K.Hanke / TDR Meeting / 13 June 20 Linac 4 Diagnostics L4: L4: K. Hanke, M.Pasini K. Hanke, M.Pasini (requirements, specifications, (requirements, specifications, integration) integration) AB/BI: AB/BI: U.Raich et al. U.Raich et al. (technical responsibility) (technical responsibility)

K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

Embed Size (px)

DESCRIPTION

K.Hanke / TDR Meeting / 13 June 2006 Commissioning source/LEBT: intensity: retractable Faraday cup and beam current transformer. emittance: scanning slit device with SEM grid (also steering, quantify sc compensation and commission pre- chopper; time resolution required) measurement in stages: source, first solenoid, RFQ input plane energy spread: temporary set-up with slit, spectrometer and SEM grid; read-out of SEM time resolved; additional FC at exit of spectrometer line. RFQ and chopper line: IPHI diagnostic line (TOF energy measurement, dipole, wire scanners, pick-ups). chopper line: two beam current transformers and BSHM

Citation preview

Page 1: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

Linac 4 Diagnostics

L4:L4: K. Hanke, M.Pasini K. Hanke, M.Pasini (requirements, specifications, integration)(requirements, specifications, integration)

AB/BI:AB/BI: U.Raich et al. U.Raich et al.(technical responsibility)(technical responsibility)

Page 2: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

We divide the diagnostics in two main categories:commissioning and day-to-day operation.

The first will be used to find the right settings of the machine and to study the beam quality and machine performance.

The second will be used to survey the machine and for fine tuning.

General Remarks

Page 3: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

Commissioning

source/LEBT:intensity: retractable Faraday cup and beam current transformer. emittance: scanning slit device with SEM grid (also steering, quantify sc compensation and commission pre-chopper; time resolution required)measurement in stages: source, first solenoid, RFQ input planeenergy spread: temporary set-up with slit, spectrometer and SEM grid; read-out of SEM time resolved; additional FC at exit of spectrometer line.

RFQ and chopper line:IPHI diagnostic line (TOF energy measurement, dipole, wire scanners, pick-ups).chopper line: two beam current transformers and BSHM

Page 4: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

Commissioning

DTL tank 1, 2, 3:movable diagnostics bench (MB):transmission, transverse and longitudinal emittance, energy and energy spread, set rf phase and voltage.moving slit device (transv. emittance)energy degrader (set phase)Faraday cuptime-of-flight energy measurementbunch length measurement (Feschenko monitor)CCDTL, SCL:setting-up using the permanently installed diagnostics full commissioning (only at high energy): transport the beam to a permanently installed measurement line at the exit of the linac (depending on installation schedule)energy: spectrometer dipole in the ML and time-of-flight (phase pu) in the linacbunch length measurement (Feschenko monitor)

Page 5: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

Operation

source/LEBT/RFQ/chopper line:intensity: retractable Faraday cup and beam current transformer. profile: SEM grid.

RFQ and chopper line:intensity: two beam current transformers permanently installed upstream and downstream of the chopper.position/phase/intensity: 3 pick-ups

Page 6: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

Operation

DTL, CCDTL, SCL:position/phase/intensity: after each tank of the DTL, after each of the 8 modules of the CCDTL and after each of the 4 modules of the SCL.combined position and phase pu, which measures also the beam current within 5%.beam loss (interlock!): BLMs along the linac and transfer line. beam current: in addition “real” beam current transformers after DTL, CCDTL, SCL and in the transfer line (HEBT). beam profile (SEM grids): after tank 3 of the DTL, after modules 4 and 8 of the CCDTL and after modules 2 and 4 of the SCL.

Page 7: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

Exit of Linac and Transfer Line

exit of linac:measurement line for transverse and longitudinal emittance and energy, transformer

transfer line:position/phase/intensity: pick-ups, transformers and beam loss monitors.

Page 8: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

Diagnostics Overview

system position quantitytime-of-flight MB/Linac 1/1

spectrometer LEBT/MEBT/ML 1/1/1

phase pick-up MB/MEBT/DTL/CCDTL/SCL/HEBT 1/3/3/8/4/12

beam position monitor

MB/MEBT/DTL/CCDTL/SCL/HEBT 1/3/3/8/4/12

beam current transf. LEBT/MEBT/MB/DTL/CCDTL/SCL/HEBT

1/2/1/1/1/1/7

beam profile monitor LEBT/MB/DTL/CCDTL/SCL/BI 1/1/1/2/2/8

moving slit MB/ML/HEBT(LBE) 1/1/1

bunch length monitor

MB/ML 1/1

Faraday cup LEBT/MB 1/1

beam loss monitor MB/linac/HEBT 1/8/20

Page 9: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

Diagnostics Overview DTL

DTL tank1 DTL tank2 DTL tank3

BLMBLM

BLM

SEM Grid

Beam Loss Monitor

Beam Current Transformer

Position, Intensity and Phase pick-up

Page 10: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

CCDTL module1 CCDTL module2

CCDTL module3 CCDTL module4

BLM

BLM

Diagnostics Overview CCDTL 1-4

Page 11: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

CCDTL module5 CCDTL module6

CCDTL module7 CCDTL module8

BLM

BLM

Diagnostics Overview CCDTL 2-8

Page 12: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

SCL module1 SCL module2

SCL module3 SCL module4

BLM

BLM

Diagnostics Overview SCL

Page 13: K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical

K.Hanke / TDR Meeting / 13 June 2006

Technical Specifications

Need input from AB/BI

- Beam current transformer- SEM Grid- Bunch Length Monitor- Time of Flight- Spectrometer dipole- Phase, position and current pick-up- Beam Loss Monitor