KoALICE Report 2013-10. In-Kwon Yoo Pusan National University. PID in ALICE. TOF. Why HMPID?. ALICE: the dedicated HI experiment. Full azimuthal coverage : ITS, TPC, ToF ITS, TPC upto p ~ 600 MeV/c ToF upto ~ 1.2 – 1.4 GeV/c Single-arm detector : HMPID for 1 – 5 GeV/c. HMPID. - PowerPoint PPT Presentation
Citation preview
+
KoALICE Report 2013-10 In-Kwon Yoo
Pusan National University
3+Why HMPID? PID in ALICE
Full azimuthal coverage : ITS, TPC, ToF
ITS, TPC upto p ~ 600 MeV/c
ToF upto ~ 1.2 – 1.4 GeV/c
Single-arm detector : HMPID for 1 – 5 GeV/c
ALICE: the dedicated HI experiment
3
Inner Tracking System (내부궤적장치 )
TOF
3
MUON Spectrometer:• absorbers• tracking stations• trigger chambers• dipole
HMPID
+KoALICE Organization &Status (2013-10)
PNU: Prof.3 + PhD.1 + PhD Stud.5 + MA Stud.5 + Sec.1 = 15
KWNU: Prof.1 + PhD.2 + PhD Stud.1 + MA Stud.1 = 5
Sejong: Prof.2 + MA Stud.1 = 3
Yonsei: Prof.2 + PhD Stud.5 + MA Stud.3 = 10
Inha: Prof.1 + MA Stud.3 = 4 … total: 37
Long stay at CERN: Prof.4 + PhD.3 + PhD Stud.6 + MA Stud.5 = 17
Short stay at CERN: Prof.3 + PhD Stud.1KoALICE II
4
KoALICE II
5
Multiplicity (dN/dh) in pp
J/Psi Particle Reconstruction
Lambda Anisotropy
Pomeron Reactions in pp 4p
pp Data Analyses
KoALICE II
6
New PID for Flow Analysis
Purity Study with the new PID
Flow Analysis
Heavy Flavor (NPE): c, b ee
AA Data Analyses
KoALICE II
7
Strong Interaction between Hadrons Anisotropy of Lambda-Antilambda pair Excitation states of Upsilon in QGP-
temperature
ALICE computing (Tier3)
Phenomenology vs. Data
8
Inner Tracking System (ITS): ~ 15 MCHFPerformance Study (Inha, PNU)Chip Test Systems (Inha, PNU, Yonsei)
Test using radioactive source (Source Test): 2013 ~ 2014
Test using Laser (Laser Test): 2014 ~ 2015Test using Synchrotron radiation
(Synchrotron Test): 2014 ~ 2015Chip-Design (Yonsei)Assembly & Module Tests (2015 ~ 2017)
ALICE Upgrade R&D
+KoALICE Budgets
(~kCHF) 2010 2011 2012 2013
CERN Budg
et
Substances 440 410 390 500
M&O-A 60 30
R&D 10 10 100 100
PNU Budg
et
Personal 80 70 100 100
Travel/Manage 20 30 30 30
R&D 75
간접비 30 30 40 45
총액 580 550 720 880KoALICE II
9
+
2007.5 2008.4 2009.4 2010.5 2011.5 2012.5 2013.5 2014.5 2015.5 2016.5 2017.5 2018.5 2019.5 2020.5 2021.5 2022.50
1
2
3
4
5
6
7
8
9
0
10
20
30
40
50
60
KoALICE CurvesInstitutes Basic Budget R&D budget budget/inst. Manpower
x 1
00 k
USD
, In
sti
tute
#
man
pow
er, M
&O
-A (p
ers
on
s)
KoALICE II
13
• Data Analysss• Detector M&O-A• Detector Upgrade R&D
Maximize visible achievements / Detector R&D contribution
3rd Phase
18+Decade Plan intended
Necessary for stable support
Detector R&D upgrade project: total 7 MCHF
for 5-6 yrs proposed
(kCHF) 2012
2013
2014
2015
2016
2017
합계
ALICE 150 300 (300) 600 600 300 2250
CMS 300 600 (600)
1200
1200 600 4500