Kick-Off Meeting, Day 2. Apr 12 , 2011 Pullman, Washington. Break-Out Discussions. Potential Topics for Break-Out Discussion. Integration of stand-alone models Cyberinfrastructure Economics Communications and Outreach. Integration of Stand-Alone Models. Degree of integration/coupling - PowerPoint PPT Presentation
Citation preview
Apr 12, 2011Pullman, Washington
KICK-OFF MEETING, DAY 2
BREAK-OUT DISCUSSIONS
POTENTIAL TOPICS FOR BREAK-OUT DISCUSSION
Integration of stand-alone models
Cyberinfrastructure
Economics
Communications and Outreach
INTEGRATION OF STAND-ALONE MODELS
Degree of integration/coupling
1-way (loose coupling)
Iterative coupling
Tight coupling
States/fluxes to pass between various models
Model rebuilding, simplification, or code translation?
MODEL SPACE/TIME DOMAINS
Set Purpose Time period
Model ConfigurationCompute Facility Who When
model input
1
Establish baseline results of models
as they are; model evaluation & calibration
2000to
2009
WRF-Noah reanalysis bluefire WSU first yearoffline CMAQ & MEGAN
modeled meteorology WSU WSUfirst 15 months
offline CropSystobserved meteorology
WSU WSU modeled meteorology
offline RHESSys
observed meteorology (and deposition?)
modeled meteorology, deposition, and ozone
modeled meteorology; no deposition, no ozone
offline VICobserved meteorology
WSU WSU modeled meteorology
2
Impacted of integrated WRF-
VIC (without biogeochemistry
modeling)
2000to
2009
WRF- VIC w/o RHESSys/CropSyst
reanalysis bluefire PNNL first year
offline CMAQ & MEGAN
modeled meteorology WSU WSUfirst 18 months
offline CropSystmodeled meteorology, deposition, & ozone
WSU WSU offline RHESSys offline VIC-RHESSys-CropSyst
WSU WSU
3Integrate all model
components
2000to
2009
WRF-VIC with RHESSys/CropSyst coupled to CMAQ & MEGAN
NCEP reanalysisNCAR
WyomingWSU
3rd or 4th year?
4 Future scenario2010
to2050
WRF-VIC with RHESSys/CropSyst coupled to CMAQ and MEGAN + CREM
CCSM4 climateNCAR
WyomingWSU
4th and 5th year
CYBERINFRASTRUCTURE NEEDS
1. Code Versioning Software
subversion, cvs, git
2. Data Storage
DateOne, HDF
3. Cluster Software Support
Virtualization, MapReduce, Hadoop
4. Document Sharing
DropBox, SharePoint, Google Group, code.google.com
5. Videoconferencing
Evo, MeetingPlace, LiveMeeting (MS), BigBlueButton, SharePoint, Elluminate, Adobe Connect, Skype
Refer to details in memo by Joe Vaughan
GROUP DISCUSSION ON PROJECT INTEGRATION
TIMELINE
Major milestones for entire 5-year project duration (see hand-out of project milestones)
Specific milestones for first year: need to determine
Design milestones to match specific objectives
1-way land/atmosphere impacts
2-way land/atmosphere impacts/feedback
Feedbacks with human decision making (economics)
Communications and outreach
WORKING GROUPS
Need to discuss what working groups will look like
Working groups will change throughout project duration
Initial working groups will be formed to accomplish first year milestones
MEETING FREQUENCY
Steering committee meetings
Bi-monthly in early stages, eventually monthly?
All faculty participants invited
Working group meetings: weekly to bi-monthly
All-faculty meetings: quarterly?
All-participant meetings (faculty&students): bi-annually?
E.g., Kick-off meeting, poster presentations, etc..
Peer review meetings: annually?
Outreach Meetings: bi-annually to annually?
CONCLUDING REMARKS