K.PRAKASH B.E., (CIVIL ENGG), DFA, MBA,ALJABER ENGINEERINGCOMPANY L.L.CP.O.BOX 22801, DOHA-QATAR.Mobile No: +974 50251767Email: [email protected] Email: [email protected]
OBJECTIVE
To obtain a challenging position and implement the acquired skills and knowledge which add value to my organization goals, growth & objectives.
EDUCATION:
PROFESSIONAL QUALIFICATIONS:
MBA IN FINANCE & MATERIAL MANAGEMENT - NATIONAL INSTITUTE OF BUSINESS MANAGEMENT, CHENNAI-600 020. (Part - time).
B.E., CIVIL ENGINEER FROM ANNA UNIVERSITY OF GOVERNMENT COLLEGE OF ENGINEERING SALEM (Full time).
PROFESSIONAL EXPERIENCE: - Total Experience 10.4 years
7th.Project: Doha Metro Project – Red Line North UndergroundCompany Name: Salini impregilo S.P.APeriod: 19.10.2015 to Till Date Designation: SITE ENGINEER
SCOPE OF THE PROJECT To construct a high-quality, Underground Construction of Station& Tunnel Segments within five years at cost not to exceed 9billionsQataririyals
6th.Project: Orbital road projectCompany Name: ALJABER ENGINEERINGPeriod: 17.09.2014 to 18.10.2015Designation: SITE ENGINEER SCOPE OF THE PROJECT To construct a high-quality, Labor Camp & Internal Road & tank construction works within 1 year at cost not to exceed 140 million Qatari riyals
5th.Project: DELHI METRO RAIL PROJECT – PHASE IIICompany Name: L & T-Heavy Civil InfrastructureMetros, Bridges, Ports Business UnitPeriod: December 2012 to 9.9.2014Designation: ASSISTANT CONSTRUCTION MANAGER SCOPE OF THE PROJECT To construct a high-quality, Underground Construction of Station& Tunnel Segments within five years at cost not to exceed Rs1500crore.
4th .Company Name: Larsen & Toubro LtdProject: L&T SHIPYARD CUM PORTPROJECTPeriod: 24.05.2010 to December 2012Designation: SENIOR SITE ENGINEERSCOPE OF THE PROJECT To construct a high-quality, Shipyard cum Port project within eight years at cost not to exceed Rs7000crore.
3rd.Project: DELHI INTERNATIONAL AIRPORT (P) LTDCompany Name: PARSONS BRINCKERHOFF INDIA (P) LTD Period: September 2008 to 2009Designation: SITE INSPECTORSCOPE OF THE PROJECT To construct a high-quality, terminal 3 Delhi Indira Gandhi International Airport within eight years at cost not to exceed Rs25000crore.
2nd.Project: DELHI METRO RAILWAY PROJECT BC 22Company Name: SIMPLEX INFRASTRUCTURES LTDPeriod: March 2008 TO September 2008Designation: ASSISTANT ENGINEER GRADE II
SCOPE OF THE PROJECT To construct a high-quality, elevated metro railway & station Construction with in six years at cost not to exceed Rs900crore.
1st.Project: DEFENCE ORDNANCE DEPOTCompany Name: VISHAL INFRASTRUCTURE LTDPeriod: 2007 to march 2008Designation: TraineeSCOPE OF THE PROJECT To construct a high-quality, defense missile storage building & commercial building, Residential building within three years at cost not to exceed Rs260crore.
Project: RESIDENTIAL BUILDINGCompany Name: SAKTHI CONSTRUCTIONSPeriod: April 2001 to March 2003 Designation: SurveyorSCOPE OF THE PROJECT To construct a high-quality, Residential building within three years at cost not to exceed Rs180crore.
Surveying & Leveling for layout of building foundation & StructureProject: CIVIL SOFTWARESCompany Name: CADD CENTRETRAINING SERVICESPeriod: 6 month studying + 6 month workDesignation: Teacher
ROLES &RESPONSIBILITIES:
Construction of foundations and erections of fabrication
building.
Execution of Site work activities as per Codes Provisions,
Technical specification & GFC drawing.
Internal Road works.
Sewage water pipe line works
Firefighting pipe line works
Portable water tank construction.
Curbstone and Interlock works.
Tank construction works.
Construction of Underground Construction of Station.
Construction of Tunnel Segments.
Underground Excavation work.
Review and Finalizing the Vendors approval Conduct the internal Auditing Segmental Casting at Precast concrete for tunnel work
Construction of DWALL,ROOF SLAB,CONCOURSE SLAB,
BASE SLAB, PLUNGE COLUMN, BOX PUSHING ETC.
Estimating of material requirement for execution. Preparation of micro planning for execution of work, & Preparation
of Client and Sub-Contractor bill. Segmental Casting at Precast concrete for Birth & Breakwater
Erection Precast Beams, Slabs.
Internal Road works
Construction of Airport services building, cooling tower, HT
< tunnel, access tunnel, multi-level car parking.
Documentation Work.
Controlling of NON-CONFORMANCE REPORT Implementation of work activities as per approved Method
statements Internal Road works
Construction of elevated metro railway& station construction.
Preparing Check list of the project activities executed.
Implementation of work activities as per approved Method
statements.
Maintain site order book, daily progress report.
Estimating of material requirement for execution.
Segmental Casting at Precast Yard.
Erection Precast Beams, Slabs.
Execution of Site work activities as per Codes Provisions, Technical specification & GFC drawing.
Execution of steel work & concrete work. Preparing Check list of the project activities executed. Finalizing the Method statement for work Item wise. Work Experience in both QC lab and Concrete Batching Plant.
Teaching of below software’s Auto cad, archicad, staad pro, Revit architecture, MS-project, primavera
CERTIFICATES
MASTER DIPLOMA IN CIVIL CADD FROM CADD CENTRETRAINING SERVICES, ERODE (Part-time).
DIPLOMA IN FINANCIAL ACCOUNTING FROM TCIL IT A GOVT.OF INDIA ENTERPRISE (Part-time).
DIPLOMA IN COMPUTER HARDW ARE MAINTENANCE FROM TCIL IT (Part-time).
ADVANCED PROJECT MANAGEMENT FROM GREEN INTERNATIONAL (Part-time).
Personal information
Date of Birth: 29-07-1984Gender : MaleLanguages known: Tamil, English, HindiNationality: IndianMarital Status: Married