard university receiving procedures will be followed prior to issuance of check for the deliveries made. procedures will be followed prior to issuance of check for the deliveries made.
WarrantyWarrantyAll computer equipment, including accessories, should be supplied with three years All computer equipment, including accessories, should be supplied with three years on-site (KFUPM campuses) full warranty for labor and parts. on-site (KFUPM campuses) full warranty for labor and parts.
Technical SupportTechnical SupportDuring the warranty period, all computer equipment, including accessories, should During the warranty period, all computer equipment, including accessories, should be maintained with immediate onsite technical support in case of technical be maintained with immediate onsite technical support in case of technical problems and a maximum replacement period of 24 hours in case of hardware problems and a maximum replacement period of 24 hours in case of hardware failure. failure.
SoftwareSoftwareAll required software including the operating system, office suites, anti-virus All required software including the operating system, office suites, anti-virus software will be made available to the selected vendor for replication on the hard software will be made available to the selected vendor for replication on the hard disk prior to delivery. disk prior to delivery.