CityofKingstonWaterfront
RevitalizationProgramWaterfront Advisory Committee Update
December 15, 2011
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 2/29
Congratulations!• The Hudson River Maritime Center/Sloop Clearwater proposal
for
construction
of
a
HomePort facility
has
been
funded
by
New York State!
• This is a key project for Kingston’s Waterfront Revitalization
and will help advance and leverage additional projects and
investment.
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 3/29
HomePort
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 4/29
StructuralDesigns
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 5/29
ReviewofProgressToDate
Local
Waterfront
Revitalization
PlanState and local Waterfront Policies
Local Waterfront Revitalization Implementation Plan
Vision for
the
Waterfront
with
Implementation
Steps
“Must Do” Projects
Brownfield Opportunity Area Program
Activities of Private, Cultural and Commercial Partners
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 6/29
ProjectstoAdvancetheLWRP• Public Infrastructure
• Sewer Treatment Plant Odor Mitigation
• Construction of
Bulkhead
• Construction of Promenade
• Reconstruction of Broadway Median
• Reconstruction of East Strand Median (20 new parking
spaces)• Construction of Public Parking Lot (50 new parking spaces)
• Erosion Control Measures for Kingston Point
• Reinforcement of Footbridge to Kingston Point Park
• Façade Improvements
Trolley
Museum
building
• Improvements to Gallo Park
• Improvements to Kingston Public Docking Area (Rip Van
Winkle)
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 7/29
ProjectstoAdvancetheLWRP• Analyses and Designs
•
Rondout
Parking
and
Circulation
Study• Dayline Dock Replacement Concept Design
• Kingston Sewer Plant Façade Design
• Rondout Harbor Management Plan (Army Corps of Eng.)
• Environmental Site
Analyses
Level
I
• Ferry Feasibility Study
• Sewer Treatment Plan Façade Construction
• Waterfront Rail Refurbishment Project
Upcoming Projects• Stormwater and Flooding Engineering Management Plan
• Generic Environmental Impact Statement
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 8/29
GrantSources• New York State Department of State
•
New York
State
Office
of
Parks,
Recreation
and
Historic
Pres.
• Hudson Valley Greenway
• Empire State Development
• Army Corps of Engineers
• New York State Department of Transportation
• New York State Department of Environmental Conservation
• U.S. Department of Housing and Urban Development
• Federal Highway
Administration
• Federal Railroad Administration
• Local Initiative Items from local elected representatives• Estimated Grant Funding Total for these projects $6,200,000 +
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 9/29
PrivateInvestment
• Restaurants
• Shops
• Marinas
• Cultural Institutions
• Property Investment
• Estimated Private Investment • $16‐20,000,000
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 10/29
InterimResults• Sewer Treatment Plant Odor Mitigation has led to less
problems and complaints
• Visual Improvements on East Strand and Waterfront
• Oil Tanks Removed
• Auto Recycling Facility Cleared
• Brownfield Clean
‐up
Agreements
In
Place
on
2 properties
• Kingston Point Stabilized
• Walkway completed from Ravine Street and connects with
other
walkways
to
the
Steel
House‐
it
will
pass
the
new
HomePort project
• 75 new public parking spaces provided
• Increased visitation and business activity reported
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 11/29
What’sOnDeckfor2012‐2013
Sewer Treatment Plant Façade Design and Construction
Waterfront Rail Refurbishment Grant
Flooding and Stormwater Management RFP
Brownfield Opportunity Area Generic Environmental
Impact Statement
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 12/29
WaterfrontPlanningProcess• The LWRP set policies for the revitalization;
• The Implementation Plan listed public and private actions to
accomplish the
revitalization;
• Using grant funding, feasibility studies, construction designs
and actual construction projects are undertaken.
• Plans and studies (LWRP IP, BOA, Ferry Feasibility, Harbor Management;
Stormwater and
Flooding
Engineering)
are
all
meant to be components of the upcoming GEIS which will predict build out levels and analyze the environmental impacts, the infrastructure requirements, the mitigation of
brownfield areas,
plan
for
the
impact
of
water
rise
and
periodic flooding as well as an updated economic study. This
will help foster implementation of the revitalization on a
shorter timetable.
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 13/29
IconicWestStrand
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 14/29
FormerRecyclingYard
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 15/29
Forst MeatPackingFacility‐ Gone
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 16/29
KingstonPointConditons
BeforeErosionControlProject
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 17/29
KingstonPointParkFootbridge
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 18/29
OilTerminalBeforeRemoval
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 19/29
OilTanksBeforeandAfter
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 20/29
PromenadeConcept
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 21/29
WaterfrontPromenadeSite
BulkheadWorkCommencing
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 22/29
CompletedPromenade
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 23/29
PromenadeRibbonCutting
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 24/29
KingstonBeachPavilion
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 25/29
TheDayline Dockinit’sHeyday
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 26/29
Dayline DockReplacementConcept
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 27/29
FerryFeasibilityStudy
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 28/29
EastStrandMedianandParking
8/3/2019 Kingston Waterfront Plan
http://slidepdf.com/reader/full/kingston-waterfront-plan 29/29
KingstonWaterfrontProgress
• With the help of NYSDOS, NYSOPRHP, DOT, FHWA, GREENWAY,
the Waterfront Advisory Committee, Scenic Hudson,
Clearwater, the Maritime Museum and Trolley Museum, as
well as
Mayor
Sottile
and
the
Common
Council,
progress
has
been made over these last 10 years.
• There are still projects and challenges that lie ahead, and with
continued momentum
and
funding,
the
revitalization
will
be
advanced.
•
Kingston
is
indeed
a
jewel
on
the
Hudson,
with
the
best
waterfront in terms of the harbor reach, public access, events