ACCEPTED
FORPR
OCESSIN
G-2020
January27
12:26PM
-SCPSC
-2014-13-A-Page
1of3
KNERGYSoLUTIoN$
January 21, 2020
Ms. Jocelyn BoydChief Clerk and AdministratorSouth Carolina Public Service Commission101 Executive Center DriveSuite 100Columbia, SC 29210
Dear Ms. Boyd:
Pursuant to Commission Order No. 2015-423, Chem-Nuclear Systems (CNS) issubmitting the attached monthly report of variable cost data to the Commission. Bycopy of this letter we are also submitting this report to the Office of Regulatory Staff(ORS).
The enclosed preliminary monthly report of variable cost data covers the month ofDecember. This report is similar in format to information that has been provided to theORS in support of the ORS audits of CNS'llowable costs. The monthly data will besummarized on an annual basis to develop variable cost rates that can be used as onepredictor of variable costs.
Sincerely
Benjamin S. Smith, P.E.Director, Barnwell Operations
Enclosure
c: Jay Jashinsky, Office of Regulatory StaffAnthony Sandonato, ORS/EnergyDeborah Ogilvie, EnergySo/ut/ons
JAN gpss)gPSC SC
hfdf",l /0~f
740 Osborn Road Barnwell, Souib Carolina 29812803.259.1 781 ~ Fax 803. 259.1477
ES-LPD-BDF-BSS-20-001
ACCEPTED
FORPR
OCESSIN
G-2020
January27
12:26PM
-SCPSC
-2014-13-A-Page
2of3
Variable Costs:
Variable Labor and Non-Labor Costs for December 2019
Commission Order No. 2015-423 identified the following categories of rates forprojecting Variable Labor and Non-Labor costs: vault purchase and inspection (pervault), ABC waste disposal (per shipment), slit trench operations (per slit trench offload),customei'assistance (per shipment), and trench records (per container).
The following table illustrates the Variable Labor and Non-Labor costs that would becalculated using the Variable Labor and Non-Labor rates identified in CommissionOrder No. 2019-422 for Fiscal Year 2019-2020 and the number of units in eachcategory:
Vault Purchase and Inspectioner vault
ABC Waste Disposal (per shipment)(total shipments, less slit trenchshi ments, less irre ular ro'ectshi ments
Slit Trench Operationser slit trench offload
Customer Assistance er shi mentTrench Records er container
Total Calculated VariablebLabor and Non-Labor Costs
UnitsVariable CostRate in OrderNo. 2019%22
$166.85
$2,556.56
$37,425.65$63.05
$202.10
CalculatedCost
$ 333.70
$5,113.12
$ 126.10$ 404.20
$5,977.12
The actual Variable Labor and Non-Labor costs experienced duringthe month resulted in a Total Variable Labor and Non-Labor cost of $8,701.89
740 Osborn Road Barnwell, South Carolina 29812803.259.1781 Fax 803.259.1477
ES-LPD-BDF-BSS-20-001
ACCEPTED
FORPR
OCESSIN
G-2020
January27
12:26PM
-SCPSC
-2014-13-A-Page
3of3
Vault Costs for December 2019
The following table illustrates the vault costs that would be calculated using VariableCost rates identified in Commission Order No. 2019-422 for Fiscal Year 2019-2020 andthe volumes of waste received in each respective category:
Cost incurred for disposal vaults procured: $32,76'7.20
740 Osborn Road Barnwell, Soaih Carolina 29812803.259.1 781 ~ Fax 803.259. 1477
ES-LPD-SDF-SSS-20-001