FPSO ( Floating Production, Storage & Offloading )

PRESENTED BY :

INDONESIAN OIL AND GAS COMMUNITY (KMI) - BATAM

PREPARED BY : ABRAHAM IMAM MUTTAQINDEFRI MARTHA SUCI TRI ASIHERIS RISUDAGRACE LILIANA KAELANBAMBANG PURNOMO

KMI Batam Goes To Campus2004

Page 2: KMI Batam - FPSO

FPSO (Floating Production, Storage and Offloading)

J. Ray McDermott

Page 3: KMI Batam - FPSO

FPSO COMPONENTS

• Hull System– Hull– Mooring Support Structures

• Top Side Facilities– Modules– Central Pipe Racks– Flare Boom– Living Quarter– Control and Workshop Building– Riser Porches– Cranes

J. Ray McDermott

Page 4: KMI Batam - FPSO

FPSO BELANAK FIELD PROJECT

Page 5: KMI Batam - FPSO

FPSO BELANAK OVERVIEW (1)

J. Ray McDermott

Page 6: KMI Batam - FPSO

FPSO BELANAK OVERVIEW (2)• SPREAD MOORED FPSO• 1 MILLION BARRELS OF STORAGE• 120 PEOPLE ACCOMMODATION WITH HELIDECK• HULL DIMENSIONS (175.000 TONNES)

– 285 M OVERALL– 58 M BEAM– 27 M DEPTH– 255,000 TONNES DISPLACEMENT (APPROX)

• HULL DRY WEIGHT 44,000 TONNES• TOPSIDES WEIGHT : DRY WEIGHT : 23,240 t PLUS LQ

(1,218 T), OPERATING WEIGHT : 30,202 T• SERVICE LIFE OF 30 YEARS

Page 7: KMI Batam - FPSO

FPSO BELANAK OVERVIEW (3)

Living QuarterRiser Porches 2

Riser Porches 1

Flare Boom

6 Portside Modules

7 Starboard Modules

Hull

J. Ray McDermott

3 Central Pipe Racks

Page 8: KMI Batam - FPSO

PROJECT SEQUENCES

Engineering Design Procurement Fabrication/Assembly

o Structural Frame/Pancake Assemblyo Deck Plate / Grating Installationo Mechanical / Equipment Installationo Piping, E&I Installationo Loadout

Installation/IntegrationLifting Modules to Hull and tie ins modules to modules

Pre-Commissioning / Mechanical Completion Commissioning

Page 9: KMI Batam - FPSO

FPSO BELANAK PROJECT HIGHLIGHTS

• Fabrication, Integration and Mechanical Completion of Top Side Facilities in PT McDermott Indonesia Batam -Fabrication Yard

1. Production Modules (Starboard and Portside)- Module S1 : Chemical Injection- Module S2 : Export Gas Compressor Train A- Module S3 : Regeneration Module- Module S4 : LPG Gas Processing Train A- Module S5 : LP Compressor/Export Import- Module S6 : Utility- Module S7 : Power Generator Train C, D, E

Page 10: KMI Batam - FPSO

Cont’d FPSO BELANAK PROJECT HIGHLIGHTS

- Module P1 : Chemical Injection- Module P2 : Export Gas Compressor Train B- Module P3 : Gas Cooling and Treating- Module P4 : LPG Gas Processing Train B- Module P5 : Oil Separation- Module P7 : Power Generator Train A, B

2. Central Pipe Racks C1, C2, C3

3. Riser Porches R1 and R2

4. Flare Boom (F1)

5. Two units cranes

Page 11: KMI Batam - FPSO

FABRICATION SEQUENCE

J. Ray McDermott

Page 12: KMI Batam - FPSO

MODULE FABRICATION/ASSEMBLYStructural and Equipment Assembly

J. Ray McDermott

Page 13: KMI Batam - FPSO

MODULE FABRICATION/ASSEMBLYStructural Details Assembly

J. Ray McDermott

Page 14: KMI Batam - FPSO

MODULE FABRICATION/ASSEMBLYComplete In-Ground Module Assembly

J. Ray McDermott

Page 15: KMI Batam - FPSO

MODULE LOADOUT

J. Ray McDermott

Page 16: KMI Batam - FPSO

INTEGRATION / INSTALLATION SEQUENCE

J. Ray McDermott

Page 17: KMI Batam - FPSO

MODULE INSTALLATION / INTEGRATION

J. Ray McDermott

Page 18: KMI Batam - FPSO

FPSO BELANAK FACTS

• One of the most complex processing systems ever installed offshore in the world

• The biggest FPSO ever built in Asia Pacific Upstream Region

• Belanak FPSO uses 9 Flexible Risers from FPSO to subsea PLEMS for import export

• Belanak FPSO uses 63 MW Power Generation through Avon-Driven Turbine Generators

• Total Equipment in FPSO (Vessels and Skid) = 270 units